[Federal Register: November 7, 2003 (Volume 68, Number 216)]
[Notices]
[Page 63084-63085]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr07no03-58]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6645-3]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at (202) 564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in FR dated April 4, 2003 (68 FR 16511).
Draft EISs
ERP No. D-AFS-J65390-CO Rating EC1, Arapaho National Recreation
Area Forest Health and Fuels Reduction Project, Pre-Suppression
Measures for Mountain Pine Beetle Infestation Reduction in Stands of
Lodgepole Pine, Implementation, Arapaho National Forest, Sulphur Ranger
District, Grand County, CO.
Summary: EPA expressed environmental concern due to project impacts
related to disturbances within roadless areas, contiguous terrestrial
habitat and watersheds.
ERP No. D-FHW-G40177-LA Rating LO, Kansas Lane Connector Project,
Construction between U.S. 80 (Desiard Street) and U.S. 165 and the
Forsythe Avenue Extension, U.S. Army COE Section 10 and 404 Permits
Issuance, City of Monroe, Quachita Parish, LA.
Summary: EPA has no objections to the selection of the preferred
alternative.
ERP No. D-FRA-E40799-FL Rating EC1, Florida High Speed Rail from
Tampa to Orlando, Transportation Improvement, NPDES Permit and US Army
COE Section 404 Permit, Hillsborough, Orange, Osceola and Polk
Counties, FL.
Summary: EPA has environmental concerns with the proposed project
regarding noise, vibration, hazardous waste sites and potential
environmental impacts to air quality, wetlands, floodplains and other
aquatic resources.
ERP No. D-NOA-A91069-00 Rating EC2, Atlantic Tunas, Swordfish, and
Sharks Fishery Management Plan, To Prevent Overfishing and Rebuild
Overfished Species, Update Essential Fish Habitat, Atlantic, Gulf of
Mexico and Caribbean Sea.
Summary: EPA expressed concern that the document had not adequately
explained alternatives and impact analyses. EPA recommended that the
final document summarize data and that it clearly connect to impacts
analysis of the proposed action. EPA also requested information on
bycatch and the effects of other fisheries on sharks.
Final EISs
ERP No. F-AFS-K26002-CA, South Tahoe Public Utility District
(STPUD) B-Line Phase III Wastewater Export Pipeline Replacement
Project, Luther Pass Pump Station to U.S. Forest Service Luther Pass
Overflow Campground Access Road, Special Use Permit, U.S. Army COE
Section 404 and U.S. Fish and Wildlife Service Permits Issuance and EPA
Grant, El Dorado and Alpine Counties, CA.
Summary: No formal comment letter was sent to the preparing agency.
ERP No. F-DOD-A11077-00, Ground-Based Midcourse Defense (GMD)
Extended Test Range (ETR) Project, Construction and Operation, CA, AK,
AS, HI and WA.
Summary: EPA expressed environmental concern regarding how soil
will be sampled for perchlorate and recommended that the ROD specify a
perchlorate sampling plan.
ERP No. F-FHW-J40157-MT, US 89 from Fairfield to Dupuyer Corridors
Study, Reconstruction, Widening,
[[Page 63085]]
Realignment and Route Connection between Yellowstone National Park to
the South with Glacier National Park to the North, Teton and Pondera
Counties, MT.
Summary: EPA expressed environmental concerns due to impacts to
wetlands and floodplain encroachment. EPA requested a wetland
mitigation plan be developed and that the project be designed to
adequately pass flood flows, bedload, and provide opportunities for
wildlife passage. EPA also suggested that the Montana Department of
Environmental Quality be coordinated with to assure compatibility of
proposed highway construction activities with TMDL development for
impaired waters.
ERP No. F-NPS-F65031-MN, Grand Portage National Monument General
Management Plan, Implementation, Cook County, MN.
Summary: EPA's previous concerns have been resolved; therefore, EPA
has no objections to the proposed action. EPA did request that future
environmental assessments on trails be made available for review.
Dated: November 4, 2003.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 03-28106 Filed 11-6-03; 8:45 am]
BILLING CODE 6560-50-P