[Federal Register: January 2, 2004 (Volume 69, Number 1)]
[Notices]               
[Page 59-62]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr02ja04-40]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. AC04-7-000, et al.]

 
Portland General Electric Company, et al.; Electric Rate and 
Corporate Filings

December 19, 2003.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

1. Portland General Electric Company

[Docket No. AC04-7-000]

    Take notice that on December 3, 2003, Portland General Electric 
Company (Portland) tendered for filing a request for waiver or 
extension of time to comply with the Commission's Uniform System of 
Accounts pertaining to natural gas pipeline companies, and the 
requirements for filing a FERC Form 2-A by non-major gas pipeline 
companies. Portland states that this request is necessitated by the 
change in status of Portland's facilities in the Kelso-Beaver Pipeline 
from pipeline facilities only serving the plant owned by Portland, to 
an open access gas pipeline.
    Comment Date: January 5, 2004.

2. American Transmission Company LLC

[Docket No. EC04-37-000]

    Take notice that on December 12, 2003, American Transmission 
Company LLC (ATCLLC) tendered for filing an Application for Authority 
to Acquire Transmission Facilities Under Section 203 of the Federal 
Power Act. ATCLLC requests that the Commission authorize

[[Page 60]]

ATCLLC to acquire ownership of certain transmission facilities from the 
City of Reedsburg, Wisconsin. ATCLLC requests Commission authorization 
within 30 days of the date of the Application.
    Comment Date: January 2, 2004.

3. Duke Energy Marketing America, LLC and Engage Energy, LLC

[Docket No. EC04-38-000]

    Take notice that on December 12, 2003, Duke Energy Marketing 
America, LLC (DEMA) and Engage Energy, LLC (Engage) filed with the 
Federal Energy Regulatory Commission an application pursuant to section 
203 of the Federal Power Act for authorization of DEMA's acquisition of 
Engage.
    Comment Date: January 2, 2004.

4. Sweetwater Wind 1 LLC

[Docket No. EG04-22-000]

    On December 16, 2003, Sweetwater Wind 1 LLC (SWW1), a Delaware 
limited liability company with its principal place of business in 
Houston, Texas, filed with the Federal Energy Regulatory Commission an 
application for determination of exempt wholesale generator status 
pursuant to part 365 of the Commission's regulations.
    SWW1 states it intends to operate a 37.5-MW wind powered generation 
facility currently under construction near Sweetwater, Nolan County, 
Texas (the Facility). SWW1 also states that when completed, the 
electric energy produced by the Facility will be sold into the 
wholesale power market of the Electric Reliability Council of Texas and 
that the Facility is expected to begin commercial operation by December 
31, 2003.
    Comment Date: January 6, 2004.

5. City of Azusa, California

[Docket No. EL04-35-000]

    Take notice that on December 12, 2003, the City of Azusa, 
California (Azusa) submitted for filing changes to its Transmission 
Revenue Balancing Account Adjustment (TRBAA) and to Appendix I of its 
Transmission Owner (TO) Tariff. Azusa requests a January 1, 2004, 
effective date for its filing. Azusa further requests that the 
Commission waive any fees for the filing of its revised TRBAA.
    Comment Date: January 8, 2004.

6. ISO New England Inc.

[ER02-2330-020]

    Take notice that on December 12, 2003, ISO New England Inc. (ISO) 
submitted a Compliance Filing in the above-captioned proceeding as 
directed by the Commission in its August 14, 2003, Order Accepting 
Information Report, 104 FERC ] 61,206. The ISO states that copies of 
the filing have been served on all parties to the above-captioned 
proceeding.
    Comment Date: January 2, 2004.

7. Carolina Power & Light Company d/b/a and Progress Energy Carolinas, 
Inc.

[Docket Nos. ER03-414-003 and ER03-415-003]

    Take notice that on December 12, 2003, Carolina Power & Light 
Company d/b/a Progress Energy Carolinas, Inc. tendered for filing 
revised facility interconnection and operating agreements with 
Cogentrix of North Carolina, Inc. in accordance with Commission Orders 
dated March 7, 2003, and November 18, 2003.
    Progress Energy Carolinas, Inc. states that a copy of the filing 
was served upon the North Carolina Utilities Commission and the South 
Carolina Public Service Commission.
    Comment Date: January 2, 2004.

8. American Transmission Company LLC

[Docket No. ER03-1211-002]

    Take notice that on December 11, 2003, American Transmission 
Company LLC (ATCLLC) tendered for filing a revised Generation-
Transmission Interconnection Agreement between ATCLLC and Fox Energy 
Company LLC (Second Revised Service Agreement No. 233) consisting of 
amendments to Exhibit 11. ATCLLC requests retention of the original 
effective date of January 15, 2002. ATCLLC states that this is a 
refiling of the same revisions contained in ATCLLC's August 14, 2003, 
filing in a format complying with the Commission's conditional 
acceptance in its September 23, 2003, Letter Order and deleting certain 
extraneous documents.
    Comment Date: December 31, 2003.

9. CenterPoint Energy Houston Electric, LLC

[Docket No. ER04-41-001]

    Take notice that on December 15, 2003, CenterPoint Energy Houston 
Electric, LLC (CenterPoint Houston) submitted for filing a revision of 
the Table of Contents to its Transmission Service Tariff, reflecting 
the addition of the Form of Transmission Service Agreement.
    Comment Date: January 5, 2004.

10. The Dayton Power and Light Company

[Docket No. ER04-77-001]

    Take notice that on December 12, 2003, the Dayton Power and Light 
Company (Dayton), Cincinnati Gas and Electric Company (CG&E) and 
Columbus Southern Power Company (CSP) (together CCD) amended a 
submission made October 21, 2003, in Docket No. ER04-77-000 tendering 
an Interconnection Agreement between DP&L, CG&E, CSP and East Kentucky 
Power Cooperative.
    Comment Date: January 2, 2004.

11. New England Power Pool

[Docket Nos. ER04-195-001]

    Take notice that on December 12, 2003, the New England Power Pool 
(NEPOOL) Participants Committee submitted an informational filing to 
notify the Commission that as of December 5, 2003, NEPOOL, ISO New 
England Inc. and NRG Power Marketing Inc. (NRG Power), acting on behalf 
of itself and several affiliates, entered into an agreement to amend 
the Restated Weekly Billing Agreement filed in Docket No. ER04-195-000 
on November 17, 2003.
    The NEPOOL Participants Committee states that copies of these 
materials were served on the governors and electric utility regulatory 
agencies for the six New England states and each person designated on 
the official service list compiled by the Secretary in the captioned 
docket and NEPOOL Participants Committee members have been furnished 
with an electronic copy of this filing.
    Comment Date: January 2, 2004.

12. CPV Milford, LLC

[Docket No. ER04-222-002]

    Take notice that on December 16, 2003, CPV Milford, LLC tendered 
for filing an amendment to the application for market-based rates 
pursuant to section 205 of the Federal Power Act submitted on November 
24, 2003, in Docket No. ER04-222-000.
    Comment Date: December 29, 2003.

13. PJM Interconnection, L.L.C.

[Docket No. ER04-281-000]

    Take notice that on December 12, 2003, PJM Interconnection, L.L.C. 
(PJM), submitted for filing an interconnection service agreement (ISA) 
among PJM, Exelon Generation Company, LLC, PSEG Nuclear LLC, and PECO 
Energy Company and a notice of cancellation for an Interim ISA that has 
been superseded.
    PJM requests a waiver of the Commission's 60-day notice requirement 
to permit a November 12, 2003, effective date for the ISA.
    PJM states that copies of this filing were served upon the parties 
to the agreements and the state regulatory commissions within the PJM 
region.

[[Page 61]]

    Comment Date: January 2, 2004.

14. Midwest Independent Transmission System Operator, Inc.

[Docket No. ER04-282-000]

    Take notice that on December 12, 2003, the Midwest Independent 
Transmission System Operator, Inc. (Midwest ISO) pursuant to section 
205 of the Federal Power Act and section 35.12 of the Commission's 
regulations, 18 CFR 35.12, submitted for filing an Interconnection and 
Operating Agreement among Simon Industries, Inc., the Midwest ISO and 
Northern States Power, d/b/a Xcel Energy.
    The Midwest ISO states that a copy of this filing was served on all 
parties.
    Comment Date: January 2, 2004.

15. Agway Energy Services, Inc.

[Docket No. ER04-283-000]

    Take notice that on December 12, 2003, Agway Energy Services, Inc. 
(Agway) tendered for filing a Notice of Cancellation of its market-
based authority. Agway has requested an effective date of December 15, 
2003.
    Comment Date: January 2, 2004.

16. Agway Energy Services--PA, Inc.

[Docket No. ER04-284-000]

    Take notice that on December 12, 2003, Agway Energy Services--PA, 
Inc. (Agway) tendered for filing a Notice of Cancellation of its 
market-based authority. Agway has requested an effective date of 
December 15, 2003.
    Comment Date: January 2, 2003.

17. Southern California Edison Company

[Docket No. ER04-285-000]

    Take notice that on December 12, 2003, Southern California Edison 
Company (SCE) tendered for filing revised rate sheets (Revised Sheets) 
to the Interconnection Facilities Agreement (Interconnection Agreement) 
between the City of Industry, California (Industry) and SCE, Service 
Agreement No. 49 under SCE's Wholesale Distribution Access Tariff, FERC 
Electric Tariff First Revised Volume No. 5. SCE states that the purpose 
of the Revised Sheets is to reflect, among other things, the terms and 
conditions associated with the additional facilities required to 
provide 7.2 MW of Distribution Service to Industry for its Wholesale 
Distribution Load at the East Business Center.
    SCE states that copies of this filing were served upon the Public 
Utilities Commission of the State of California and Industry.
    Comment Date: January 2, 2004.

18. California Independent System Operator Corporation

[Docket No. ER04-286-000]

    Take notice that, on December 12, 2003, the California Independent 
System Operator Corporation (ISO) submitted an informational filing in 
accordance with Article IX, section B of the Stipulation and Agreement 
approved by the Commission on May 28, 1999, California Independent 
System Operator Corp., 87 FERC ] 61,250 (1999) (Stipulation and 
Agreement). The ISO states that this provision requires the ISO to 
provide on a confidential basis to the Commission: (i) Information 
regarding any notice from an RMR Unit requesting a change of Condition; 
(ii) the date the chosen Condition will begin; and (iii) if the change 
is from Condition 2, the applicable level of Fixed Option Payment. The 
ISO states it has provided notice of the changes of condition described 
in the informational filing (subject to the applicable Non-Disclosure 
and Confidentiality Agreement in the RMR Contract) to the designated 
RMR contact persons at the California Agencies, the applicable 
Responsible Utilities, and the relevant RMR Owners.
    Comment Date: January 2, 2004.

19. PacifiCorp

[Docket No. ER04-287-000]

    Take notice that on December 12, 2003, pursuant to section 205 of 
the Federal Power Act, 16 U.S.C. 824d, and part 35 of the Federal 
Energy Regulatory Commission's regulations, 18 CFR 35, PacifiCorp 
tendered for filing the following jurisdictional agreements:
    1. Generation Interconnection Agreement dated December 14, 2001, 
between PacifiCorp and FPL Energy Vansycle, L.L.C. (Interconnection 
Agreement); and
    2. Letter Agreement dated January 22, 2001, between PacifiCorp and 
FPL Energy Vansycle, L.L.C. and related invoice dated December 10, 2001 
(collectively, the Letter Agreement).
    PacifiCorp states that the Interconnection Agreement and Letter 
Agreement are being filed as service agreements under PacifiCorp's Open 
Access Transmission Tariff (FERC Electric Tariff, Fourth Revised Volume 
No. 11), and are designated as Service Agreement Nos. 276 and 277, 
respectively.
    Comment Date: January 2, 2004.

20. The Cincinnati Gas & Electric Company

[Docket No. ER04-288-000]

    Take notice that on December 15, 2003, The Cincinnati Gas & 
Electric Company (CG&E) filed a short-form market-based rate tariff. 
CG&E requests waiver of the Commission's prior notice requirements to 
allow the proposed tariff to become effective on or before January 31, 
2004.
    Comment Date: January 5, 2004.

21. DJGW, LLC

[Docket No. ER04-289-000]

    Take notice that on December 15, 2003, DJGW, LLC (DJGW) tendered 
for filing a Petition for Acceptance of Initial Rate Schedule, Rate 
Schedule FERC No. 1; the grant of certain blanket approvals; and the 
waiver of certain Commission regulations.
    Comment Date: January 5, 2004.

22. Meyersdale Windpower LLC

[Docket No. ER04-290-000]

    Take notice that on December 15, 2003, Meyersdale Windpower LLC 
tendered for filing an application for authorization to sell energy and 
capacity at market-based rates pursuant to section 205 of the Federal 
Power Act.
    Comment Date: January 5, 2004.

23. Northeast Utilities Service Company, Holyoke Water Power Company, 
and Holyoke Power and Electric Company

[Docket No. ER04-291-000]

    Take notice that on December 15, 2003, Northeast Utilities Service 
Company (NUSCO) on behalf of its affiliates, Holyoke Water Power 
Company (HWP) and Holyoke Power and Electric Company (HP&E), tendered 
for filing: (1) A revised rate schedule sheet extending the term of an 
agreement between HWP and HP&E for the sale of HWP's power output from 
Mt. Tom power plant; and (2) a revised rate schedule sheet extending 
the term of an agreement between HP&E and Select Energy, Inc. for the 
sale of HP&E's power entitlement to the output of Mt. Tom. NUSCO 
requests an effective date of December 31, 2003, or such other earliest 
date as permitted by the Commission.
    NUSCO states that a copy of this filing was mailed to Holyoke Water 
Power Company, Holyoke Power and Electric Company and Select Energy, 
Inc.
    Comment Date: January 5, 2004.

24. Bravo Energy Resources, LLC.

[Docket No. ER04-292-000]

    Take notice that on December 15, 2003, Bravo Energy Resources, LLC

[[Page 62]]

(Bravo) petitioned the Commission for acceptance of Bravo Rate Schedule 
FERC Electric Tariff Original Volume No. 1; the granting of certain 
blanket approvals, including the authority to sell electricity at 
market-based rates; and the waiver of certain Commission regulations.
    Bravo states that it intends to engage in wholesale electric power 
and energy purchases and sales as a marketer. Bravo is not in the 
business of generating or transmitting electric power.
    Comment Date: January 5, 2003.

Standard Paragraph

    Any person desiring to intervene or to protest this filing should 
file with the Federal Energy Regulatory Commission, 888 First Street, 
NE., Washington, DC 20426, in accordance with rules 211 and 214 of the 
Commission's rules of practice and procedure (18 CFR 385.211 and 
385.214). Protests will be considered by the Commission in determining 
the appropriate action to be taken, but will not serve to make 
protestants parties to the proceeding. Any person wishing to become a 
party must file a motion to intervene. All such motions or protests 
should be filed on or before the comment date, and, to the extent 
applicable, must be served on the applicant and on any other person 
designated on the official service list. This filing is available for 
review at the Commission or may be viewed on the Commission's Web site 
at http://www.ferc.gov, using the ``FERRIS'' link. Enter the docket 

number excluding the last three digits in the docket number filed to 
access the document. For assistance, call (202) 502-8222 or TTY, (202) 
502-8659. Protests and interventions may be filed electronically via 
the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the 
instructions on the Commission's web site under the ``e-Filing'' link. 
The Commission strongly encourages electronic filings.

Magalie R. Salas,
Secretary.
 [FR Doc. E3-00665 Filed 12-31-03; 8:45 am]