[Federal Register: August 27, 2004 (Volume 69, Number 166)]
[Notices]               
[Page 52668-52669]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr27au04-34]                         

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6655-1]

 
Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or http://www.epa.gov.compliance/nepa/.


Weekly receipt of Environmental Impact Statements Filed August 16, 2004 
Through August 20, 2004 Pursuant to 40 CFR 1506.9.

EIS No. 040394, Draft EIS, AFS, ID, Red Pines Project, Proposes to 
Implement Fuel Reduction Activities and Improve the Range of Watershed 
Activities, Nez Perce National Forest, Red River Ranger District, Idaho 
County, ID, Comment Period Ends: October 12, 2004, Contact: Ester 
Hutchison (209) 983-1950.
EIS No. 040395, Draft Supplement, TPT, CA, Presidio Trust Public Health 
Service Hospital (PUSH or Building 1801) at the Presidio of San 
Francisco (Area B) of Presidio Trust Management Plan, To Rehabilitate 
and Reuse Buildings, Gold Gate National Recreation Area, San Francisco 
Bay, Marin County, CA, Comment Period Ends: October 12, 2004, Contact: 
John Pelka (415) 561-5300. This document is available on the Internet 
at: http//http://www.presidio.gov.

EIS No. 040396, Draft EIS, FRA, CA, Los Angeles--To--San Diego (LOSSAN) 
Rail Corridor, Proposed Rail Corridor Improvement Studies to Increase 
Intercity Travel for Faster, Safer and Reliable Passenger Rail System, 
Los Angeles, Orange and San Diego Counties, CA, Comment Period Ends: 
October 27, 2004, Contact: David Valenstein (202) 493-6368.
EIS No. 040397, DRAFT EIS, SFW, CA, Bair Island Restoration and 
Management Plan, Restore Tidal Action to 1,400 Acres of Former Salt 
Ponds, Don Edwards San Francisco Bay National Wildlife Refuge, Bair 
Island State Ecological Reserve, South San Francisco Bay, San Mateo 
County, CA, Comment Period Ends: October 12, 2004, Contact: Clyde 
Morris (510) 792-0222.
EIS No. 040398, Final Supplement, EPA, MS, FL, AL, Eastern Gulf of 
Mexico Offshore Oil and Gas Extraction, Updated Information on Issuance 
of New National Pollutant Discharge Elimination System General Permit 
and the Ocean Discharge Criteria Evaluation, MS, AL and FL, Wait Period 
Ends: September 7, 2004, Contact: Lena Scott (404) 562-9607.
EIS No. 040399, Draft EIS, AFS, OR, ID, WA, CA, Pacific Northwest 
Region Invasive Plant Program, Preventing and Managing Invasive Plants, 
Implementation, OR, WA, Including Portions of Del Norte and Siskiyou 
Counties, CA and Portions of Nez Perce, Salmon, Idaho and Adam 
Counties, ID,Comment Period Ends: November 24, 2004, Contact: Eugene 
Skrine (503) 808-2685.
EIS No. 040400, Final EIS, DOE, WA, BP Cherry Point Cogeneration 
Project, To Build a 720-megawatt Gas-Fired Combined Cycle Cogeneration 
Facility, Energy Facility Site Evaluation Council (EFSEC), Whatcom 
County, WA, Wait Period Ends: September 7, 2004, Contact: Thomas E. 
McKinney (503) 230-4749. This document is available on the Internet at: 
http://www.efsec.wa.gov.

EIS No. 040401, Final EIS, EPA, FL, Palm Beach Harbor Ocean Dredged 
Material Disposal Site and the Port Everglades Harbor Ocean Dredged 
Material Disposal Site, Designation, FL, Wait Period Ends: September 7, 
2004, Contact: Christopher McArthur (404) 562-9391. This document is 
available on the Internet at: http://www.epa.gov/region4/water/oceans/proposed_sites.htm
.

EIS No. 040402, Revised Draft EIS, IBR, CA, NV, Truckee River Operating 
Agreement (TROA) Modify Operations of Five Federal and Two Non-Federal 
Reservoirs to Facilitate Distribution of Water, Truckee River Basin, EL 
Dorado, Nevada, Placer and Sierra Counties, CA and Douglas, Lyon, 
Storey and Washoe Counties, NV, Comment Period Ends: October 29, 2004, 
Contact: Kenneth Parr (775) 882-3436.
EIS No. 040403, Final Supplemental, NOA, FL, MS, TX, AL, LA, Reef Fish 
Fishery Management Plan Amendment 22, To Set Red Snapper Sustainable 
Fisheries Act Targets and Thresholds, Set a Rebuilding Plan, and 
Establish Bycatch Reporting Methodologies for the Reef Fish Fishery, 
Gulf of Mexico, Wait Period Ends: September 7, 2004, Contact: Roy E. 
Crabtree (727) 570-5305. This document is available on the Internet at: 
http://www.gulfcouncil.org.

EIS No. 040404, Draft EIS, NOA, WA, CA, OR, 2005-2006 Pacific Coast 
Groundfish Fishery, Proposed Acceptable Biological Catch and Optimum 
Yield Specifications and Management Measures, WA, OR and CA, Comment 
Period Ends: October 12, 2004, Contact: D. Robert Lohn (206) 526-6150. 
This document is available on the Internet at: http://www.pcouncil.org.

EIS No. 040405, Draft EIS, NOA, HI, Seabird Interaction Mitigation 
Methods, To Reduce Interaction with Seabird in Hawaii-Based Longline 
Fishery and Pelagic Squid Fishery Management, To Establish an Effective 
Management Framework for Pelagic Squid Fisheries, Fishery Management 
Plan, Pelagic Fisheries of the Western Pacific Region, Exclusive 
Economic Zone of the U.S. and High Sea, Comment Period Ends: October 
12, 2004, Contact: Tom Graham (808) 973-2937.

Amended Notices

EIS No. 040276, Final EIS, FAA, MN, Flying Cloud Airport Expansion, 
Extensions of the Runway 10R/28L and 10L/28R, Long-Term Comprehensive 
Development, In the City of Eden Prairie, MN, Wait Period

[[Page 52669]]

Ends: September 1, 2004, Contact: Glen Orcult (612) 713-4354. Revision 
of FR Notice Published on 6/18/04: CEQ Comment Period Ending 8/17/2004 
has been Extended to 9/1/2004.

    Dated: August 27, 2004.
Robert W. Hargrove,
Division Director, NEPA Compliance Division, Office of Federal 
Activities.
[FR Doc. 04-19618 Filed 8-26-04; 8:45 am]

BILLING CODE 6560-50-P