[Federal Register: January 30, 2004 (Volume 69, Number 20)]
[Notices]
[Page 4513]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr30ja04-57]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6647-9]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under Section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at (202) 564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in the Federal Register dated April 4, 2003 (68 FR 16511).
Draft EISs
ERP No. DNRS-L31004-ID Rating LO, Little Wood River Irrigation
District, Gravity Pressurized Delivery System Construction, Funding and
U.S. Army COE Section 404 Permit, Townships of 1 North, 1 South and 2
South of Range 21 East of the Boise Merridan, City of Carey, Blaine
County, ID.
Summary: EPA recommended that wetland mitigation plans include
descriptions of potential off-site mitigation areas, assurances that
appropriate hydrology exists and that monies slated for mitigation be
bonded until it is demonstrated that wetlands values and function have
been adequately replaced. EPA requested that the final EIS include
additional information on Environmental Justice analyses and Tribal
consultations.
Final EISs
ERP No. F-FHW-F40398-IN Indianapolis Northeast Corridor
Transportation Connections Study to Identify Actions to Reduce Expected
Year 2025 Traffic Congestion and Enhance Mobility, Between I-69: from
I-465 to IN-328; I-465: from U.S. 31 to I-70; I-70: from I-65 to I-465:
IN-37 from I-69 to Allisonville Road (Noblesville), Marion and Hamilton
Counties, IN.
Summary: EPA has no objections to the preferred alternative. EPA
does request that the Record of Decision provide clarification on
monitoring spawning fish and wetland mitigation.
ERP No. F-FHW-G40175-TX TX-45 Highway Southeast Study, I-35 south
at Farm-to-Market Road-1327 to TX-130/US 183, Local Regional
Enhancements to the National Transportation Systems, Funding and Right-
of-Way Permit Issuance, Travis County, TX.
Summary: EPA has no objections to the selection of the preferred
alternative.
ERP No. FS-NRC-E06014-SC Generic EIS--License Renewal of Nuclear
Plants, Supplement 13 regarding H.B. Robinsion Steam Electric Plant,
Unit No. 2, Operating License Renewal for 20-Years, Site Specific, on
the Shore of Lake Robinsion, Darlington and Chesterfield Counties, SC.
Summary: EPA expressed environmental concerns, and agreed with the
NRC's proposal to require radiological monitoring of all plant
effluents, and appropriate storage and disposition of radiological
waste.
Dated: January 27, 2004.
Ken Mittelholtz,
Environmental Specialist, Office of Federal Activities.
[FR Doc. 04-2009 Filed 1-29-04; 8:45 am]
BILLING CODE 6560-50-P