[Federal Register: October 3, 2003 (Volume 68, Number 192)]
[Notices]               
[Page 57444-57445]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr03oc03-65]                         

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6644-3]

 
Environmental Impact Statements; Notice of Availability

RESPONSIBLe AGENCY: Office of Federal Activities, General Information 
(202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed September 22, 2003 Through September 26, 2003
Pursuant to 40 CFR 1506.9.

EIS No. 030429, Draft EIS, FHW, TN, Appalachian Development Highway 
System Corridor K (Relocated Highway U. S. 64), Improvements from West 
of the Ocoee River to TN-68 near Ducktown, Funding, U.S. Army Corps 
Section 10 and 404 Permits, Polk County, TN, Comment Period Ends: 
January 15, 2004, Contact: Bobby W. Blackmon (615) 781-5770.
EIS No. 030430, Final EIS, COE, TX, Gulf Intracoastal Waterway in the 
Laguna Madre, Maintenance Dredging from the JFK Causeway to the Old 
Queen Isabella Causeway, Nueces, Kleberg, Kenedy, Willacy and Cameron 
County, TX, Wait Period Ends: November 3, 2003, Contact: Dr. Terry 
Roberts (409) 766-3035. This document is available on the Internet at: 
http://www.swg.usace.army.mil/.
EIS No. 030431, Final EIS, AFS, NM, Bluewater Ecosystem Management 
Project, Proposes to Initiate Vegetation Treatments to Restore 
Ponderosa Pine and Pinon-Juniper Stands to a Desired Condition, Cibola 
National Forest, Mt. Taylor Ranger District, McKinley and Cibola 
Counties, NM, Wait Period Ends: November 3, 2003, Contact: Chuck 
Hagerdon (505) 287-8833.
EIS No. 030432, Draft EIS, AFS, OR, Toolbox Fire Recovery Project, 
Promote the Recovery of the Toolbox Complex Fires of July 2002, 
Fremont-Winema National Forest, Silver Lake Ranger District, Lake 
County, OR, Comment Period Ends: November 17, 2003, Contact: Rick 
Elston (541) 576-7569. This document is available on the Internet at: 
http://www.fs.fed.us/r6/winema/management/analyses/toolbox/index.shtm1.
EIS No. 030433, Final EIS, BLM, WY, Snake River Resource Management 
Plan, BLM-Administrated Public Land and Resources Allocation and 
Management, Snake River, Jackson Hole, Teton County, WY, Wait Period 
Ends: November 3, 2003, Contact: Walt George (307) 775-6116.
EIS No. 030434, Final EIS, AFS, ID, North End Sheep Allotment 
Management Plan (AMP) Revision, Proposal to Authorize Continued 
Livestock Use, Caribou-Targhee National Forest, Soda Springs Ranger 
District, Caribou and Bonneville Counties, ID, Wait Period Ends: 
November 3, 2003, Contact: Derek Hinckley (208) 547-4356.
EIS No. 030435, Draft EIS, BLM, OR, Andrews Management Unit/Steens 
Mountain Cooperative Management and Protection Area Resource Management 
Plan, Implementation, Harney and Malheur Counties, OR, Comment Period 
Ends: December 31, 2003, Contact: Gary Foulkes (541) 573-4541.
EIS No. 030436, Final EIS, FRC, NY, St. Lawrence-FDR Hydroelectric 
Project, Application for New License (Relicense), (FERC No. 200-036), 
Located on the St. Lawrence River, Messina, NY, Wait Period Ends: 
November 3, 2003, Contact: Ed Lee (202) 502-6082. This document is 
available on the Internet at: http://www.ferc.gov.
EIS No. 030437, Draft EIS, IBR, CA, Pajaro Valley Water Management 
Agency (PVWMA) Revised Basin Management Plan Project, Connection

[[Page 57445]]

of PVWMA Pipeline to the Santa Clara Conduit of the Central Valley 
Project (CVP), Santa Cruz, Monterey and San Berito Counties, CA, 
Comment Period Ends: December 2, 2003, Contact: Lynne Silva (559) 487-
5807.
EIS No. 030438, Final EIS, FHW, WA, Cross-Base Highway Project (WA-
704), New Roadway Construction between I-5 at the Thorne Lane 
Interchange and WA-7 at 176th Street South Major Investment Study (MIS) 
and US Army COE Section 404 Permit Issuance, Pierce County, WA, Wait 
Period Ends: November 14, 2003, Contact: Steve Saxton (360) 753-9411.
EIS No. 030439, Draft EIS, AFS, WY, Blackhall-McAnulty Analysis Area, 
Proposal to Reduce the Spread of Dwarf Mistletoe and Mountain Pine 
Beetle in Lodgepole Pine Stands, Brush Creek/ Hayden Ranger District, 
Medicine Bow-Routt National Forests and Thunder Basin National 
Grassland, Carbon County, WY, Comment Period Ends: November 17, 2003, 
Contact: Terry Delay (307) 326-2518. This document is available on the 
Internet at: http://www.fs.fed.us/mrnf.
EIS No. 030440, Draft EIS, GSA, DC, Southeast Federal Center 
Development, Land Transfer for Mixed-Use Development of Residences, 
Offices, Shops, a Waterfront Park and Cultural Amenities, 
Implementation, DC, Comment Period Ends: November 19, 2003, Contact: 
Arthur Turowski (202) 708-5891.
EIS No. 030441, Final EIS, AFS, ID, Salmon-Challis National Forest 
Noxious Weed Management Program, Integrated Series of Weed Treatment 
and Non-Treatment Practices Implementation, Custer, Lemhi, Butte and 
Blaine Counties, ID, Wait Period Ends: November 3, 2003, Contact: 
William Diage (208) 756-5567.
EIS No. 030442, Draft EIS, USA, HI, Transformation of the 2nd Brigade, 
25th Infantry Division (Light) to a Stryker Brigade Combat Team in 
Hawai'i, Implementation, Honolulu and Hawai'i Counties, HI, Comment 
Period Ends: November 17, 2003, Contact: Cindy Barger (808) 438-4812. 
This document is available on the Internet at: http://www.sbcteis.com.
EIS No. 030443, Draft EIS, FHW, OH, IN, US-24 Transportation 
Improvements Project, from Interstate 469 in New Haven, Indiana to Ohio 
Route 15 in Defiance, Funding, NPDES Permit and US Army COE Section 404 
Permit, Westernmost and Allen Counties, IN and Paulding and Defiance 
Counties, OH, Comment Period Ends: November 21, 2003, Contact: Mark L. 
Vonder Embse (614) 280-6854.
EIS No. 030444, Final EIS, NRS, OK, Cavalry Creek Watershed 
Supplemental Plan for Floodwater Retarding Structure No. 6, Washita 
River Basin, Washita County, OK, Wait Period Ends: November 3, 2003, 
Contact: M. Darrel Dominick (405) 742-1206.
EIS No. 030445, Final EIS, NPS, MN, Grand Portage National Monument 
General Management Plan, Implementation, Cook County, MN, Wait Period 
Ends: November 3, 2003, Contact: Tim Cochrane (218) 387-2788.
EIS No. 030446, Draft Supplement, FTA, NC, South Corridor Downtown 
Amendment Project, Evaluate a Downtown Portland Mall Light Rail Transit 
(LRT) Alignment to the I-205 Light Rail Transit Alternative, Funding, 
Clackamas and Multnomah Counties, OR, Comment Period Ends: November 17, 
2003, Contact: Sharon Kelly (503) 797-1756.
EIS No. 030447, Final EIS, SFW, CA, Western Riverside County Multiple 
Species Habitat Conservation Plan (MSHCP), Implementation, Incidental 
Take Permits Issuance, Riverside and Orange County, CA, Comment Period 
Ends: November 3, 2003, Contact: Jim Bartel (760) 431-9440.
EIS No. 030448, Draft EIS, FHW, FL, Indian Street Bridge PD&E Study, 
New Bridge Crossing of the South Fork of the St. Lucie River County 
Road 714 (Martin Highway)/SW 36th Street/ Indian Street from Florida's 
Turnpike to East of Willoughby Boulevard, Martin County, FL, Comment 
Period Ends: December 1, 2003, Contact: James Mathews (850) 942-9650.

Amended Notices

EIS No. 030333, Draft EIS, IBR, CA, Battle Creek Salmon and Steelhead 
Restoration Project, Restoring Habitat in Battle Creek and Tributaries, 
License Amendment Issuance, Implementation, Tehama and Shasta Counties, 
CA, Comment Period Ends: October 16, 2003, Contact: Mary Marshall (916) 
978-5248. Revision of FR Notice Published on 7/25/2003: CEQ Comment 
Period Ending 9/22/2003 has been Extended to 10/16/2003.

    Dated: September 22, 2003.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. 03-25139 Filed 10-2-03; 8:45 am]

BILLING CODE 6560-60-P