[Federal Register: October 18, 2004 (Volume 69, Number 200)]
[Notices]
[Page 61366-61369]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr18oc04-55]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EC05-2-000, et al.]
American Electric Power Service Corporation, et al.; Electric
Rate and Corporate Filings
October 8, 2004.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. American Electric Power Service Corporation
[Docket No. EC05-2-000]
Take notice that on October 7, 2004, American Electric Power
Service Corporation, (AEP) on behalf of its electric utility
subsidiary, AEP Texas Central Company, formerly known as Central Power
and Light Company (TCC), submitted an application
[[Page 61367]]
pursuant to section 203 of the Federal Power Act for authorization of a
disposition of jurisdictional facilities whereby TCC seeks
authorization to transfer certain jurisdictional facilities associated
with TCC's 25.2 percent undivided ownership interest in the 2,500 MW
South Texas Project nuclear plant (TCC Interest). AEP states that TCC
proposes to sell 13.2 percent of the TCC Interest to Texas Genco, L.P.
and 12 percent of the TCC Interest to City of San Antonio acting by and
through the City Public Service Board of San Antonio.
Comment Date: 5 p.m. Eastern Time on October 28, 2004.
2. Sheboygan Power, LLC
[Docket No. EG05-3-000]
Take notice that on October 6, 2004, Sheboygan Power, LLC
(Sheboygan Power) filed an application for a determination that it is
an exempt wholesale generator. Sheboygan Power states that it will
construct and own a natural gas-fired generating facility, located in
the County of Sheboygan, Wisconsin, consisting of three gas fired
turbine generators to provide approximately 450 MW net electrical
output, with only two turbine generators to be placed in service
initially, and to provide approximately 300 MW net electrical output.
Comment Date: 5 p.m. Eastern Time on October 26, 2004.
3. Cargill-Alliant, LLC
[Docket No. ER97-4273-013]
Take notice that on October 6, 2004, Cargill-Alliance, LLC
(Cargill-Alliant) Incorporated, submitted a compliance filing pursuant
to the Commission's Letter Order issued August 17, 2004 in Docket No.
ER97-4273-012.
Comment Date: 5 p.m. Eastern Time on October 27, 2004.
4. AES Huntington Beach, L.L.C.
[Docket No. ER98-2184-007]
Take notice that on October 5, 2004, AES Huntington Beach, L.L.C.
(AES Huntington Beach) submitted for filing its triennial market power
update in compliance with Acadia Power Partners, LLC, et al., 107 FERC
] 61,168 (2004). As part of this triennial market power update, AES
Huntington Beach also submitted for filing amendments to its market-
based rate tariff implementing six (6) new market behavior rules
adopted by the Commission in Investigation of Terms and Conditions of
Public Utility Market-Based Rate Authorization, 105 FERC 61,218 (2003).
AES Huntington Beach also submitted for approval its second revision to
FERC Electric Tariff, Original Volume No. 1, and its first revision to
its Statement of Policy and Code of Conduct.
Comment Date: 5 p.m. Eastern Time on October 26, 2004.
5. AES Alamitos, L.L.C.
[Docket No. ER98-2185-007]
Take notice that on October 5, 2004, AES Alamitos (AES Alamitos)
submitted for filing its triennial market power update in compliance
with Acadia Power Partners, LLC, et al., 107 FERC ] 61,168 (2004). As
part of this triennial market power update, AES Alamitos also submitted
for filing amendments to its market-based rate tariff implementing six
(6) new market behavior rules adopted by the Commission in
Investigation of Terms and Conditions of Public Utility Market-Based
Rate Authorization, 105 FERC 61,218 (2003). AES Alamitos also submitted
for approval its second revision to FERC Electric Tariff, Original
Volume No. 1, and its first revision to its Statement of Policy and
Code of Conduct.
Comment Date: 5 p.m. Eastern Time on October 26, 2004.
6. AES Redondo Beach, L.L.C.
[Docket No. ER98-2186-007]
Take notice that on October 5, 2004, AES Redondo Beach, L.L.C. (AES
Redondo Beach) submitted for filing its triennial market power update
in compliance with Acadia Power Partners, LLC, et al., 107 FERC ]
61,168 (2004). As part of this triennial market power update, AES
Redondo Beach also submitted for filing amendments to its market-based
rate tariff implementing six (6) new market behavior rules adopted by
the Commission in an order issued November 17, 2003, in Docket No.
EL01-118-000, Investigation of Terms and Conditions of Public Utility
Market-Based Rate Authorization, 105 FERC 61,218 (2003). AES Redondo
Beach also submitted for approval its second revision to FERC Electric
Tariff, Original Volume No. 1, and its first revision to its Statement
of Policy and Code of Conduct.
Comment Date: 5 p.m. Eastern Time on October 26, 2004.
7. GWF Energy LLC
[Docket No. ER01-2233-003]
Take notice that, on October 4, 2004, GWF Energy LLC (GWF) amended
its compliance filing submitted on July 19, 2004, pursuant to the
Commission's letter order issued July 18, 2004 in GWF Energy LLC,
Docket No. ER01-2233-000 and pursuant to Investigation of Terms and
Conditions of Public Utility Market-Based Rate Authorizations, 105 FERC
] 61,218 (2003). GWF states that the amendment to the compliance filing
consists of a market share and pivotal supplier analysis in support of
its updated market power analysis and updated tariff sheets.
GWF states that copies of the filing were served on parties on the
official service list in the above-captioned proceeding.
Comment Date: 5 p.m. Eastern Time on October 25, 2004.
8. PJM Interconnection, L.L.C.
[Docket No. ER03-262-000]
Take notice that on October 4, 2004, PJM Interconnection, L.L.C.
(PJM) submitted its compliance with the Commission's August 4, 2004
order in Docket No. ER02-262-002, et al., 108 FERC ] 61,140, concerning
the collection of Commission annual charges billed to PJM associated
with loads in the Commonwealth Edison Company and American Electric
Power East Operating Companies transmission zones.
PJM states that copies of the filing were served on all persons on
the Commission's official service list for this proceeding.
Comment Date: 5 p.m. Eastern Time on October 25, 2004.
9. New York Independent System Operator, Inc.
[Docket No. ER04-449-004]
Take notice that on October 5, 2004, the New York Independent
System Operator, Inc. (NYISO) and the New York Transmission Owners
filed a joint Compliance Filing in connection with the Commission's
August 6, 2004 Order in Docket No. ER04-449-000, et al.
NYISO states that it has served a copy of this filing on all
parties in Docket No. ER04-449-000. The NYISO requests a waiver of the
requirements of 18 CFR 385.2010 so as to permit it to electronically
serve a copy of this filing on the official representatives of each of
its customers, on each participant in its stakeholder committees, on
the New York State Public Service Commission and on the electric
utility regulatory agencies in New Jersey and Pennsylvania.
Comment Date: 5 p.m. Eastern Time on October 26, 2004.
10. Midwest Independent Transmission System Operator, Inc.
[Docket No. ER04-691-007 and EL04-104-000]
Take notice that on October 5, 2004, the Midwest Independent
Transmission
[[Page 61368]]
System Operator, Inc. (Midwest ISO) submitted a compliance filing
pursuant to the Commission's Order issued August 6, 2004, Midwest
Independent Transmission System Operator, Inc., 108 FERC ] 61,163
(2004).
Midwest ISO has also requested a waiver of the service requirements
set forth in 18 CFR 385.2010. The Midwest ISO has electronically served
a copy of this filing, with its attachments, upon all Midwest ISO
Members, Member representatives of Transmission Owners and Non-
Transmission Owners, the Midwest ISO Advisory Committee participants,
Policy Subcommittee participants, as well as all state commissions
within the region. In addition, the filing has been electronically
posted on the Midwest ISO's Web site at http://www.midwestiso.org under
the heading ``Filings to FERC'' for other interested parties in this
matter. The Midwest ISO will provide hard copies to any interested
party upon request.
Comment Date: 5 p.m. Eastern Time on October 26, 2004.
11. Vermont Electric Cooperative, Inc.
[Docket No. ER04-694-003]
Take notice that on October 6, 2004, Vermont Electric Cooperative,
Inc. (VEC) submitted its refund compliance report pursuant to the
Commission's September 7, 2004 Order Accepting Market-Based Tariff in
the Docket No. ER04-694-000, et al., Vermont Electric Cooperative,
Inc., 108 FERC ] 61,223 (2004).
Comment Date: 5 p.m. Eastern Time on October 27, 2004.
12. The Detroit Edison Company, DTE East China, LLC, DTE River Rouge
No. 1 LLC
[Docket No. ER04-948-002]
Take notice that on October 4, 2004, DTE East China, LLC, DTE River
Rouge No. 1, LLC and the Detroit Edison Company (Applicants) submitted
a compliance filing pursuant to a Commission order issued on July 16,
2004 in Docket No. ER04-948-000.
Applicants state that copy of the filing was served on parties on
the official service list in the above-captioned proceeding.
Comment Date: 5 p.m. Eastern Time on October 26, 2004.
13. PJM Interconnection, L.L.C.
[Docket No. ER04-1123-001]
Take notice that on October 5, 2004, PJM Interconnection, L.L.C.
(PJM), amended its August 12, 2004 filing in Docket No. ER04-123-000 by
submitting an amended executed interim interconnection service
agreement among PJM, Wind Park Bear Creek, L.L.C., and PPL Electric
Utilities Corporation (Wind Park ISA) and to identify differences
between the Wind Park ISA and the form of interim interconnection
service agreement in Attachment O-1 and form of interconnection service
agreement in Attachment O of the PJM Open Access Transmission Tariff as
modified by tariff revisions accepted by the Commission in PJM
Interconnection, L.L.C., 108 FERC ] 61,025 (2004).
PJM states that copies of this filing were served upon the parties
to the agreement and the state regulatory commissions within the PJM
region, and all parties on the official service list compiled by the
Secretary in this proceeding.
Comment Date: 5 p.m. Eastern Time on October 26, 2004.
14. Consolidated Edison Energy, Inc.
[Docket No. ER04-1196-001]
Take notice that on October 1, 2004, Consolidated Edison Energy,
Inc. (CEE), filed an amendment to its filing submitted on August 18,
2004 in Docket No. ER04-1196-000. First Revised Sheet No. 1 of CEE's
Market-Based Rate Tariff, First Revised Volume No. 1, superceding
Original Volume No. 1, as well as the red-lined version of that Tariff
Sheet.
Comment Date: 5 p.m. Eastern Time on October 22, 2004.
15. Boston Edison Company
[Docket No. ER05-15-000]
Take notice that on October 4, 2004, Boston Edison Company (Boston
Edison) tendered for filing First Revised Rate Schedule FERC No. 179
(First Revised Rate Schedule) between Boston Edison and the Town of
Braintree Electric Light Department (Braintree). Boston Edison requests
an effective date of March 1, 2003.
Boston Edison states that copies of the filing were served upon
Braintree and the Department of Telecommunications and Energy for the
Commonwealth of Massachusetts.
Comment Date: 5 p.m. Eastern Time on October 25, 2004.
16. American Transmission Systems, Incorporated
[Docket No. ER05-16-000]
Take notice that on October 4, 2004, American Transmission Systems,
Incorporated (ATSI) tendered for filing a proposed Schedule 2.1--
Revenue Requirement for Reactive Power. ATSI stated that Schedule 2.1,
which allows collection of revenues associated with the supply of
Reactive Supply Service within the FirstEnergy Control Area by multiple
generation suppliers and the distribution of all revenues collected in
a fair and equitable manner, is being modified to accommodate a new
revenue requirement for the supply of Reactive Supply Service by
FirstEnergy Solutions Corp. ATSI requests an effective date of October
15, 2004.
Comment Date: 5 p.m. Eastern Time on October 25, 2004.
17. Trans-Elect NTD Path 15, LLC
[Docket No. ER05-17-000]
Take notice that on October 4, 2004, Trans-Elect NTD Path 15 LLC
(NTD Path 15) submits for filing the materials necessary under FPA
section 205 to establish its transmission revenue requirement. In
addition, NTD Path 15 submits its FERC TO Tariff as a participating
transmission owner in California Independent System Operator
Corporation. NTD Path 15 requests an effective date of December 4,
2004.
NTD Path 15 states that copies of this filing were served on all
interested parties.
Comment Date: 5 p.m. Eastern Time on October 25, 2004.
18. Appalachian Power Company
[Docket No. ER05-19-000]
Take notice that on October 5, 2004, Appalachian Power Company
(APCo) tendered for filing with the Commission thirteen Notices of
Cancellation, designated as indicated below, that cancel the Electric
Service Agreements/Rate Schedules under which APCo currently provides
service to the following wholesale customers:
Notice of Cancellation
------------------------------------------------------------------------
Customer Rate schedule designation
------------------------------------------------------------------------
Black Diamond Power Company (Elkhurst).... First Revised Rate Schedule--
FERC No. 103
Black Diamond Power Company (East First Revised Rate Schedule--
Hartland). FERC No. 104
Black Diamond Power Company (Sophia)...... First Revised Rate Schedule--
FERC No. 105
Elk Power Company (Clay).................. First Revised Rate Schedule--
FERC No. 106
Elkhorn Public Service Company (Elkhorn).. First Revised Rate Schedule--
FERC No. 107
Elkhorn Public Service Company (Crozier First Revised Rate Schedule--
4). FERC No. 108
Kimball Light & Water Company............. First Revised Rate Schedule--
FERC No. 109
[[Page 61369]]
United Light & Power Company.............. First Revised Rate Schedule--
FERC No. 110
Union Power Company (Rhodell)............. First Revised Rate Schedule--
FERC No. 111
Union Power Company (Mullens and Pierpont) First Revised Rate Schedule--
FERC No. 112
War Light & Power Company................. First Revised Rate Schedule--
FERC No. 113
Elk Power Company (Reed's Fork)........... First Revised Rate Schedule--
FERC No. 114
------------------------------------------------------------------------
APCo requests that the Notices of Cancellation be made effective
December 1, 2004.
APCo states that a copy of its filing was served upon the Public
Service Commission of West Virginia and the customers set out above.
Comment Date: 5 p.m. Eastern Time on October 26, 2004.
19. Florida Power & Light Company
[Docket No. ER05-21-000]
Take notice that on October 5, 2004, Florida Power & Light Company
(FPL) submitted Amendment No. 3 to the St. Lucie Nuclear Reliability
Exchange Agreement between Florida Power & Light Company and Florida
Municipal Power Agency. FPL states that the revisions set forth in
Amendment No. 3 to the St. Lucie Nuclear Reliability Exchange Agreement
between Florida Power & Light Company and Florida Municipal Power
Agency reflect the clarification of the treatment of costs associated
with pension benefits and post-retirement benefits other than pensions
for the period 2003 and beyond.
FPL states that copies of the filing were served upon Florida
Municipal Power Agency.
Comment Date: 5 p.m. Eastern Time on October 26, 2004.
20. Florida Power & Light Company
[Docket No. ER05-22-000]
Take notice that on October 5, 2004, Florida Power & Light Company
(FPL) submitted Amendment No. 2 to the St. Lucie Nuclear Reliability
Exchange Agreement between Florida Power & Light Company and Orlando
Utilities Commission. FPL states that the revisions set forth in
Amendment No. 2 to the St. Lucie Nuclear Reliability Exchange Agreement
between Florida Power & Light Company and Orlando Utilities Commission
reflect the clarification of the treatment of costs associated with
pension benefits and post-retirement benefits other than pensions for
the period 2003 and beyond.
FPL states that the copies of the filing were served upon Orlando
Utilities Commission.
Comment Date: 5 p.m. Eastern Time on October 26, 2004.
21. AES Placerita, Inc.
[Docket No. ER05-23-000 and ER00-33-005]
Take notice that on October 5, 2004, AES Placerita, Inc.
(Placerita) submitted its triennial market power update pursuant to the
Commission's Order in Docket No. ER0033-000 and Acadia Power Partners,
LLC, et al., 107 FERC ] 61,168 (2004). In addition, pursuant to section
205 of the Federal Power Act, Placerita submitted its third revision to
FERC Electric Rate Schedule, Original Volume No. 1, and its second
revision to its code of conduct reflecting new corporate affiliations.
Comment Date: 5 p.m. Eastern Time on October 26, 2004.
22. Virginia Electric and Power Company
[Docket No. ER05-24-000]
Take notice that on October 6, 2004, Virginia Electric and Power
Company (Dominion) tendered for filing a new Appendix E-1 for the
Service Agreement under its open access transmission tariff, FERC
Electric Tariff Second Revised Volume No. 5. Dominion states that the
service agreement is Dominion's Service Agreement for Network
Integration Transmission Service and Network Operating Agreement with
the North Carolina Electric Membership Corporation (NCEMC). Dominion
also states that the revised service agreement adds charges to
reimburse Dominion for costs associated with providing a new Aulander
Delivery Point for Roanoke Electric Cooperative. Dominion requests an
effective date of October 7, 2004.
Dominion states that copies of the filing were served upon the
NCEMC, the North Carolina Utilities Commission and the Virginia State
Corporation Commission.
Comment Date: 5 p.m. Eastern Time on October 26, 2004.
23. Roger Agnelli
[Docket No. ID-4167-000]
Take notice that on October 1, 2004, Roger Agnelli filed, tendered
for filing an Application for Authority to Hold Interlocking Positions
under section 305 (b) of the Federal Power Act, 16 U.S.C. 825d (b)
(2000), and Part 45 of the Commission's Regulations.
Comment Date: 5 p.m. Eastern Time on November 1, 2004.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov.
Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, N.E., Washington, DC
20426.
This filing is accessible on-line at http://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E4-2663 Filed 10-15-04; 8:45 am]
BILLING CODE 6717-01-P