[Federal Register: May 2, 2003 (Volume 68, Number 85)]
[Notices]
[Page 23457-23458]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr02my03-46]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6639-8]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed April 21, 2003, through April 25, 2003.
Pursuant to 40 CFR 1506.9.
EIS No. 030183, Final EIS, AFS, UT, Uinta National Forest Revised Land
and Resource Management Plan, Implementation, Juab, Sanpete, Tooele,
Utah and Wasatch Counties, UT, Wait Period Ends: June 2, 2003, Contact:
Marlene DePietro (801) 342-5161.
EIS No. 030184, Draft EIS, AFS, AZ, Cross-County Travel by Off-Highway
Vehicle Project, To Restrict Motorized, Wheeled Cross-County Travel,
Apache-Sitegreaves, Conino, Kaibab, Prescott and Tonto National
Forests, AZ, Comment Period Ends: June 16, 2003, Contact: Jim Anderson
(928) 333-6370. This document is available on the Internet at: http://(www.fs.fed.us/r3/ohv
).
EIS No. 030185, Final Supplement, AFS, ID, Salmon Wild and Scenic River
Management Plan, Timeline Change From December 31, 2002 to December 31,
2005 and Clarification of Economic Impacts on the Campes, Stub Creek,
Arctic Creek and Smith Gulch Creek, Salmon National Forest, Salmon
County, ID, Wait Period Ends: June 2, 2003, Contact: Patricia Pearson
(208) 756-5148.
EIS No. 030186, Final EIS, AFS, WI, Northwest Howell Project, Timber
Harvest, Wildlife Openings Maintenance, Aspen and Jack Pine Types
Regeneration, Hardwood and Conifer Tree Seedlings Protection, Lakes
Habitat Improvements and Transportation System Development, Eagle-
Florence District, Chequameg-Nicolet National Forest, Forest and
Florence Counties, WI, Wait Period Ends: June 2, 2003, Contact: Shirley
Frank (715) 528-4464 Ext. 27.
EIS No. 030187, Draft EIS, FHW, MO, Missouri River Corridor, Widening
and Improvements a New Four Lane Expressway, Corridor consist of Four
Segments: Front Street, Chouteau Trafficway, South Riverfront
Expressway (SRE) and Little Blue Expressway (LBE), Jackson and Clay
Counties, MO, Comment Period Ends:
[[Page 23458]]
June 16, 2003, Contact: Allen Masuda (573) 636-7104.
EIS No. 030188, Final EIS, SFW, CA, Natomas Basin Habitat Conservation
Plan, Issuance of Incidental Take Permit and the Adoption of an
Implementing Agreement or Agreements, Natomas Basin, Sacramento and
Sutter Counties, CA, Wait Period Ends: June 2, 2003, Contact: Cay Goude
(916) 414-6600.
EIS No. 030189, Draft EIS, BLM, WY, Desolation Flats Natural Gas Field
Development Project, Drilling Additional Development Wells, Carbon and
Sweetwater County, WY, Comment Period Ends: July 1, 2003, Contact: John
Spehar (307) 328-4264. This document is available on the Internet at:
http://www.blm.gov/nepa.
EIS No. 030190, Final EIS, JUS, CA, Juvenile Justice Facility and East
County Hall of Justice, Proposal to Evaluate two Projects that could be
Constructed at one (Combined Siting) or (Separate Siting), Alamenda
County, CA, Wait Period Ends: June 2, 2003, Contact: Paul Delameter
(202) 514-7903.
EIS No. 030191, Draft EIS, FHW, LA, I-49 South Lafayette Regional
Airport to LA-88 Route US-90 Project, Upgrading Existing US-90 from the
Lafayette Regional Airport to LA-88, Iberia, Lafayette and St. Martin
Parishes, LA, Comment Period Ends: June 16, 2003, Contact: William C.
Farr (225) 757-7615.
EIS No. 030192, Draft EIS, COE, CA, Napa River Salt Marsh Restoration
Project, Proposing a Salinity Reduction and Habitat Restoration for
Napa River Unit, San Pablo Bay, Napa and Solano Counties, CA, Comment
Period Ends: June 16, 2003, Contact: Shirin Tolle (415) 977-8467.
Amended Notices
EIS No. 030078, Draft EIS, NPS, AK, Denali National Park and Preserve
Backcountry Management Plan and General Management Plan Amendment,
Implementation, AK, Comment Period Ends: May 30, 2003, Contact: Mike
Tranel (907) 257-2562. Revision of FR Notice Published on 3/7/2003: CEQ
Comment Period Ending on 5/7/2003 has been Extended to 5/30/2003.
EIS No. 030115, Draft EIS, FRC, CA, Pit 3, 4, 5 Hydroelectric Project,
(FERC No. 233-081), Application for New License, Pit River, Shasta-
Trinity National Forest, Shasta County, CA Comment Period Ends: May 21,
2003, Contact: John Mudre (202) 502-8902. Revision of FR Notice
Published on 3/21/2003: CEQ Comment Period Ending 5/5/2003 has been
Corrected to 05/21/2003.
EIS No. 030116, Draft EIS, COE, CA, Lower Cache Creek Flood Damage
Reduction Project, Implementation, City of Woodland and Vicinity, Yolo
County, CA, Comment Period Ends: June 4, 2003, Contact: Patti Johnson
(916) 557-6611. Revision of FR Notice Published on 3/21/2003: CEQ
Comment Period Ending 5/05/2003 has been Extended to 6/4/2003.
EIS No. 030141, Draft EIS, COE, TX, Gulf Intracoastal Waterway in the
Laguna Madre, Maintenance Dredging from the JFK Causeway to the Old
Queen Isabella Causeway, Nueces, Kleberg, Kenedy, Willacy and Cameron
County, TX, Comment Period Ends: June 19, 2003, Contact: Dr. Terry
Roberts (409) 766-3035. Revision of FR Notice Published on 4/4/2003:
CEQ Comment Period Ending 5/19/2003 has been Extended to 6/19/2003.
Dated: April 30, 2003.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 03-10897 Filed 5-1-03; 8:45 am]
BILLING CODE 6560-60-P