[Federal Register: February 27, 2004 (Volume 69, Number 39)]
[Page 9314-9315]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr27fe04-50]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6648-7]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed February 23, 2004 Through February 27, 2004
Pursuant to 40 CFR 1506.9.
EIS No. 040072, Final EIS, AFS, WY, Blackhall-McAnulty Analysis Area,
Proposal to Reduce the Spread of Dwarf Mistletoe and Mountain Pine
Beetle in Lodgepole Pine Stands, Brush Creek/ Hayden Ranger District,
Medicine Bow-Routt National Forests and Thunder Basin National
Grassland, Carbon County, WY, Wait Period Ends: March 29, 2004,
Contact: Terry Delay (307) 326-2518. This document is available on the
Internet at: http://www.fs.fed.us/r2/mbr.
EIS No. 040073, Draft EIS, AFS, UT, Trout Slope West Timber Project,
Harvesting Timber, Ashley National Forest, Vernal Ranger District,
Uintah County, UT, Comment Period Ends: April 12, 2004, Contact: Jeff
Underhill (435) 781-5174. This document is available on the Internet
at: http://www.fs.fed.us/r4/ashley.
EIS No. 040074, Final EIS, HUD, WA, Tacoma Housing Authority (THA) Hope
VI Salishan Redevelopment Project, Revitalize the Community
Neighborhood, Funding, NHPA Section 106, NPDES Permit, City of Tacoma,
WA, Wait Period Ends: March 29, 2004, Contact: Karie Hayashi (253) 591-
5387. This document is available on the Internet at: http//
govme.cityoftacoma.org/govme/panelBeta/ PermitInfo/LandUse/
landUse.aspx.
EIS No. 040075, Final EIS, AFS, CA, Silver Pearl Land Exchange Project,
Proposal to Exchange 2,153 Acres of National Forest System (NFS) Land
for up to 3,963 Acres of Sierra Pacific Industries (SPI) Land within
the boundary of Eldorado National Forest, Eldorado and Placer Counties,
CA, Wait Period Ends: March 29, 2004, Contact: Elaine K. Gee (530) 333-
4312.
EIS No. 040076, Draft EIS, FHW, KY, IN, Interstate 69 National
Corridor, Connecting Henderson, Kentucky to Evansville, Indiana, NPDES,
and U.S. Army COE Section 10 and 404 Permits, Transportation Equity Act
for the 21st, KY and IN, Comment Period Ends: April 19, 2004, Contact:
Anthony DeSimone (317) 226-5307. This document is available on the
Internet at: http://www.i69in-ky.com.
EIS No. 040077, Final EIS, AFS, AZ, Rodeo-Chediski Fire Salvage
Project, Timber Harvest of Merchantable Dead Trees as Sawtimber and
Products other than Lumber (POL), Implementation, Apache-Sitgreaves and
Tonto National Forest, Apache, Coconino and Navajo Counties, AZ, Wait
Period Ends: March 29, 2004, Contact: Jimmy E. Hibbetts (928) 333-6284.
EIS No. 040078, Draft EIS, AFS, ID, WA, Chips Ahoy Project, Proposes
Vegetation, Wildlife Habitat, Recreation and Aquatic Improvement
Treatments, Idaho Panhandle National Forests, Priest Lake Ranger
District, Bonner County, ID and Pend Orielle County, WA, Comment Period
Ends: April 12, 2004, Contact: David DelSordo (208) 443-6809. This
document is available on the Internet at: http://www.fs.fed.us/ipnf/eco/manage/nepa/index.htm1
.
EIS No. 040079, Final EIS, TVA, TN, KY, MS, VA, AL, GA, NC,
Programmatic EIS--Tennessee Valley Authority Reservoir Operations
Study, Implementation, TN, AL, KY, GA, MS, NC and VA, Wait Period Ends:
April 12, 2004, Contact: Linda Shipp (865) 632-3440.
EIS No. 040080, Draft EIS, FHW, AR, Conway Western Arterial Loop,
Construct from South and West sides of Conway, Faulkner County, AR,
Comment Period Ends: April 12, 2004, Contact: Randal J. Looney (501)
324-6430.
EIS No. 040081, Draft EIS, NOA, WA, CA, OR, Programmatic EIS--Pacific
Coast Groundfish Bycatch Management, To Establish the Policies and
Program Direction to Minimize Bycatch in the West Coast Groundfish
Fisheries, Magnuson-Stevens Act, WA, OR and CA, Comment Period Ends:
April 27, 2004, Contact: D. Robert Lohn (206) 526-6150. This document
is available on the Internet at: http://www.nwr.noaa.gov/1sustfsh/groundfish/eis_efh/pseis/
.
EIS No. 040082, Draft EIS, AFS, ND, Equity Oil Company Federal 32-4 and
23-21 Oil and Gas Wells Surface Use Plan of Operation (SUP0),
Implementation, Located in the Bell Lake Inventoried Roadless Area
(IRA), Dakota Prairie Grasslands, Medora Ranger District, Golden Valley
County, ND, Comment Period Ends: April 12, 2004, Contact: Jeff Adams
(701) 225-5151.
EIS No. 040083, Final EIS, FHW, NC, Western Wake Freeway,
Transportation Improvements from NC-55 at NC-1172 (Old Smithfield Road)
to NC-55 near NC-1630 (Alston Avenue), Funding and COE 404 Permit, Wake
County, NC, Wait Period Ends: March 29, 2004, Contact: John F. Sullivan
(919) 856-4346.
EIS No. 040084, Draft EIS, AFS, MT, West Troy Project, Proposes Timber
Harvesting, Natural Fuels Reduction Treatments, Pre-Commercial
Thinning, and Watershed Rehabilitation (Decommission) Work, Kootenai
National Forest, Three River
[[Page 9315]]
Ranger District, Lincoln County, MT, Comment Period Ends: April 12,
2004, Contact: Michael L. Balboni (406) 295-7410.
EIS No. 040085, Final EIS, FRC, CO, KS, CO, KS Cheyenne Plains Pipeline
Project, Natural Gas Transmission Pipeline, Construction and Operation,
NPDES Permit and U.S. Army COE Section 404 Permit Issuance, several
counties, CO and several counties, KS, Wait Period Ends: March 29,
2004, Contact: Thomas Russo (866) 208-3372.
EIS No. 040086, Draft EIS, DOE, CA, Site-wide Continued Operation of
Lawrence Livermore National Laboratory (LLNL) and Stockpile Stewardship
and Management, Implementation, Alameda and San Joaquin Counties, CA,
Comment Period Ends: May 27, 2004, Contact: Thomas Grim (925) 422-0704.
EIS No. 040087, Draft Supplement, DOE, TN, GA, TX, SC, MO, Programmatic
EIS--Site-wide Continued Operation of Lawrence Livermore National
Laboratory (LLNL) and Supplemental Stockpile Stewardship and Management
Plan for use of Proposed Materials at the National Ignition Facility
(NIF), Implementation, Alamenda and San Joaquin Counties, CA, Comment
Period Ends: May 27, 2004, Contact: Thomas Grim (925) 422-0704.
Amended Notices
EIS No. 000213, Draft EIS, IBR, AZ, Central Arizona Project (CAP),
Allocation of Water Supply and Long-Term Contract Execution, Maricopa,
Pinal and Pima Counties, AZ, Comment Period Ends: April 26, 2004,
Contact: Sandra Eto (602) 216-3857. Published FR-06-30-00--Review
Period Reopened, From 08-25-2000 to 04-26-2004. Draft EIS is
Recirculated. This document is available on the Internet at: http://www.usbr.gov/lc/phoenix/
.
Dated: February 24, 2004.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. 04-4388 Filed 2-26-04; 8:45 am]
BILLING CODE 6560-50-P