DEPARTMENT OF ENERGY

Energy Information Administration

 
Agency Information Collection Activities: Submission for OMB 
Review; Comment Request

AGENCY: Energy Information Administration (EIA), Department of Energy 
(DOE).

ACTION: Agency information collection activities: submission for OMB 
review; comment request.

-----------------------------------------------------------------------

SUMMARY: The EIA has submitted the Electric Power Program to the Office 
of Management and Budget (OMB) for review and a three-year extension 
under section 3507(h)(1) of the Paperwork Reduction Act of 1995 (Pub. 
L. 104-13) (44 U.S.C. 3501 et seq.).

DATES: Comments must be filed by October 12, 2004. If you anticipate 
that you will be submitting comments but find it difficult to do so 
within that period, you should contact the OMB Desk Officer for DOE 
listed below as soon as possible.

ADDRESSES: Send comments to OMB Desk Officer for DOE, Office of 
Information and Regulatory Affairs, Office of Management and Budget. To 
ensure receipt of the comments by the due date, submission by FAX (202-
395-7285) is recommended. The mailing address is 726 Jackson Place, 
NW., Washington, DC 20503. (A copy of your comments should also be 
provided to EIA's Statistics and Methods Group at the address below.)

FOR FURTHER INFORMATION CONTACT: Requests for additional information 
should be directed to Grace Sutherland. To ensure receipt of the 
comments by the due date, submission by FAX (202-287-1705) or e-mail 
grace.sutherland@eia.doe.gov) is recommended. The mailing address is 
Statistics and Methods Group (EI-70), Forrestal Building, U.S. 
Department of Energy, Washington, DC 20585-0670. Ms. Sutherland may be 
contacted by telephone at (202) 287-1712.

SUPPLEMENTARY INFORMATION: This section contains the following 
information about the energy information collection submitted to OMB 
for review: (1) The collection numbers and title; (2) the sponsor 
(i.e., the Department of Energy component); (3) the current OMB docket 
number (if applicable); (4) the type of request (i.e., new, revision, 
extension, or reinstatement); (5) response obligation (i.e., mandatory, 
voluntary, or required to obtain or retain benefits); (6) a description 
of the need for and proposed use of the information; (7) a

[[Page 54770]]

categorical description of the likely respondents; and (8) an estimate 
of the total annual reporting burden (i.e., the estimated number of 
likely respondents times the proposed frequency of response per year 
times the average hours per response).
    1. Forms EIA-411, 412, 423, 767, 826, 860, 860M, 861, 906, and 920, 
``Electric Power Program.''
    2. Energy Information Administration.
    3. OMB Number 1905-0129.
    4. Three-year extension.
    5. Mandatory (all forms except for EIA-411) and voluntary (EIA-
411).
    6. The Electric Power Surveys collect electric power information 
including capacity, generation, fuel consumption, fuel receipts, fuel 
stocks, and prices, along with financial information. Respondents 
include both regulated and unregulated entities that comprise the U.S. 
electric power industry. Electric power data collected are used by the 
Department of Energy for analysis and forecasting. Data are published 
in various EIA reports.
    Below are additional proposed changes to the electric power surveys 
that that have been made subsequent to the April 2, 2004 Federal 
Register notice (69 FR 17400) requesting public comments. The proposed 
changes resulted from EIA's consideration of public comments and 
internal reviews of the electric power surveys.
    Generic changes across forms:
    1. Replaced ``Regulated'' and ``Unregulated'' with ``Utility'' and 
``Non Utility,'' where appropriate.
    2. Standardized all ``Higher Heating Value'' tables across forms.
    3. Combined all glossaries into one that can be accessed online; 
replaced all glossaries in the individual forms with links to the 
online version.
    4. Revised burden estimates for all forms.
    The changes noted below are FORM changes only. Many instructional 
changes were made in all the forms for the following form changes, and, 
in some cases, to better clarify the meaning of various data element 
requests.

For Form EIA-411

    1. Modified: Schedule 2, CAPACITY FOR EXISTING GENERATORS IN 
REPORTING YEAR (was Schedule 3 in Federal Register version) by 
replacing lines 8, 9 and 10 with line 8. Basically lumped all of the 
derating categories into one category. Total operable capacity (line 
11) is now line 9.
    2. Modified: Schedule 3, HISTORICAL AND PROJECTED DEMAND AND 
CAPACITY (was Schedule 2 in Federal Register version) by adding lines 
7a, 7b1, 7b2, 7c, and 7d to provide additional derating categories at a 
higher level of aggregation than Schedule 2 would have been.
    3. Modified: Schedule 4, HISTORICAL AND PROJECTED CAPACITY 
PURCHASES/INCOMING TRANSFERS (MEGAWATTS) to include capacity incoming 
transfers, and to list Plant and Unit ID for each transfer/purchase.

For Form EIA-412

    1. Modified: Schedule 9, Parts A, B, & C, ELECTRIC GENERATING PLANT 
STATISTICS, to add ``Net Generation'' back into forms, keeping ``Gross 
Generation'' but instructing respondents to provide Gross Generation 
only if they are unable to provide Net Generation data.
    2. Also added ``Rents'' to Production Expenses portion of Schedule 
9, Parts B & C (Rents was already included in Part A) in order to pick 
up all expenses.
    3. Added a list of Prime Mover codes to instructions for Schedule 
9, Parts A, B & C, line 1, ``Kind of Plant.''

For Form EIA-767

    1. In SCHEDULE 4, BOILER INFORMATION, PART C. DESIGN PARAMETERS, 
deleted lines 18 through 21 on alternate fuel capabilities.
    2. In SCHEDULE 6, COOLING SYSTEM INFORMATION, PART B. DESIGN 
PARAMETERS, added line 22, datum for latitude and longitude.
    3. In SCHEDULE 9, STACK AND FLUE INFORMATION--DESIGN PARAMETERS, 
added line 18, datum for latitude and longitude.

For Form EIA-826

    1. Deleted SCHEDULE 1. RETAIL SALES TO ULTIMATE CUSTOMERS, PART E. 
ANY OTHER RETAIL ENERGY SERVICE PROVIDER THAT DOES NOT MEET THE 
REQUIREMENTS FOR SCHEDULES A THROUGH D.
    2. Deleted word ``Retail'' from Schedule 1, Parts A, B, C, & D.

For Form EIA-860

    1. Replaced data element from Schedule 3, Generator Information--
``Is this Generator Regulated?'' with ``Is Any Part of This Generator 
Owned by an Entity that is Not an Electric Utility?''
    2. Modified Schedule 3, Part B, Question 3--to read ``Maximum 
Reactive Output (Lagging MVAR) At Expected Peak Output.''
    3. Modified Schedule 3, Part B, Questions 8 to ``Is this generator 
associated with a Combined Heat and Power system (fuel input is used to 
produce both electricity and useful thermal output)?'' and Question 9 
to ``Is this a Distributed Generator?''
    4. Added question 10 b to Schedule 3, Part B--``Is this generator 
part of a Solid Fuel Gasification system?''
    5. Modified number of fuel options for co-firing reportable from 9 
to 6 (Q. 20, Sch. 3, Part B).
    6. Modified number of ``other energy sources'' from ten to four (Q. 
14, Part B; Q. 11, Part C; Q. 13, Part D).
    7. Deleted question on ability to co-fire natural gas in Parts B, C 
and D.
    8. Added question 7b to Schedule 3, Part C, and 9b to Schedule 3, 
Part D--``Will this generator be part of a Solid Fuel Gasification 
system?''
    9. Deleted question from Schedule 3, Part D.--Expected Active Power 
Output at Maximum Reactive Output (MW).
    10. Deleted question from Schedule 3, Part B--Active Power Output 
at Maximum Reactive Output (MW).
    11. Modified Schedule 3, Part D, Question 7 to: ``Will this 
generator be associated with a Combined Heat and Power system (fuel 
input is used to produce both electricity and useful thermal output?)'' 
and Question 8 to ``Will this be a Distributed Generator?''
    12. Deleted Schedule 7.

For Form EIA-861

    1. Deleted word ``Retail'' from Schedule 4, Parts A, B, C, and D.
    2. Deleted SCHEDULE 4. RETAIL SALES TO ULTIMATE CUSTOMERS, PART E. 
ANY OTHER RETAIL ENERGY SERVICE PROVIDER THAT DOES NOT MEET THE 
REQUIREMENTS FOR SCHEDULES A THROUGH D.

For Form EIA-906

    1. Modified response due date on form from ``10 days following the 
end of the report month,'' to ``the last day of the month following the 
end of the reporting period.''
    2. Modified ``Stocks at End of Reporting Month'' to ``Stocks at End 
of Reporting Period.''

For Form EIA-920

    1. Modified response due date on form from 10 working days after 
the end of the report month to the last day of the month following the 
end of the reporting period.
    2. Modified ``Stocks at End of Reporting Month'' to ``Stocks at End 
of Reporting Period.''
    3. Added line f--Other Outgoing Electricity to Schedule 4.2.
    7. Business or other for-profit; State, local or tribal government; 
Federal government.
    8. 155, 120 hours of burden.
    Please refer to the supporting statement as well as the proposed 
forms and instructions for more information about the purpose, who must 
report,

[[Page 54771]]

when to report, where to submit, the elements to be reported, detailed 
instructions, provisions for confidentiality, and uses (including 
possible nonstatistical uses) of the information. For instructions on 
obtaining materials, see the FOR FURTHER INFORMATION CONTACT SECTIONn.

    Statutory Authority: Section 3507(h)(1) of the Paperwork 
Reduction Act of 1995 (Pub. L. No. 104-13)(44 U.S.C. 3501 et seq).

    Issued in Washington, DC, September 2, 2004.
Jay H. Casselberry,
Agency Clearance Officer, Statistics and Methods Group, Energy 
Information Administration.
[FR Doc. 04-20500 Filed 9-9-04; 8:45 am]

BILLING CODE 6450-01-P