ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6656-1]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under Section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act, as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at (202) 564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in FR dated April 02, 2004 (69 FR 17403).
Draft EISs
ERP No. D-AFS-E65069-AL Rating LO, Longleaf Ecosystem Restoration
Project, Proposes a Five-Year Project to Begin Restoration of Native
Longleaf, Talladega National Forest, Oakmulgee District, Tuscaloosa,
Hale, Bibbs, and Perry Counties, AL.
Summary: EPA has no objections to this project.
ERP No. D-AFS-J65419-MT Rating EC2, Gallatin National Forest, Main
Boulder Fuels Reduction Project, Implementation, Gallatin National
Forest, Big Timber Ranger District, Big Timber, Sweet Grass and Park
Counties, MT.
Summary: EPA supports activities to reduce fuels and fire risk and
increase public and firefighter safety. However, EPA is concerned about
the potential for timber harvest activities and road construction to
adversely impact aquatic
[[Page 57277]]
resources, riparian habitat and functions.
ERP No. D-AFS-L65465-OR Rating EC2, Tamarack Quarry Expansion
Project, Secure a Long-Term, Economical Source of Rock Material to Use
for Highway and Road Maintenance, Mt. Hood National Forest, Clackamas
County, OR.
Summary: EPA expressed environmental concerns with potential
adverse impacts to water quality and hydrology. The Final EIS should
include proposed excavation, reclamation and spill plans, including
appropriate mitigation measures.
ERP No. D-FHW-F40424-OH Rating EC2, US 33 Nelsonville Bypass
Project, To Upgrade Existing Four-Lane Controlled Access Expressway
between Haydenville in Hocking County and New Floodwood in Hocking and
Athens Counties, OH.
Summary: EPA expressed concerns due to forest fragmentation,
habitat loss, and potential threats to threatened and endangered
species. In addition, EPA requested information on drinking water
sources, highway runoff, impacts to groundwater, and cumulative impacts
associated with habitat fragmentation.
ERP No. D-FHW-J40163-UT Rating EC2, Iron County Transportation
Corridors, Construction from Station Road 56 to Exit 51 on Interstate
15, Funding and Right-of-Way Grant, Southwest of the Cedar City, Iron
County, UT.
Summary: EPA expressed concerns due to habitat fragmentation
impacts, additional air emissions, environmental justice, and the
cultural resources analysis.
ERP No. D-FRA-K53009-CA Rating EO2, California High-Speed Train
System, Proposes a High-Speed Train (HST) System for Intercity Travel,
Extending from Sacramento and the San Francisco Bay Area in the north,
through Central Valley, to Los Angeles and San Diego in the south,
Orange County, CA.
Summary: EPA expressed objections due to potential significant
impacts to aquatic resources of national importance, wetlands, and
habitat fragmentation in the Bay Area to Merced and the Bakersfield to
Los Angeles regions, and impacts to farmland and resources from
proposed bypasses around Central Valley communities. Information is
requested that fully discloses the estimated direct, indirect, and
cumulative impacts to aquatic and biological resources.
ERP No. D-NPS-K65271-CA Rating EC2, Santa Monica Mountains National
Recreation Area, Fire Management Plan, Implementation, Santa Monica
Mountains, CA.
Summary: EPA expressed concerns that the prescribed burn treatments
in the proposed alternative may result in more adverse air quality
impacts than using only mechanical treatment to meet the same needs.
EPA recommend that the FEIS analyze another mechanical treatment
alternative and assess air quality impacts for criteria pollutants
other than PM10.
Final EISs
ERP No. F-BLM-J65393-CO, Colorado Canyons National Conservation
Area and Black Ridge Canyons Wilderness Resource Management Plan,
Implementation, Mesa County, CO.
Summary: No comment letter was sent to the preparing agency.
ERP No. F-BLM-K08027-NV, Tracy to Silver Lake Transmission Line
Project, Construction, Operation and Maintenance of a 120kV
Transmission Line from Tracy Power Plant to New Substations in the
Spanish Spring Valley and Stead Areas, Right-of-Way Application, Washoe
County, NV.
Summary: No comment letter was sent to the preparing agency.
ERP No. F-COE-K39066-CA, Port J. Long Beach Pier J South Terminal
Expansion Project, Additional Cargo Requirements Associated with
Growing Export and Import Volumes, Port Master Plan (PMP) Amendment,
COE Section 404, 401 and 10 Permits, City of Long Beach, CA.
Summary: No comment letter was sent to the preparing agency.
Dated: September 21, 2004.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 04-21491 Filed 9-23-04; 8:45 am]