DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Ready for Environmental Analysis and
Soliciting Comments, Recommendations, Terms and Conditions, and
Prescriptions
November 7, 2003.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 178-017.
c. Date filed: April 14, 2003.
d. Applicant: Pacific Gas and Electric Company.
e. Name of Project: Kern Canyon Hydroelectric Project.
f. Location: On the Kern River, near the Town of Bakersfield, Kern
County, California. The project occupies approximately 11.26 acres of
public land located within the Sequoia National Forest.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)--825(r).
h. Applicant Contact: Mr. Randal S. Livingston, Pacific Gas and
Electric Company, Power Generation, Mail Code N11E, P.O. Box 770000,
San Francisco, CA 94177 (415) 973-7000.
i. FERC Contact: Allison Arnold, (202) 502-6346 or allison.arnold@ferc.gov.
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance of this
notice.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Comments, recommendations, terms and conditions, and prescriptions
may be filed electronically via the Internet in lieu of paper. The
Commission strongly encourages electronic filings. See, 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
(http://www.ferc.gov) under the ``e-Filing'' link.
k. This application has been accepted for filing and is now ready
for environmental analysis.
l. The Kern Canyon Hydroelectric Project consists of: (1) An
existing 150-foot-long and 23-foot-high dam; (2) an existing 3-acre
reservoir having a usable capacity of 27-acre-feet; (3) a 1.58-mile-
long horseshoe shaped tunnel; (4) a 520-foot-long steel penstock
varying in diameter from 96 inches to 90 inches; (5) a powerhouse
containing one generating unit with an installed capacity of 9,540
kilowatts; (6) existing transmission facilities; and (7) appurtenant
facilities. The project is estimated to generate an average of 67.6
gigawatthours annually. The dam and existing project facilities are
owned by the applicant.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at http://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp
to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Public notice of the filing of the initial development
application, which has already been given, established the due date for
filing competing applications or notices of intent. Under the
Commission's regulations, any competing development application must be
filed in response to and in compliance with public notice of the
initial development application. No competing applications or notices
of intent may be filed in response to this notice.
The Commission directs, pursuant to Sec. 4.34(b) of the
Regulations (see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20,
1991) that all comments, recommendations, terms and conditions and
prescriptions concerning the application be filed with the Commission
within 60 days from the issuance date of this notice. All reply
comments must be filed with the Commission within 105 days from the
date of this notice.
All filings must (1) bear in all capital letters the title
``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Each filing must be
accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding, in
[[Page 64888]]
accordance with 18 CFR 4.34(b), and 385.2010.
Magalie R. Salas,
Secretary.