[Federal Register Volume 68, Number 199 (Wednesday, October 15, 2003)]
[Notices]
[Pages 59389-59390]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 03-26035]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. AC04-1-000, et al.]
PJM Interconnection L.L.C., et al.; Electric Rate and Corporate
Filings
October 7, 2003.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. PJM Interconnection, L.L.C.
[Docket No. AC04-1-000]
Take notice that on October 1, 2003, PJM Interconnection, L.L.C.
(PJM) tendered for filing with the Federal Energy Regulatory Commission
(Commission) a letter addressed to John M. Delaware, Chief Accountant
of the Commission, requesting authorization to defer depreciation of
certain capital costs, required to integrate additional transmission
owners into its markets and systems, until January 1, 2005. PJM then
proposes to amortize the deferred amounts, plus finance charges, over
36 months, beginning on January 1, 2005. Action on this accounting
request will affect the determination of amounts to be billed under
PJM's formula tariff.
Comment Date: October 21, 2003.
2. Georgia Natural Gas Company
[Docket No. ER03-1403-000]
Take notice that on September 30, 2003, Georgia Natural Gas Company
(f/k/a Atlanta Gas Light Services, Inc.) (f/k/a The Energy Spring,
Inc.) pursuant to Section 35.15 of the Commission's regulations, 18 CFR
35.15, submitted a Notice of Cancellation to terminate its Electric
Rate Schedule FERC No. 1. Georgia Natural Gas Company requests an
effective date of October 31, 2003.
Comment Date: October 21, 2003.
3. PPM Colorado Wind Ventures, Inc.
[Docket No. EG04-2-000]
Take notice that on October 1, 2003, PPM Colorado Wind Ventures,
Inc. (PPM Colorado) tendered for filing an Application for
Determination of Exempt Wholesale Generator Status (Application)
pursuant to Section 32 of the Public Utility Holding Company Act of
1935.
PPM Colorado states that a copy of the Application has been sent to
the Public Utilities Commission of Colorado, the California Public
Utilities Commission, the Oregon Public Utility Commission, the
Washington Utilities and Transportation Commission, the Utah Public
Service Commission, the Idaho Public Utilities Commission, and the
Wyoming Public Service Commission, as ``affected state commissions''
under 18 CFR 365.2(b)(3), and the Securities and Exchange Commission.
Comment Date: October 28, 2003.
4. Southeastern Power Administration
[Docket No. EF03-3011-000]
Take notice that on September 30, 2003, the Deputy Secretary of
Energy confirmed and approved on an interim basis, effective on October
1, 2003, Rate Schedules SOCO-1-B, SOCO-2-B, SOCO-3-B, SOCO-4-B, ALA-1-
K, MISS-1-K, Duke-1-B, Duke-2-B, Duke-3-B, Duke-4-B, Santee-1-B,
Santee-2-B, Santee-3-B, Santee-4-B, SCE&G-1-B, SCE&G-2-B, SCE&G-3-B,
SCE&G-4-B, Regulation-1, Replacement-1, Pump-1-A, and Pump-2 for power
from Southeastern Power Administration's (Southeastern) Georgia-
Alabama-South Carolina System. The rate schedules have been submitted
to the Federal Energy Regulatory Commission for confirmation and
approval on a final basis, effective October 1, 2003, and ending
September 30, 2007.
The Deputy Secretary of Energy states that the Commission, by order
issued July 15, 2003, in Docket No. EF02-3011-000, confirmed and
approved Rate Schedules SOCO-1-A, SOCO-2-A, SOCO-3-A, SOCO-4-A, ALA-1-J
MISS-1-J, Duke-1-A, Duke-2-A, Duke-3-A, Duke-4-A, Santee-1-A, Santee-2-
A, Santee-3-A, Santee-4-A, SCE&G-1-A, SCE&G-2-A, SCE&G-3-A, SCE&G-4-A,
and Pump-1-A, Pump-2, and Regulation-1 and Replacement-1. Southeastern
proposes in the instant filing to replace these rate schedules.
Comment Date: October 28, 2003.
5. Southeastern Power Administration
[Docket No. EF03-3021-000]
Take notice that on September 30, 2003, the Deputy Secretary of the
Department of Energy confirmed and approved on an interim basis,
effective on October 1, 2003, Rate Schedules CBR-1-E, CSI-1-E, CEK-1-E,
CM-1-E, CC-1-F, CK-1-E, CTV-1-E, and SJ-1-B for power from Southeastern
Power Administration's (Southeastern) Cumberland System of Projects.
The rate schedules have been submitted to the Federal Energy Regulatory
Commission for confirmation and approval on a final basis effective
October 1, 2003 and ending September 30, 2008.
The Deputy Secretary states that the Commission, by order issued
March 17, 2000, in Docket No. EF99-3021-000, confirmed and approved
Rate Schedules CBR-1-D, CSI-1-D, CK-1-D, CC-1-E,
[[Page 59390]]
CM-1-D, CEK-1-D, CTV-1-D, and SJ-1-A. Southeastern proposes in the
instant filing to replace these rate schedules.
Comment Date: October 28, 2003.
Standard Paragraph
Any person desiring to intervene or to protest this filing should
file with the Federal Energy Regulatory Commission, 888 First Street,
NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214). Protests will be considered by the Commission in determining
the appropriate action to be taken, but will not serve to make
protestants parties to the proceeding. Any person wishing to become a
party must file a motion to intervene. All such motions or protests
should be filed on or before the comment date, and, to the extent
applicable, must be served on the applicant and on any other person
designated on the official service list. This filing is available for
review at the Commission or may be viewed on the Commission's Web site
at http://www.ferc.gov, using the eLibrary (FERRIS) link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. For assistance, please contact FERC
Online Support at [email protected] or toll-free at (866) 208-
3676, or for TTY, contact (202) 502-8659. Protests and interventions
may be filed electronically via the Internet in lieu of paper; see 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site under the ``e-Filing'' link. The Commission strongly encourages
electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. 03-26035 Filed 10-14-03; 8:45 am]
BILLING CODE 6717-01-P