[Federal Register: March 20, 2003 (Volume 68, Number 54)]
[Notices]
[Page 13698-13699]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr20mr03-55]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EG03-43-000, et al.]
Bowie Power Station, et al.; Electric Rate and Corporate Filings
March 13, 2003.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. Bowie Power Station, LLC
[Docket No. EG03-43-000]
Take notice that on March 7, 2003, Bowie Power Station, LLC
(Bowie), a Delaware limited liability company with its principal place
of business at 4350 East Camelback Road, Suite B-150, Phoenix, Arizona,
85018, filed with the Federal Energy Regulatory Commission (Commission)
an application for determination of exempt wholesale generator status
pursuant to part 365 of the Commission's regulations. Bowie describes
the application as an amendment of its application filed in Docket No.
EG03-39-000.
Bowie states that it owns and, following completion of
construction, will operate a nominal 1000 MW power generation facility
located in Cochise County, Arizona (the Facility). Electric energy
produced from the Facility will be sold by Bowie to the wholesale power
market.
Comment Date: April 3, 2003.
2. California Power Exchange Corporation
[Docket No. ER02-2234-008]
Take notice that on March 10, 2003, the California Power Exchange
Corporation made a filing to comply with the Commission's February 25,
2003, Order in this proceeding (102 FERC [para] 61,208).
Comment Date: March 31, 2003.
3. Allegheny Power
[Docket No. ER03-309-002]
Take notice that on March 10, 2003, Allegheny Power (Allegheny)
filed revised sheets to the unexecuted Interconnection and Operating
Agreement (Agreement) with Duke Energy Fayette, LLC (Duke) filed with
the Federal Energy Regulatory Commission (Commission) on December 19,
2002. The purpose of this filing is to comply with the Commission's
``Order Conditionally Accepting Interconnection Service Agreement and
Interconnection and Operating Agreement and Rejecting Amendment To
Interconnection Agreement'' issued in the above-referenced proceedings
on February 7, 2003 (Order), 102 FERC [para] 61,161.
Allegheny Power states that copies of the filing were served on
Duke, the interested state commissions and on all parties listed on the
official service list to this proceeding.
Comment Date: March 31, 2003.
4. Southern California Edison Company
[Docket Nos. ER03-338-001]
Take notice that on March 10, 2003, Southern California Edison
Company (SCE) tendered for filing a revised rate sheet for its
Transmission Owner Tariff, FERC Electric Tariff, Second Revised Volume
No. 6. The purpose of this filing is to comply with the Commission's
February 21, 2003, Order in Docket No. ER03-338-000.
SCE state that copies of this filing were served on the parties
listed on the Service List in Docket No. Er03-338-000.
Comment Date: March 31, 2003.
5. ManChief Power Company, L.L.C.
[Docket No. ER03-438-001]
Take notice that on March 10, 2003, ManChief Power Company, L.L.C.
(ManChief Power) filed amendments to its market-based rate authority
proposal.
[[Page 13699]]
ManChief Power states that it is the owner of a generating plant
located near Brush, Colorado that sells its output to Public Service
Company of Colorado under a negotiated long-term power purchase
agreement. The tariff had been shared by ManChief Power with Fulton
Cogeneration Associates, L.P. with whom ManChief Power previously was,
but is no longer, affiliated.
Comment Date: March 31, 2003.
6. New York State Electric & Gas Corporation
[Docket No. ER03-603-000]
Take notice that on March 10, 2003, New York State Electric & Gas
Corporation (NYSEG) tendered for filing revisions to its revised retail
tariff leaves for retail transmission service relating to NYSEG's
Retail Access Program and Economic Development Power service. NYSEG's
tariff sheets for electric retail access were filed previously in
Docket No. ER00-316-000.
NYSEG states that copies of the filing have been served on the
parties listed on the Service List for ER00-316-000. The New York State
Public Service Commission, New York Power Authority (NYPA) and NYPA
Economic Development Power customers have also been served with copies
of the filing.
Comment Date: March 31, 2003.
Standard Paragraph
Any person desiring to intervene or to protest this filing should
file with the Federal Energy Regulatory Commission, 888 First Street,
NE., Washington, DC 20426, in accordance with rules 211 and 214 of the
Commission's rules of practice and procedure (18 CFR 385.211 and
385.214). Protests will be considered by the Commission in determining
the appropriate action to be taken, but will not serve to make
protestants parties to the proceeding. Any person wishing to become a
party must file a motion to intervene. All such motions or protests
should be filed on or before the comment date, and, to the extent
applicable, must be served on the applicant and on any other person
designated on the official service list. This filing is available for
review at the Commission or may be viewed on the Commission's Web site
at http://www.ferc.gov, using the ``FERRIS'' link. Enter the docket
at http://www.ferc.gov, using the ``FERRIS'' link. Enter the docket
number excluding the last three digits in the docket number filed to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at (866)208-3676, or for TTY,
contact (202)502-8659. Protests and interventions may be filed
electronically via the Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. The Commission strongly encourages
electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. 03-6724 Filed 3-19-03; 8:45 am]
BILLING CODE 6717-01-P