[Federal Register: November 18, 2002 (Volume 67, Number 222)]
[Notices]
[Page 69525-69526]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr18no02-54]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Accepted for Filing and Soliciting Motions
To Intervene and Protests
November 12, 2002.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New License.
b. Project No.: 2517-012-WV.
c. Date filed: December 17, 2001.
d. Applicant: Allegheny Energy Supply Company, LLC.
e. Name of Project: Dam No. 5 Hydro Station.
f. Location: On the Potomac River, near the Town of Hedgesville, in
Berkeley County, West Virginia.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Charles L. Simons, Allegheny Energy Supply
Company, LLC, 4350 Northern Pike, Monroeville, PA 15146, (412) 858-
1675.
i. FERC Contact: Peter Leitzke, (202) 502-6059 or
peter.leitzke@ferc.gov.
j. Cooperating agencies: We are asking Federal, state, local, and
tribal agencies with jurisdiction and/or special expertise with respect
to environmental issues to cooperate with us in the preparation of the
environmental document. Agencies who would like to request cooperating
status should follow the instructions for filing documents described in
item k below. k. Deadline for filing motions to intervene and protests
and requests for cooperating agency status: 60 days from the issuance
date of this notice.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Motions to intervene and protests and requests for cooperating
agency status may be filed electronically via the Internet in lieu of
paper. The Commission strongly encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's web
site (http://www.ferc.gov) under the ``e-Filing'' link. Please include
the project number (P-2517-012) on any comments or motions filed.
l. This application has been accepted, but is not ready for
environmental analysis at this time.
m. The existing Dam No. 5 Hydro Station Project consists of: (1) a
100-foot-long, 80-foot-wide headrace; (2) a brick and concrete
powerhouse containing two generating units with a total installed
capacity of 1,210 kilowatts; (3) a 250-foot-long, 90-foot-wide
tailrace; (4) a substation; and (5) appurtenant facilities. The
applicant estimates that the total average annual generation would be
5,945 megawatthours. All generated power is sold to Allegheny Power for
use in the existing electric grid system serving West Virginia and
Maryland. The project dam and reservoir are owned by the United States
and operated by the National Park Service.
[[Page 69526]]
n. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website at http://www.ferc.gov using the ``FERRIS'' link.
Enter the docket number excluding the last three digits in the docket
number field to access the document. For assistance, call 1-866-208-
3676 or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
o. Anyone may submit a protest or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, 385.211, and 385.214. In determining the appropriate
action to take, the Commission will consider all protests filed, but
only those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any protests
or motions to intervene must be received on or before the specified
deadline date for the particular application.
All filings must (1) bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application.
p. Procedural schedule and final amendments: The application will
be processed according to the following Hydro Licensing Schedule.
Revisions to the schedule will be made as appropriate.
Issue Scoping Document for comments--December 2002
Notice of application is ready for environmental analysis--March 2003
Notice of the availability of the EA--September 2003
Ready for Commission's decision on the application--November 2003
Unless substantial comments are received in response to the EA,
staff intends to prepare a single EA in this case. If substantial
comments are received in response to the EA, a final EA will be
prepared with the following modifications to the schedule.
Notice of the availability of the final EA--December 2003
Ready for Commission's decision on the application--December 2003
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Linwood A. Watson, Jr.,
Deputy Secretary.
[FR Doc. 02-29146 Filed 11-18-02; 8:45 am]