[Federal Register: December 18, 2003 (Volume 68, Number 243)]
[Notices]
[Page 70500-70501]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr18de03-39]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EC04-35-000, et al.]
Madison Gas and Electric Company, et al.; Electric Rate and
Corporate Filings
December 10, 2003.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1.Madison Gas and Electric Company; MGE Energy, Inc.; MGE Power LLC;
MGE Power West Campus LLC
[Docket Nos. EC04-35-000 and EL04-32-000]
Take notice that on December 5, 2003, Madison Gas and Electric
Company, MGE Energy, Inc., MGE Power LLC and MGE Power West Campus
filed an Application for Approval of the Disposition of Jurisdictional
Facilities under section 203 of the Federal Power Act, 16 U.S.C. 824b
(2000), and Petition for Declaratory Order. MGE Power West Campus, a
non-utility subsidiary of MGE Energy and MGE Power, states that it will
develop, construct and own generating assets and associated
interconnection facilities and lease those facilities under a long-term
lease to its corporate affiliate, MGE.
Comment Date: December 29, 2003.
2.Duquesne Power, L.P.
[Docket No. EG04-21-000]
Take notice that on December 8, 2003, Duquesne Power, L.P.,
(applicant) filed with the Federal Energy Regulatory Commission an
application for determination of exempt wholesale generator status
pursuant to part 365 of the Commission's regulations. The applicant is
a limited partnership that will engage directly or indirectly and
exclusively in the business of owning and/or operating eligible
facilities in the United States and selling electric energy at
wholesale. The applicant states that it proposes to own and operate an
approximately 436 megawatt four-unit coal-fired generating station
located in Shamokin Dam, Pennsylvania. The applicant states that it is
seeking a determination of its exempt wholesale generator status and
all electric energy sold by the applicant will be sold exclusively at
wholesale.
Comment Date: December 29, 2003.
Standard Paragraph
Any person desiring to intervene or to protest this filing should
file with the Federal Energy Regulatory Commission, 888 First Street,
NE., Washington, DC 20426, in accordance with rules 211 and 214 of the
Commission's rules of practice and procedure (18 CFR 385.211 and
385.214). Protests will be considered by the Commission in determining
the appropriate action to be taken, but will not serve to make
protestants parties to the proceeding. Any person wishing to become a
party must file a motion to intervene. All such motions or protests
should be filed on or before the comment date, and, to the
[[Page 70501]]
extent applicable, must be served on the applicant and on any other
person designated on the official service list. This filing is
available for review at the Commission or may be viewed on the
Commission's Web site at http://www.ferc.gov, using the ``FERRIS''
link. Enter the docket number excluding the last three digits in the
docket number filed to access the document. For assistance, call (202)
502-8222 or TTY, (202) 502-8659. Protests and interventions may be
filed electronically via the Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. The Commission strongly encourages
electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E3-00589 Filed 12-17-03; 8:45 am]
BILLING CODE 6717-01-P