[Federal Register: December 17, 2004 (Volume 69, Number 242)]
[Notices]
[Page 75535-75536]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr17de04-71]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6658-6]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements Filed December 6,
2004 through December 10, 2004 Pursuant to 40 CFR 1506.9.
EIS No. 040567, Final EIS, FHW, NY, Slingerlands Bypass Extension (NYS
Route 85) (P.I.N. 1125.19) Route 140 (Cherry Avenue Extension) to the
Albany City Line, Reconstruction Town of Bethlehem, Albany County, NY,
Wait Period Ends: January 18, 2005, Contact: Robert Arnold (581) 431-
4127.
EIS No. 040568, Final EIS, FHW, IL, U.S. Route 20 (FAP 301) Project,
Construction from IL Route 84 north of Galena to Bolton Road northwest
of Freeport, Funding, NPDES Permit and U.S. Army COE Section 404 Permit
Issuance, Jo Davies and Stephenson Counties, IL, Wait Period Ends:
January 18, 2005, Contact: Norman R. Stoner (217) 492-4640.
EIS No. 040569, Draft EIS, NRC, VA, Early Site Permit (ESP) at the
North Anna Power Station ESP Site (TAC No. MC1128), Construction and
Operation, NUREG-1811, Louisa County, VA, Comment Period Ends: March 1,
2005, Contact: Jack Cushing (301) 415-1424.
EIS No. 040570, Final EIS, AFS, OR, Diamond Lake Restoration Project,
Improve Water Quality and the Recreational Fishery, Umpqua National
Forest, Diamond Lake Ranger District, Umpqua River Basin, Douglas
County, OR, Wait Period Ends: January 18, 2005, Contact: Sherri
Chambers (541) 496-3532.
EIS No. 040571, Draft EIS, COE, OH, Mill Creek, Ohio Flood Damage
Reduction Project, To Reduce Damages to Communities, Hamilton County,
OH , Comment Period Ends: January 31, 2005, Contact: Barry Schueler
(502) 315-6780.
EIS No. 040572, Final EIS, FHW, WI, US 10 Highway Improvements between
Marshfield and Appleton, Trestik Road--CTH ``K'' (Stevens Point
Bypass), Funding and COE Section 404 Permit, Portage County, WI, Wait
Period Ends: January 18, 2005, Contact: Wesley Shemwell (608) 829-7521.
EIS No. 040573, Final EIS, FHW, TX, Kelly Parkway Project, Construction
from U.S. 90 to TX-16, to Improvement Transportation Mobility,
Facilitate Economic Development, and Enhance Safety, Funding and U.S.
Army COE Section 404 Permit, San Antonio, Bexar County, TX, Wait Period
Ends: January 18, 2005, Contact: Salvador Deocampo (512) 536-5950.
EIS No. 040574, Draft EIS, AFS, NM, Buckman Water Diversion Project,
Proposal to Divert Water from Rio Grande and San Juan-Chama Project, To
Meet Water Supply Needs, Sante Fe National Forest and Taos Field
Office, Sante Fe County, NM, The U.S. Department of Agriculture's,
Forest Service and The U.S. Department of Interior's, Bureau of Land
Management are Joint Lead Agencies on the above project. The Contact
Person for AFS is Sanford Hurlocker at phone number (505) 753-7331;
Contact person for BLM is Sharon Churchill at (505) 751-4725.
EIS No. 040575, Final EIS, IBR, CA, San Joaquin River Exchange
Contractors Water Authority--2005 to 2014, Water Transfer Program,
Stanislaus, San Joaquin, Merced, Madera, Fresno, San Benito, Santa
Clara, Kern, and Kings Counties, CA, Wait Period Ends: January 18,
2005, Contact: Bob Eckart (916) 978-5051.
EIS No. 040576, Final EIS, BIA, OR, Wanapa Energy Center, Construction
and Operation a New 1,200 Megawatt (MW) Natural Gas-Fired Electric
Power Generating Facility, Confederated Tribes of the Umatilla Indian
Reservation (CTUIR), in the City of Hermiston and the Port of Umatilla,
OR, Wait Period Ends: January 18, 2005, Contact: Jerry Lauer (541) 278-
3786.
EIS No. 040577, Final EIS, BIA, WY, Wind River Natural Gas Field
Development Project, Construction, Drilling and Production Operation of
Natural Gas Wells, Fremont County, WY, Wait Period Ends: January 18,
2005, Contact: Ray A. Nation (307) 332-3718.
EIS No. 040578, Final, FTA, OR, WA, South Corridor Project, I-205/
Portland Mall Light Rail (Phase I), Selected the Locally Preferred
Alternative (LPA), Clackamas and Multnomah Counties, OR, Wait Period
Ends: January 31, 2005, Contact: Rebecca Reyes-Alicea (206) 220-4464.
EIS No. 040579, Final EIS, DOI, AZ, CA, NV, NM, Programmatic EIS--Lower
Colorado River Multi-Species Conservation Program, Issuing a Incidental
Take Permit based on the Plan, Extending from Lake Mead to the
Southerly International Boundary with Mexico, AZ, NV and CA, Wait
Period Ends: January 18, 2005, Contact: Glen Gould (702) 293-8702.
EIS No. 040580, Final EIS, NPS, WI, Arrowhead-Weston Transmission Line
Right-of-Way Crossing of the St. Croix National Scenic Riverway, U.S.
Army COE Section 10 and 404 Permits, Washburn County, WI, Wait Period
Ends: January 18, 2005, Contact: Jill Medland (715) 483-3284.
EIS No. 040581, Final EIS, DOE, CA, Imperial-Mexicali 230-kV
Transmission Lines, Construct a Double-Circuit 230-kV Transmission
Line, Presidential Permit and Right-of-Way Grants, Imperial Valley
Substation to Calexico at the U.S.-Mexico Border, Imperial County, CA
and U.S.-Mexico Border, Wait Period Ends: January 18, 2005, Contact:
Ellen Russell (202) 586-9624.
EIS No. 040582, Final EIS, IBR, CA, Sacramento River Settlement
Contractors (SRSC), To Renew the Settlement Contractors Long-Term
Contract Renewal for 145 Contractors, Central Valley Project (CVP),
Sacramento River, Shasta, Tehama, Butte, Glenn, Colusa, Sutter, Yolo,
Sacrament, Portion of Placer and Solano Counties, CA, Wait Period Ends:
January 18, 2005, Contact: Buford Holt (916) 989-7179.
EIS No. 040583, Draft EIS, BLM, WY, Rawlin Field Office Planning Area
Resource Management Plan, Addresses the Comprehensive Analysis of
Alternatives for the Planning and Management of Public Land and
Resource Administered by (BLM), Albany, Carbon, Laramie and Sweetwater
Counties, WY , Comment Period Ends: March 17, 2005, Contact: John
Spehar (307) 328-4264.
[[Page 75536]]
Amended Notices
EIS No. 040472, Draft EIS, AFS, CO, Village at Wolf Creek Project,
Application for Transportation and Utility Systems and Facilities,
Proposed Development and Use of Roads and Utility Corridors Crossing,
National Forest System Lands to Access 287.5 Acres of Private Property
Land, Mineral County, CO, Comment Period Ends: January 5, 2005,
Contact: Robert Dalrymple (719) 852-5941. Revision of FR Notice
Published on 11/26/2004: CEQ Comment Period Ending on 12/06/2004 has
been Extended to 1/05/2005.
EIS No. 040538, Draft EIS, FAA, FL, Panama City-Bay County
International Airport (PFN), Proposed Relocation to a New Site, NPDES
Permit and U.S. Army COE Section 404 Permit, Bay County, FL, Comment
Period Ends: January 28, 2005, Contact: Virginia Lane (407) 812-6331,
Ext 129. Revision of FR Notice Published on 11/26/04: CEQ Comment
Period Ending 1/21/2005 has been Extended to 1/28/2005.
EIS No. 040564, Final EIS, AFS, SD, Southeast Geographic Area Rangeland
Management on National Forest System Lands of the Buffalo Gap National
Grassland, To Implement Best Management Grazing Practices, Buffalo Gap
National Grassland, Falls River Ranger District, Fall River County, SD,
Wait Period Ends: January 10, 2005, Contact: Michael L. Erik (605) 745-
4107. Revision of FR Notice Published on 12/10/04: Correction to Title.
Dated: December 14, 2004.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 04-27673 Filed 12-16-04; 8:45 am]
BILLING CODE 6560-50-P