    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Original Minor License.
    b. Project No.: P-12449-000.
    c. Date filed: February 28, 2003.
    d. Applicant: Neshkoro Power Associates, LLC.
    e. Name of Project: Big Falls Milldam Hydroelectric Project.
    f. Location: On the Little Wolf River (north branch), near the 
Village of Big Falls, in Waupaca County, Wisconsin. The project does 
not affect any federal lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Charles Alsberg, North American Hydro, 
Inc., P.O. Box 167, Neshkoro, Wisconsin 54960, 920-293-4628 ext. 11.    i. FERC Contact: Timothy Konnert, Timothy.Konnert@ferc.gov (202) 
502-6359.
    j. Deadline for filing motions to intervene and protests: 60 days 
from the issuance date of this notice.
    All documents (original and eight copies) should be filed with: 
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    Motions to intervene and protests may be filed electronically via 
the Internet in lieu of paper. The Commission strongly encourages 
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions 
on the Commission's Web site (http://www.ferc.gov) under the ``e-
Filing'' link.
    k. This application has been accepted for filing, but is not ready 
for environmental analysis at this time.
    l. Project Description: The existing Big Falls Milldam 
Hydroelectric Project consists of the following facilities: (1) A 256-
foot-long by 18-foot-high dam, topped with a 76-foot-long fixed crest 
ogee with 6-inch flashboards and one 16-foot-wide Taintor gate; (2) a 
23.27-acre reservoir (Big Falls Flowage) with a negligible gross 
storage capacity at a normal elevation of 901.65 feet Mean Sea Level; 
(3) a 7-foot-diameter by 175-foot-long penstock leading to; (4) a 
powerhouse containing one, vertical-shaft Francis turbine-generator 
with an installed generating capacity of 350 kilowatts (kW), producing 
a total of 1,513,514 kilowatt-hours (kWh) annually; (5) a 100 foot 
long, 12,470-volt transmission line; and (6) appurtenant facilities.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary `` 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for 
inspection and reproduction at the address in item h above.
    Register online at http://www.ferc.gov /esubscribenow.htm to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, contact FERC Online Support. To 
view upcoming FERC events, go tohttp://www.ferc.gov and click on ``View 
Entire Calendar.''
    n. Anyone may submit a protest or a motion to intervene in 
accordance with the requirements of Rules of Practice and Procedure, 18 
CFR 385.210, 385.211, and 385.214. In determining the appropriate 
action to take, the Commission will consider all protests

[[Page 55390]]

filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
protests or motions to intervene must be received on or before the 
specified deadline date for the particular application.
    When the application is ready for environmental analysis, the 
Commission will issue a public notice requesting comments, 
recommendations, terms and conditions, or prescriptions.
    All filings must (1) bear in all capital letters the title 
``PROTEST'' or ``MOTION TO INTERVENE,'' ``NOTICE OF INTENT TO FILE 
COMPETING APPLICATION,'' or ``COMPETING APPLICATION;'' (2) set forth in 
the heading the name of the applicant and the project number of the 
application to which the filing responds; (3) furnish the name, 
address, and telephone number of the person protesting or intervening; 
and (4) otherwise comply with the requirements of 18 CFR 385.2001 
through 385.2005. Agencies may obtain copies of the application 
directly from the applicant. A copy of any protest or motion to 
intervene must be served upon each representative of the applicant 
specified in the particular application.

Magalie R. Salas,
Secretary
[FR Doc. 03-24237 Filed 9-24-03; 8:45 am]

BILLING CODE 6717-01-P