[Federal Register: August 1, 2003 (Volume 68, Number 148)]
[Notices]
[Page 45237-45238]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr01au03-61]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6642-5]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed July 21, 2003 through July 25, 2003
Pursuant to 40 CFR 1506.9.
EIS No. 030341, Draft EIS, IBR, CA, Lower Santa Ynez River Fish
Management Plan and Cachuma Project, Biological Opinion for
[[Page 45238]]
Southern Steelhead Trout, To Improve Habitat Conditions for the
Endangered Southern Steelhead, Santa Barbara County, CA, Comment Period
Ends: September 15, 2003, Contact: David Young (559) 487-5127.
EIS No. 030342, Draft EIS, NOA, Atlantic Tunas, Swordfish, and Sharks
Fishery Management Plan, To Prevent Overfishing and Rebuild Overfished
Species, Update Essential Fish Habitat, Atlantic, Gulf of Mexico and
Caribbean Sea, Comment Period Ends: September 23, 2003, Contact:
Christopher Rogers (301) 713-2347.
EIS No. 030343, Final EIS, AFS, UT, Duck Creek--Swains Access (Duck/
Swains), Management Project, Wildlife Habitat, Soil and Watershed
Conditions and Motorized Vehicle Use Management Improvements, Dixie
National Forest, Cedar City Ranger District, Iron, Garfield and Kane
Counties, UT, Wait Period Ends: September 2, 2003, Contact: Ronald S.
Wilson (435) 865-3200.
EIS No. 030344, Final EIS, AFS, AK, Finger Mountain Timber Sales,
Timber Harvesting, Implementation, U.S. Coast Guard, NPDES and COE
Section 10 and 404 Permits, Tongass National Forest, Sitka Ranger
District, AK, Wait Period Ends: September 2, 2003, Contact: Rick Abt
(907) 747-4226.
EIS No. 030345, Final EIS, AFS, WA, Gardin--Taco Ecosystem Restoration
Projects, Implementation, Vegetative Restoration, Road Closures, and
Decommissioning, and other Road Improvements, Colville National Forest,
Newport Ranger District, Pend Oreille and Stevens Counties, WA, Wait
Period Ends: September 2, 2003, Contact: Lynn Kaney (509) 447-7300.
EIS No. 030346, Final EIS, FHW, WV, New River Parkway Project, Design,
Construction and Management, between I-64 Interchanges to Hinton,
Raleigh and Summers Counties, WV, Wait Period Ends: September 19, 2003,
Contact: Greg Akers (304) 558-2885.
EIS No. 030347, Draft EIS, NRS, OK, Cavalry Creek Watershed
Supplemental Plan for Floodwater Retarding Structure No. 6, Washita
River Basin, Washita County, OK, Comment Period Ends: September 15,
2003, Contact: M. Darrel Dominick (405) 742-1206.
EIS No. 030348, Draft EIS, IBR, CA, Mendota Pool 10-Year Exchange
Agreements, To Provide Water to Irrigable Lands, Central Valley Project
Improvement (CVPIA), Fresno and Madera Counties, CA, Comment Period
Ends: September 30, 2003, Contact: David Young (559) 487-5127. This
document is available on the Internet at: http://www.usbr.gov or http://www.entrix.com
EIS No. 030349, Draft EIS, NOA, PR, VI, Generic Essential Fish Habitat
Amendment To: Spiny Lobster, Queen Conch, Reef Fish and Coral Fishery
Management Plans, Implementation, U.S. Caribbean, Extending to U.S.
Exclusive Economic Zone (NEZ), Virgin Islands and Puerto Rico, Comment
Period Ends: October 30, 2003, Contact: David Dale (727) 570-5317.
EIS No. 030350, Final EIS, BLM, ID, North Rasmussen Ridge Mine, Agrium
Conda Phosphate Operations, Proposal to Extend the Existing Mining
Operations, Federal Phosphate Leases I-04375 and I-07619 within the
Caribou-Targhee National Forest, and State Lease I-9313, Soda Springs,
Caribou County, ID, Wait Period Ends: September 2, 2003, Contact:
Wendell Johnson (208) 478-6353.
EIS No. 030351, Final EIS, JUS, CA, 14-Mile Border Infrastructure
System Completion along the United States and Mexico Border, Areas I, V
and VI, Pacific Ocean to just east of Tin Can Hill, San Diego County,
CA, Wait Period Ends: September 2, 2003, Contact: Kevin Feeney (202)
353-9412.
EIS No. 030352, Second Draft EIS (TIERING) FHW, MI, MI-59 Livingston
County Widening Project, between I-96 and U.S. 23, Practical
Alternative and a No Build Alternative for Consideration in the Right-
of-Way Preservation Corridor, Funding, NPDES and U.S. Army COE Section
404 Permits Issuance, Livingston County, MI, Comment Period Ends:
September 15, 2003, Contact: Abdelmoez Abdalla (517) 702-1820.
EIS No. 030353, Draft EIS, USA, LA, 2nd Armored Cavalry Regiment
Transformation and Installation Mission Support, Joint Readiness
Training Center (JRTC) Stryker Brigade Combat Team, Long-Term Military
Training Use of Kisatchie National Forest Lands, Fort Polk, LA, Comment
Period Ends: September 15, 2003, Contact: Stacy Basham-Wagner (337)
531-7458.
Amended Notices
EIS No. 030194, Draft EIS, AFS, SD, Sioux Ranger District Oil and Gas
Leasing Project, Implementation, Sioux Ranger District, Custer National
Forest, Harding County, SD, Comment Period Ends: August 7, 2003,
Contact: Laurie Waters-Clark (605) 707-4432. Revision of FR Notice
Published on 5/9/2003: CEQ Comment Period Ending 7/8/2003 has been
Extended to 8/7/2003.
EIS No. 030283, Draft EIS, AFS, ID, North End Sheep Allotment
Management Plan (AMP) Revision, Proposal to Authorize Continued
Livestock Use, Caribou-Targhee National Forest, Soda Springs Ranger
District, Caribou and Bonneville Counties, ID, Comment Period Ends:
August 18, 2003, Contact: Derek Hinckley (208) 547-4356. Revision of FR
Notice Published on 6/20/2003: CEQ Comment Period Ending on 8/4/2003
has been Extended to 8/18/2003.
Dated: July 28, 2003.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 03-19641 Filed 7-31-03; 8:45 am]
BILLING CODE 6560-50-P