[Federal Register: November 26, 2004 (Volume 69, Number 227)]
[Notices]
[Page 68899-68900]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr26no04-68]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6657-9]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed November 15, 2004 through November 19, 2004
Pursuant to 40 CFR 1506.9.
EIS No. 040536, Final Supplement, GSA, TX, Del Rio Port of Entry (POE),
Increased Security Measures Associated with Phase II Expansion,
Supplement to the 1992 Del Rio Border Patrol Station, Del Rio, Val
Verde County, TX, Wait Period Ends: December 27, 2004, Contact: Lisa
Schaub (817) 978-4233.
EIS No. 040537, Final EIS, FHW, WI, US-12 Highway Corridor Project,
Improvement from 1H90/94 at Lake Delton south to Ski Hi Road, Selected
Preferred Alternative, Funding and U.S. Army COE Section 404 Permit
Issuance, Sauk County, WI, Wait Period Ends: December 27, 2004,
Contact: Johnny Gerbitz (608) 829-7500.
EIS No. 040538, Draft EIS, FAA, FL, Panama City-Bay County
International Airport (PFN), Proposed Relocation to a New Site, NPDES
Permit and U.S. Army COE Section 404 Permit, Bay County, FL, Comment
Period Ends: January 21, 2005, Contact: Virginia Lane (407) 812-6331
ext 129.
EIS No. 040539, Final EIS, FHW, TX, Eastern Extension of the President
George Bush Turnpike (PGBT) from TX-78 to I-30, New Controlled Access
Tollway Construction at a New Location, Cities of Garland, Sachse,
Rowlett and Dallas, Dallas County, TX, Wait Period Ends: December 27,
2004, Contact: Dean Majzoub (512) 536-5955.
EIS No. 040540, Draft EIS, FRC, TX, Cheniere Corpus Christi Liquefied
Natural Gas (LNG) Project, To Provide Facilities for the Importation,
Storage and Vaporization of Liquefied Natural Gas, Nueces and San
Patricio Counties, TX, Comment Period Ends: January 10, 2005, Contact:
Thomas Russo (866) 208-3372.
EIS No. 040541, Draft EIS, FHW, MS, I-69 Section of Independent Utility
11 Project, Construction of Multi-Lane, Interstate Highway
from Benoit to Robinsonville, U.S. Army COE Section 404 Permit,
Mississippi River Bridge, Bolivar, Coahoma, Tunica and Sunflower
Counties, MS, Comment Period Ends: January 10, 2005, Contact: Cecil W.
Vick, Jr. (601) 965-4217.
EIS No. 040542, Draft EIS, AFS, OR, Rogue River-Siskiyou National
Forest, Special Use Permits for Outfitter and Guide Operations on the
Lower Rogue and Lower Illinois Rivers, Gold Beach Ranger District,
Rogue River-Siskiyou National Forest, Curry County, OR, Comment Period
Ends: January 10, 2005, Contact: Jim Heck (541) 858-2303. This document
is available on the Internet at: http://wwwtest.fs.fed.us/r6/rogue-siskiyou/projects/special-use/outfitter-rogue-illinois-river/rr-deis-ll-04-04.pdf
.
Amended Notices
EIS No. 040472, Draft EIS, AFS, CO, Village at Wolf Creek Project,
Application for Transportation and Utility Systems and Facilities,
Proposed Development and Use of
[[Page 68900]]
Roads and Utility Corridors Crossing, National Forest System Lands to
Access 287.5 Acres of Private Property Land, Mineral County, CO,
Comment Period Ends: December 06, 2004, Contact: Robert Dalrymple (719)
852-5941. Revision of FR Notice Published on 10/08/04: CEQ Comment
Period Ending 11/22/2004 has been Extended to 12/06/2004.
EIS No. 040500, Draft EIS, FHW, UT, Brown Park Road Project,
Reconstruction (Paving) and Partial Re-alignment from Red Creek to
Colorado State Line, Diamond Mountain Resource Management Plan
Amendment (BLM), U.S. Army COE Section 404 Permit, Daggett County, UT,
Comment Period Ends: January 10, 2005, Contact: Gregory S. Punske, P.E.
(801) 963-0182. Revision of FR Notice Published on 10/29/2004: CEQ
Comment Period Ending on 12/17/2004 has been Extended to 01/10/2005.
EIS No. 040532, Final EIS, FHW, IN, IN-25 Transportation Corridor
Improvements from I-65 Interchange to U.S. 24, Funding, Right-of-Way
and U.S. Army COE Section 404 Permit Issuance, Hoosier Heartland
Highway, Tippecanoe, Carroll and Cass Counties, IN, Wait Period Ends:
December 27, 2004, Contact: Matt Fuller (317) 226-5234. Revision of FR
Notice Published on 11/19/2004: CEQ Wait Period Ending 12/20/2004
Corrected to12/27/2004.
EIS No. 040533, Final EIS, FHW, WA, WA-104/Edmonds Crossing Project,
Connecting Ferries, Bus and Rail, Funding, NPDES Permit and COE Section
10 and 404 Permit, City of Edmonds, Snohomish County, WA, Wait Period
Ends: December 20, 2004, Contact: Peter Eun (360) 753-9551. Revision of
FR Notice published on 11/19/2004: The Department of Transportation's
Federal Highway Administration and Federal Transit Administration are
Joint Lead Agencies for the above Project. Also, Correction to Contact
Person Telephone Number.
Dated: November 22, 2004.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. 04-26160 Filed 11-24-04; 8:45 am]
BILLING CODE 6560-50-P