[Federal Register: August 15, 2003 (Volume 68, Number 158)]
[Notices]
[Page 48901-48902]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr15au03-58]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6642-8]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
[[Page 48902]]
Weekly receipt of Environmental Impact Statements
Filed August 4, 2003 Through August 8, 2003
Pursuant to 40 CFR 1506.9.
EIS No. 030365, Final EIS, NPS, PA, Living With The River: Schuylkill
River Valley National Area Management Plan, Implementation, Schuylkill,
Chester, Philadelphia, Belks, and Montgomery Counties, PA, Wait Period
Ends: September 8, 2003, Contact: Peter Samuel (215) 597-1848.
The above NPS EIS should have appeared in the 8/8/2003 Federal
Register. The 30-day Wait Period is Calculated from 8/8/2003.
EIS No. 030366, Final EIS, NPS, NC, Carl Sandburg Home National
Historic Site, General Management Plan, Implementation, Located in the
Village of Flat Rock, Henderson County, NC, Wait Period Ends: September
15, 2003, Contact: Connie Hudson-Bucklund (828) 693-4179.
EIS No. 030367, Draft EIS, IBR, CA, Freeport Regional Water Project, To
Construct and Operate a Water Supply Project to Meet Regional Water
Supply Needs, Sacramento County Water Agency (SCWA) and the East Bay
Municipal Utility District (EBMUD), Alameda, Contra Costa, San Joaquin,
Sacramento Counties, CA, Comment Period Ends: September 29, 2003,
Contact: Rod Schroeder (916) 989-7274.
EIS No. 030368, Draft EIS, NPS, AZ, Coronado National Memorial General
Management Plan, Implementation, Cochise County, AZ, Comment Period
Ends: October 14, 2003, Contact: John Paige (303) 969-2356.
EIS No. 230369, Draft EIS, BLM, OR, Timbered Rock Fire Salvage and Elk
Creek Watershed Restoration Project, Implementation, Northwest Forest
Plan, Butte Falls Resource Area, Medford District, Douglas, Jackson and
Josephine Counties, OR, Comment Period Ends: October 14, 2003, Contact:
Jean Williams (541) 944-6620. This document is available on the
Internet at: http://www.or.blm.gov/Medford/TimbrockEIS.
EIS No. 030370, Draft EIS, BLM, OR, Upper Siuslaw Late-Successional
Reserve Restoration Plan, To Protect and Enhance Late-Successional and
Old-Growth Forest Ecosystems, Eugene District Resource Management Plan,
Northwest Forest Plan, Coast Range Mountains, Lane and Douglas
Counties, OR, Comment Period Ends: October 15, 2003, Contact: Rick
Colvin (541) 683-6600.
EIS No. 030371, Final EIS, FRC, CA, El Dorado Hydroelectric Project,
Application for a New License, South Fork of the American River Basin
and Truckee River Basin (FERC NO. 184-065), El Dorado National Forest,
Lake Tahoe Basin Management Unit, Alpine, Amador and El Dorado
Counties, CA, Wait Period Ends: September 15, 2003, Contact: Susan
O'Brien (202) 502-8449. This document is available on the Internet at:
http://www.ferc.gov.
EIS No. 030372, Draft Supplement, COE, WV, Lower Mud River at Milton
Project, Updated Information on the Milton Local Protection Project,
Proposed Flood Damage Reduction Measure, City of Milton, Cabell County,
WV, Comment Period Ends: September 29, 2003, Contact: S. Michael Worley
(304) 529-5636.
EIS No. 030373, Final Supplement, AFS, CA, Herger-Feinstein Quincy
Library Group Forest Act Pilot Project, Proposal to Analyze Options for
Maintaining Defensible Fuel Profile Zones (DFPZs), Lassen, Plumas and
Tahoe National Forests, Shasta, Lassen, Tehama, Yuba, Plumas and Battle
Counties, CA, Wait Period Ends: September 15, 2003, Contact: Linda
Kanski (530) 283-7821.
EIS No. 030374, Draft EIS, AFS, CA, South Tahoe Public Utility District
(STPUD) B-Line Phase III Wastewater Export Pipeline Replacement
Project, Luther Pass Pump Station to U.S. Forest Service Luther Pass
Overflow Campground Access Road, Special Use Permit, U.S. Army COE
Section 404 and US Fish and Wildlife Service Permits Issuance and EPA
Grant, El Dorado and Alpine Counties, CA, Comment Period Ends:
September 29, 2003, Contact: Gary Weigel (530) 543-2665.
EIS No. 030375, Final EIS, TVA, TN, NC, VA, Adoption--Patriot Project,
Construction and Operation of Mainline Expansion and Patriot Extension
in order to Transport 510,000 dekatherms per day (dth/day) of Natural
Gas, TN, VA and NC, Contact: Harold M. Draper (865) 632-6889. Tennessee
Valley Authority's has adopted the Federal Regulatory Commission's
Final EIS, 020401 filed 09-20-2002. TVA was a Cooperating
Agency for the above final EIS. Recirculation of the document is not
necessary under Section 1506.3(c) of the Council on Environmental
Quality Regulations.
Dated: August 12, 2003.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 03-20902 Filed 8-14-03; 8:45 am]
BILLING CODE 6560-50-U