[Federal Register: March 14, 2003 (Volume 68, Number 50)]
[Notices]               
[Page 12348-12349]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr14mr03-34]                         

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6338-4]

 
Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information, (202) 564-7167 or http://www.epa.gov/compliance/nepa/

Information, (202) 564-7167 or http://www.epa.gov/compliance/nepa/


Weekly receipt of Environmental Impact Statements filed March 3, 2003, 
through March 7, 2003, pursuant to 40 CFR 1506.9.
EIS No. 030088, Final EIS, NPS, AZ, Tonto National Monument, General 
Management Plan, New Administrative Facility Construction within the 
Monument Boundaries, Implementation, AZ, Wait Period Ends: April 14, 
2003, Contact: Lee Baiza (928) 467-2241. This document is available on 
the Internet at: http://planning.nps.gov/plans.cfm.
EIS
 No. 030089, Final EIS, COE, TX, North Padre Island Storm Damage 

Reduction and Environmental Restoration Project, Construction of a 
Channel between the Laquna Madre and the Gulf of Mexico across North 
Padre Island referred to as Packery Channel Project, Nueces County, IL, 
Wait Period Ends: April 14, 2003, Contact: Carolyn Murphy (409) 766-
3044.
EIS No. 030090, Final EIS, AFS, AZ, Flagstaff/Lake Mary Ecosystem 
Analyses Area, Amendment to the Coconino Forest Plan, Implementation, 
Coconino National Forest, Peaks and Mormon Lake Ranger Districts, 
Coconino County, AZ, Wait Period Ends: April 14, 2003, Contact: Debbie 
Kill (928) 526-0866. This document is available on the Internet at: 
http://www.fs.fed.us/r3/coconino/nepa.
EIS
 No. 030091, Draft EIS, AFS, CA, Silver Pearl Land Exchange Project, 

Proposal to Exchange 2,153 Acres of National Forest System (NFS) Land 
for up to 3,963 Acres of Sierra Pacific Industries Land (SPI) Land, 
within the boundary of Eldorado National Forest, Eldorado and Placer 
County, CA, Comment Period Ends: April 28, 2003, Contact: Elaine Gee 
(530) 333-5568.
EIS No. 030092, Draft EIS, COE, FL, Miami Harbor Navigation 
Improvements Project, To Study the Feasibility of Widening and 
Deepening Portions of the Port, Miami-Dade County, FL, Comment Period 
Ends: May 4, 2003, Contact: Terri Jordan (904) 232-1817.
EIS No. 030093, Draft EIS, BLM, CO, Gunnison Gorge National

[[Page 12349]]

Conservation Area Resource Management Plan, Implementation, Montrose 
and Delta Counties, CO, Comment Period Ends: June 16, 2003, Contact: 
Bill Bottomly (970) 240-5337. This document is available on the 
Internet at: http://www.gunnison-gorge-eis.com.
EIS
 No. 030094, Draft EIS, EPA, AK, Pogo Gold Mine Project, Construct 

and Operate an Underground Mine, NPDES and U.S. Army COE Section 404 
Permits, Goodpaster River Valley, Delta Junction, AK, Comment Period 
Ends: May 13, 2003, Contact: Hanh Gold (206) 553-0171. This document is 
available on the Internet at: http://www.pogomineeis.com.
EIS
 No. 030095, Draft EIS, FRC, CA, El Dorado Hydroelectric Project, 

Application for a New License, South Fork of the American River Basin, 
and Truckee River Basin, (FERC NO. 184-065) (FERC NO. 184-065), EL 
Dorada National Forest, Lake Tahoe Basin Management Unit, Alpine, 
Amador and EL Dorada Counties, CA, Comment Period Ends: April 28, 2003, 
Contact: Susan O'Brien (202) 502-8449.
EIS No. 030096, Draft EIS, BLM, NV, Black Rock Desert--High Rock Canyon 
Emigrant Trails National Conservation Area (NCA) and Associated 
Wilderness, and Other Contiguous Lands, Resource Management Plan, 
Implementation, Great Basin, NV, Comment Period Ends: June 16, 2003, 
Contact: Ester Hutchison (775) 623-1523. This document is available on 
the Internet at: http://www.BlackRockHighRock.org.

the Internet at: http://www.BlackRockHighRock.org.


Amended Notices

EIS No. 030080, Draft EIS, AFS, SC, Sumter National Forest Revised Land 
and Resource Management Plan, Implementation, Oconee, Chester, 
Fairfield, Laurens, Newberry, Union-Abbeville, Edgefield, Greenwood, 
McCormick and Saluda Counties, SC, Comment Period Ends: June 21, 2003, 
Contact: Jerome Thomas (803) 561-4000. Revision of FR Notice Published 
on 3/7/2003: Correction to Comment Period from 4/21/2003 to 6/21/2003.

    Dated: March 11, 2003.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 03-6195 Filed 3-13-03; 8:45 am]

BILLING CODE 6560-50-P