IDACORP Energy L.P., et al.; Electric Rate and Corporate Filings
September 15, 2003.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. IDACORP Energy L.P. and Sempra Energy Trading Corp
[Docket No. EC03-127-001]
Take notice that on September 8, 2003, IDACORP Energy L.P. and
Sempra Energy Trading Corp., pursuant to Section 203 of the Federal
Power Act submitted a supplement to Exhibit G of the Application filed
on August 20, 2003 in Docket No. EC03-127-000.
Comment Date: September 22, 2003.
2. Caledonia Generating, LLC; PurEnergy Caledonia LLC
[Docket No. EC03-134-000]
Take notice that on September 4, 2003, Caledonia Generating, LLC
(Caledonia) filed an application under Section 203 of the Federal Power
Act requesting Commission authorization for the transfer of all
jurisdictional facilities related to Caledonia's 813 MW gas-fired
electric generating station located near the Town of Caledonia,
Mississippi, to PurEnergy Caledonia LLC (PurEnergy Caledonia), in
connection with the transfer of Caledonia's generating facility to a
passive non-operating owner/lessor. Caledonia has requested privileged
treatment of the contents of Exhibit I to the Section 203 application.
In addition, PurEnergy Caledonia filed a notice of succession with
respect to Caledonia's market-based rate tariff.
Comment Date: September 25, 2003.
3. Ameren Services Company
[Docket No. ER02-2237-002]
Take notice that on September 8, 2003, Ameren Services Company
(Ameren) pursuant to the Commission's Letter Order dated August 8,
2003, submitted a compliance filing correcting the designation for the
Network Operating Agreement which should read ``Ameren Operating
Companies FERC Electric Tariff Second Revised Volume No. 1, Second
Substitute Service Agreement No. 512, Docket Nos. ER02-2237-000 and
001.''
Comment Date: September 29, 2003.
4. Southwest Power Pool, Inc.
[Docket No. ER03-978-001]
Take notice that on September 8, 2003, Southwest Power Pool, Inc.
(SPP) submitted a revised Interconnection and Operating Agreement
(Revised IA) between SPP, Blue Canyon Windpower, LLC (Blue Canyon) and
Western Farmers Electric Cooperative (WFEC) in compliance with the
Commission's July 23, 2003 Order in Docket No. ER03-978-000. SPP states
that copies of this filing were served on Blue Canyon, WFEC and on all
parties on the official service list in this docket.
Comment Date: September 30, 2003.
5. Pacific Gas and Electric Company
[Docket No. ER03-1091-001]
Take notice that on September 8, 2003, Pacific Gas and Electric
Company (PG&E) tendered for filing a Notice of Termination of the
Generator Special Facilities Agreement with Duke Energy Morro Bay LLC.
PG&E has also requested certain waivers.
PG&E states that copies of this filing have been served upon
Wellhead Panoche, Wellhead Gates, CalPeak Vaca Dixon, High Winds,
Hanover, Duke Morro Bay, the California Independent System Operator
Corporation and the CPUC.
Comment Date: September 29, 2003.
6. Pacific Gas and Electric Company
[Docket No. ER03-1115-000]
Take notice that on September 8, 2003, Pacific Gas and Electric
Company (PG&E) withdrew its Request for Deferral of Consideration of
its July 25, 2003, filing in Docket No. ER03-1115-000 of a revised
Generator Special Facilities and Generator Interconnection Agreements
between PG&E and Elk Hills Power, LLC (Elk Hills) (collectively,
Parties).
PG&E states that copies of this filing have been served upon the
California Public Utilities Commission and all parties designated on
the official service list in this proceeding.
Comment Date: September 29, 2003.
7. Central Hudson Gas & Electric Corporation
[Docket Nos. ER03-1297-000, ER03-1298-000,ER03-1299-000, and ER03-1300-
000]
Take notice that on September 9, 2003, Central Hudson Gas &
Electric Corporation (Central Hudson) submitted Notices of Cancellation
for its Rate Schedule FERC Nos. 57, 58, 59 and 60. Central Hudson
states that the notices did not reflect the correct pagination pursuant
to the requirements of the Commission's Order No. 614, and therefore
Central Hudson is submitting substituted notices for those originally
filed on September 3, 2003.
Comment Date: September 30, 2003.
8. Palama, LLC
[Docket No. ER03-1306-000]
Take notice that on September 8, 2003, Palama, LLC (Palama)
petitioned the Commission for acceptance of Palama Rate Schedule FERC
No. 1; the granting of certain blanket approvals, including the
authority to sell electricity at market-based rates; and the waiver of
certain Commission regulations.
Palama states that it intends to engage in wholesale electric power
and energy
[[Page 61406]]
purchases and sales as a marketer. Palama notes that it is not in the
business of generating or transmitting electric power.
Comment Date: September 30, 2003.
9. PacifiCorp
[Docket No. ER03-1308-000]
Take notice that on September 8, 2003, PacifiCorp, tendered for
filing in accordance with 18 CFR 35 of the Commission's Rules and
Regulations a Notice of Cancellation of PacifiCorp's Rate Schedule No.
424 with Black Hills Corporation effective March 31, 2002.
PacificCorp states that copies of this filing were supplied to
Black Hills Corporation and the Public Utility Commission of Oregon.
Comment Date: September 29, 2003.
10. Arizona Public Service Company
[Docket No. ER03-1309-000]
Take notice that on September 8, 2003, Arizona Public Service
Company (APS) tendered for filing a Notice of Cancellation of the
Edison-Arizona Interruptible Transmission Service Agreement, between
APS and Southern California Edison Company (SCE), in accordance with
Commission's regulations 18 CFR 35.11. APS is requesting an effective
date of November 1, 2003.
Comment Date: September 29, 2003.
11. Arizona Public Service Company
[Docket No. ER03-1310-000]
Take notice that on September 8, 2003, Arizona Public Service
Company (APS) tendered for filing a Notice of Cancellation of the
Wholesale Power Agreement between APS and Southern California Edison
Company (SCE), in accordance with Commission regulations 18 CFR 35.11.
APS is requesting an effective date of December 31, 2003.
Comment Date: September 29, 2003.
12. Chesapeake Transmission, LLC
[Docket No. ER03-1311-000]
Take notice that on September 8, 2003, Chesapeake Transmission, LLC
(CTL) submitted for filing, pursuant to Section 205 of the Federal
Power Act, a petition requesting that the Commission: (1) Grant CTL
blanket authority to make sales of transmission rights at negotiated
rates; and (2) grant certain waivers, in connection with its proposed
Chesapeake Transmission Line project.
Comment Date: September 29, 2003.
13. Midwest Independent Transmission System Operator, Inc.
[Docket No. ER03-1312-000]
Take notice that on September 8, 2003, the Midwest Independent
Transmission System Operator, Inc. (Midwest ISO) submitted for filing
Schedule 20--Station Power of its Open Access Transmission Tariff, FERC
Electric Tariff, Second Revised Volume No. 1, in order to provide
clarification of the Station Power process and procedures as it applied
to Generators.
The Midwest ISO has requested waiver of the notice provision of
Section 205 of the Federal Power Act in order to accommodate an
effective date of October 8, 2003.
The Midwest ISO has also requested waiver of the service
requirements set forth in 18 CFR 385.2010. The Midwest ISO states it
has electronically served a copy of this filing, with attachments, upon
all Midwest ISO Members, Member representatives of Transmission Owners
and Non-Transmission Owners, the Midwest ISO Advisory Committee
participants, as well as all state commissions within the region. In
addition, the filing has been electronically posted on the Midwest
ISO's Web site at http://www.midwestiso.org under the heading ``Filings to
FERC'' for other interested parties in this matter. The Midwest ISO
states it will provide hard copies to any interested parties upon
request.
Comment Date: September 29, 2003.
14. Geothermal Properties, Inc.
[Docket No. ER03-1314-000]
Take notice that on September 9, 2003, Geothermal Properties, Inc.
tendered for filing a Notice of Cancellation of its market-based rate
authority under FERC Electric Tariff, Original Volume No. 1, effective
date February 15, 2001 in Docket No. ER01-869-000. Geothermal
Properties, Inc. states that the cancellation should take effect
September 30, 2003, and that it has not entered into any power sales or
power purchase agreements or transactions pursuant to the tariff.
Comment Date: September 30, 2003.
15. MS Retail Development Corp.
[Docket No. ER03-1315-000]
Take notice that on September 9, 2003, MS Retail Development Corp.
(MS Retail) petitioned the Commission for acceptance of MS Retail's
Rate Schedule FERC No. 1; the granting of certain blanket approvals,
including the authority to sell electricity at market-based rates; and
the waiver of certain Commission regulations.
MS Retail states that it is a corporation formed under the laws of
Delaware and its principal place of business is New York, New York. MS
Retail notes that in transactions where it sells electric power it
proposes to make such sales on rates, terms, and conditions to be
mutually agreed to with the purchasing party.
Comment Date: September 30, 2003.
16. Sunrise Power Company
[Docket No. ER03-1317-000]
Take notice that on September 8, 2003, Sunrise Power Company, LLC,
filed a Joint Interconnection Facilities Agreement between Sunrise and
La Paloma Generating Company, LLC pursuant to Section 205 of the
Federal Power Act.
Comment Date: September 29, 2003.
17. e prime, inc.
[Docket No. ER03-1319-000]
Take notice that on September 9, 2003, e prime, inc. filed a notice
with the Commission seeking cancellation of its market-based rate
authority effective September 1, 2003 pursuant to Section 35.15(c) of
the Commission regulations.
Comment Date: September 30, 2003.
18. Commonwealth Edison Company
[Docket No. ER03-1320-000]
Take notice that on September 9, 2003, Commonwealth Edison Company
(ComEd) submitted for filing an interconnection agreement by and
between ComEd and Mendota Hills, LLC (Mendota Hills), designated as
Service Agreement No. 728 under ComEd's open access transmission
service tariff, ComEd FERC Electric Tariff, Second Revised Volume No.
5, to be effective on November 9, 2003.
Comment Date: September 30, 2003.
19. Southwestern Public Service Company
[Docket No. ER03-1321-000]
Take notice that on September 8, 2003, Xcel Energy Services Inc.,
on behalf of Southwestern Public Service Company (SPS), filed revisions
to SPS's Rate Schedule FERC No. 118 and notice of cancellation of
certain obsolete supplements to SPS's Rate Schedule FERC No. 118.
Comment Date: September 29, 2003.
20. Bethlehem Steel Corporation
[Docket No. ER03-1322-000]
Take notice that on September 8, 2003, Bethlehem Steel Corporation
(Bethlehem) pursuant to Commission's regulations 18 CFR 35.15 and
131.53, submitted for filing a Notice of Cancellation of FERC Electric
Tariff No. 1 and Rate Schedule FERC No. 2.
[[Page 61407]]
Comment Date: September 29, 2003.
Standard Paragraph
Any person desiring to intervene or to protest this filing should
file with the Federal Energy Regulatory Commission, 888 First Street,
NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214). Protests will be considered by the Commission in determining
the appropriate action to be taken, but will not serve to make
protestants parties to the proceeding. Any person wishing to become a
party must file a motion to intervene. All such motions or protests
should be filed on or before the comment date, and, to the extent
applicable, must be served on the applicant and on any other person
designated on the official service list. This filing is available for
review at the Commission or may be viewed on the Commission's Web site
at http://www.ferc.gov, using the ``FERRIS'' link. Enter the docket
number excluding the last three digits in the docket number filed to
access the document. For assistance, call (202) 502-8222 or TTY, (202)
502-8659. Protests and interventions may be filed electronically via
the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's Web site under the ``e-Filing'' link.
The Commission strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E3-00126 Filed 10-27-03; 8:45 am]