[Federal Register: July 12, 2004 (Volume 69, Number 132)]
[Notices]
[Page 41801]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr12jy04-35]
[[Page 41801]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 199-203]
South Carolina Public Service Authority; Notice of Availability
of Environmental Assessment
June 29, 2004.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission regulations, 18 CFR part
380 (Order No. 486, 52 FR 47897), the Office of Energy Projects staff
(staff) reviewed the request to use Santee-Cooper Project lands and
waters in the development of a Lake Marion Regional Water System
Project. The project is located on the Santee and Cooper Rivers (Lake
Marion and Lake Moultrie) in Berkeley, Calhoun, Clarendon, Orangeburg,
and Sumter Counties, South Carolina. Staff prepared an environmental
assessment (EA) for the application and analyzed the effects of
structures to be constructed on project lands, as well as the water
withdrawal from Lake Marion. Staff concluded that the licensee's
proposal would not constitute a major federal action significantly
affecting the quality of the human environment.
A copy of the EA is available for review at the Commission in the
Public Reference Room, located at 888 First Street, NE., Room 2A,
Washington, DC 20426 or may be viewed on the Commission's Web site at
http://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the Commission order and attached EA, issued June 28, 2004 (107
FERC ] 62,285). For assistance, contact FERC On-line Support at
FERCOnlineSupport@ferc.gov or call toll-free (866) 208-3676 for TTY,
call (202) 502-8659.
Linda Mitry,
Acting Secretary.
[FR Doc. E4-1517 Filed 7-9-04; 8:45 am]
BILLING CODE 6717-01-P