[Federal Register: October 4, 2004 (Volume 69, Number 191)]
[Rules and Regulations]
[Page 59135]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr04oc04-7]
[[Page 59135]]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD01-04-121]
Drawbridge Operation Regulations: Annisquam River and Blynman
Canal, MA
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the drawbridge operation regulations for the
SR 127 Bridge, mile 0.0, across the Annisquam River, Blynman Canal, at
Gloucester, Massachusetts. This deviation allows the bridge to remain
in the closed position from 6 a.m. on November 6, 2004 through 6 p.m.
on November 7, 2004. In the event of inclement weather the alternate
bridge closure would be from 6 a.m. on November 13, 2004 through 6 p.m.
on November 14, 2004. This temporary deviation is necessary to
facilitate structural repairs at the bridge.
DATES: This deviation is effective from November 6, 2004 through
November 14, 2004.
FOR FURTHER INFORMATION CONTACT: John McDonald, Project Officer, First
Coast Guard District, at (617) 223-8364.
SUPPLEMENTARY INFORMATION: The SR 127 Bridge, at mile 0.0, across the
Annisquam River, Blynman Canal, has a vertical clearance of 7 feet at
mean high water, and 16 feet at mean low water in the closed position.
The existing regulations are listed at 33 CFR 117.586.
The bridge owner, Massachusetts Highway Department, requested a
temporary deviation from the drawbridge operating regulations to
facilitate necessary structural repairs, the replacement of the swing
cables, at the bridge.
This deviation to the operating regulations allows the SR 127
Bridge to remain in the closed position from 6 a.m. on November 6, 2004
through 6 p.m. on November 7, 2004. In the event the repair work
scheduled above can not be performed due to inclement weather an
alternate bridge closure will be implemented from 6 a.m. on November
13, 2004 through 6 p.m. on November 14, 2004.
This deviation from the operating regulations is authorized under
33 CFR 117.35 and will be performed with all due speed in order to
return the bridge to normal operation as soon as possible.
Dated: September 17, 2004.
David P. Pekoske,
Rear Admiral, U.S. Coast Guard, Commander, First Coast Guard District.
[FR Doc. 04-22275 Filed 10-1-04; 8:45 am]
BILLING CODE 4910-15-P