[Federal Register: April 16, 2004 (Volume 69, Number 74)]
[Notices]
[Page 20608-20609]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr16ap04-50]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6650-4]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under Section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at (202) 564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in FR dated April 02, 2004 (69 FR 17403).
Draft EISs
ERP No. D-AFS-K65266-AZ Rating LO, Arizona Snowbowl Facilities
Improvements, Proposal to Provide a Consistent/Reliable Operating
Season, Coconino National Forest, Coconino County, AZ.
Summary: While EPA had no objections to the plan as proposed, EPA
did request clarification on Tribe consultation and mitigation of
erosion and air quality impacts associated with construction.
ERP No. D-BIA-J60021-UT Rating EC2, Tekoi Balefill Project on the
Skull Valley Band of Goshute Indians Reservation, Approval of Long-Term
Lease of Indian Land for a Commercial Solid Waste Disposal Facility,
Salt Lake City, Tooele County, UT.
Summary: EPA expressed concerns regarding environmental oversight
of the landfill during design, construction, operation, and closure.
Although the landfill will be regulated under RCRA, there are no
provision for Tribes to develop approved RCRA municipal solid waste
programs to permit and oversee the landfill. Additional information is
also needed regarding faults at the proposed site and groundwater
availability.
ERP No. D-FHW-E40799-TN Rating EC2, Appalachian Development Highway
System Corridor K (Relocated Highway U. S. 64), Improvements from West
of the Ocoee River to TN-68 near Ducktown, Funding, U.S. Army Corps
Section 10 and 404 Permits, Polk County, TN.
Summary: EPA expressed concerns regarding the potential of the
project to further degrade water quality and aquatic habitat in the
Ocoee River watershed.
ERP No. D-FHW-H40182-00 Rating LO, US-159 Missouri River Crossing
Project, Rehabilitate or Replace the Missouri River Bridge at Rulo,
Funding and U.S. Army COE Section 404 Permit, Richardson County, NE and
Holt County, MO.
Summary: EPA has no objection to the proposed project. However, EPA
does request clarification on the type of bridge configuration that the
build alternative would employ as well as the potential impact to
wildlife movement and habitat use within the riparian section of the
floodplain. EPA also requests that the Memorandum of Agreement between
the NDOR and SHPO be included in the FEIS.
ERP No. DB-NOA-G64002-00 Rating LO, Reef Fish Management Plan
Amendment 22, To Set Red Snapper Sustainable Fisheries Act Targets and
Thresholds, Set a Rebuilding Plan, and Establish Bycatch Reporting
Methodologies for the Reef Fish Fishery, Gulf of Mexico.
Summary: While EPA has no objections to the proposed action, EPA
recommended that the red snapper bycatch issue associated with the
shrimp fishery be addressed in future amendments to the shrimp FMP.
Final EISs
ERP No. F-AFS-J65371-WY Medicine Bow National Forest Revised Draft
Land and Resource Management Plan, Implementation, Albany, Carbon and
Laramie Counties, WY.
Summary: EPA continues to express concerns regarding potential
adverse impacts to aquatic and soil resources.
ERP No. F-FHW-J40156-ND US 2 Highway Transportation Improvements
from near U.S. 85 (milepost 31.93) to west of U.S. 52 (milepost
131.24), Funding, NPDES and U.S. Army COE Section 404 Permits Issuance,
Williams, Mountrail and Ward Counties, ND.
Summary: EPA continues to express environmental concerns with the
proposed project due to wetland and aquatic resource impacts and the
limited details regarding mitigation for these impacts.
ERP No. F-NRC-E06022-SC Generic--License Renewal of Nuclear Plants,
Virgil C. Summer Nuclear Station, Supplement 15, Fairfield County, SC.
Summary: EPA continues to have concerns and recommended that the
project assure that there is radiological monitoring of all plant
effluents, and that there is appropriate storage and disposition of
radioactive waste.
[[Page 20609]]
Dated: April 13, 2004.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. 04-8671 Filed 4-15-04; 8:45 am]
BILLING CODE 6560-50-P