[Federal Register: October 9, 2003 (Volume 68, Number 196)]
[Notices]
[Page 58332]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr09oc03-80]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Draft License Application and Preliminary Draft
Environmental Assessment and Request for Preliminary Terms and
Conditions
October 2, 2003.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: P-2150-026.
c. Date Filed: October 1, 2003.
d. Applicant: Puget Sound Energy, Inc.
e. Name of Project: Baker River Hydroelectric Project.
f. Location: On the Baker River, near the Town of Concrete, in
Whatcom and Skagit Counties, Washington. The project occupies about
5,168.5 acres of lands within the Mt. Baker-Snoqualmie National Forest
managed by the U.S. Forest Service.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Connie Freeland, Puget Sound Energy, Inc.
P.O. Box 97034 PSE-09S Bellevue, WA 98009-9734; (425) 462-3556 or connie.freeland@pse.com.
i. FERC Contact: Steve Hocking, Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426; (202) 502-8753 or steve.hocking@ferc.gov.
j. Status of Project: With this notice the Commission is soliciting
(1) preliminary terms, conditions, and recommendations on the
Preliminary Draft Environmental Assessment (PDEA), and (2) comments on
the Draft License Application.
k. Deadline for filing: January 2, 2004.
All comments on the PDEA and Draft License Application should be
sent to the addresses noted above in Item (h), with one copy filed with
FERC at the following address: Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426. All comments must include the project name and number and bear
the heading Preliminary Comments, Preliminary Recommendations,
Preliminary Terms and Conditions, or Preliminary Prescriptions.
Comments and preliminary recommendations, terms and conditions, and
prescriptions may be filed electronically via the Internet in lieu of
paper. The Commission strongly encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (http://www.ferc.gov) under the ``e-Filing'' link.
l. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at http://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659.
You may also register online at http://www.ferc.gov/esubscribenow.htm
to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Puget Sound Energy, Inc. has mailed copies of the PDEA and Draft
License Application to interested entities and parties. Additional
copies may be obtained from the contact person listed in item (h)
above.
m. With this notice, we are initiating consultation with the
Washington State Historic Preservation Officer as required by Section
106 of National Historic Preservation Act and the regulations of the
Advisory Council on Historic Preservation, 36 CFR 800.4.
Magalie R. Salas,
Secretary.
[FR Doc. E3-00009 Filed 10-8-03; 8:45 am]
BILLING CODE 6717-01-P