[Federal Register: December 11, 2002 (Volume 67, Number 238)]
[Notices]
[Page 76173-76174]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr11de02-32]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Request for Comment on the Revised Upland Erosion Control,
Revegetation and Maintenance Plan and the Wetland and Waterbody
Construction and Mitigation Procedures
December 5, 2002.
The Office of Energy Projects (OEP) staff has revised the Upland
Erosion Control, Revegetation and Maintenance Plan (Plan) and the
Wetland and Waterbody Construction and Mitigation Procedures
(Procedures) referred to at 18 CFR 157.206(b)(3)(iv) of the
Commission's regulations. The staff is providing one extra opportunity
for public comment on the proposed revisions.
The proposed revisions to the Plan and Procedures were advertised
by the Commission staff in a Notice issued January 11, 2002. This final
draft incorporates comments gathered over the past 8 months from the
natural gas pipeline industry and other agencies. The Plan and
Procedures were last updated December 2, 1994. Many of the staff's
proposed changes better address regional issues by converting some
[[Page 76174]]
measures into performance-based standards. Other modifications provide
necessary updates to reflect current laws and regulations.
We have posted final draft versions of the revised Plan and
Procedures on our Web site showing the changes in a redline and
strikeout format. The final drafts are available at http://www.ferc.gov/gas/environment/guidelines.htm
.
Comments on the proposed revisions should be sent by electronic
mail no later than December 20, 2002, to plan.comments@ferc.gov.
Linwood A. Watson, Jr.,
Deputy Secretary.
[FR Doc. 02-31189 Filed 12-10-02; 8:45 am]
BILLING CODE 6717-01-P