[Federal Register: October 18, 2004 (Volume 69, Number 200)]
[Notices]               
[Page 61366-61369]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr18oc04-55]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EC05-2-000, et al.]

 
American Electric Power Service Corporation, et al.; Electric 
Rate and Corporate Filings

October 8, 2004.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

1. American Electric Power Service Corporation

[Docket No. EC05-2-000]

    Take notice that on October 7, 2004, American Electric Power 
Service Corporation, (AEP) on behalf of its electric utility 
subsidiary, AEP Texas Central Company, formerly known as Central Power 
and Light Company (TCC), submitted an application

[[Page 61367]]

pursuant to section 203 of the Federal Power Act for authorization of a 
disposition of jurisdictional facilities whereby TCC seeks 
authorization to transfer certain jurisdictional facilities associated 
with TCC's 25.2 percent undivided ownership interest in the 2,500 MW 
South Texas Project nuclear plant (TCC Interest). AEP states that TCC 
proposes to sell 13.2 percent of the TCC Interest to Texas Genco, L.P. 
and 12 percent of the TCC Interest to City of San Antonio acting by and 
through the City Public Service Board of San Antonio.
    Comment Date: 5 p.m. Eastern Time on October 28, 2004.

2. Sheboygan Power, LLC

[Docket No. EG05-3-000]

    Take notice that on October 6, 2004, Sheboygan Power, LLC 
(Sheboygan Power) filed an application for a determination that it is 
an exempt wholesale generator. Sheboygan Power states that it will 
construct and own a natural gas-fired generating facility, located in 
the County of Sheboygan, Wisconsin, consisting of three gas fired 
turbine generators to provide approximately 450 MW net electrical 
output, with only two turbine generators to be placed in service 
initially, and to provide approximately 300 MW net electrical output.
    Comment Date: 5 p.m. Eastern Time on October 26, 2004.

3. Cargill-Alliant, LLC

[Docket No. ER97-4273-013]

    Take notice that on October 6, 2004, Cargill-Alliance, LLC 
(Cargill-Alliant) Incorporated, submitted a compliance filing pursuant 
to the Commission's Letter Order issued August 17, 2004 in Docket No. 
ER97-4273-012.
    Comment Date: 5 p.m. Eastern Time on October 27, 2004.

4. AES Huntington Beach, L.L.C.

[Docket No. ER98-2184-007]

    Take notice that on October 5, 2004, AES Huntington Beach, L.L.C. 
(AES Huntington Beach) submitted for filing its triennial market power 
update in compliance with Acadia Power Partners, LLC, et al., 107 FERC 
] 61,168 (2004). As part of this triennial market power update, AES 
Huntington Beach also submitted for filing amendments to its market-
based rate tariff implementing six (6) new market behavior rules 
adopted by the Commission in Investigation of Terms and Conditions of 
Public Utility Market-Based Rate Authorization, 105 FERC 61,218 (2003). 
AES Huntington Beach also submitted for approval its second revision to 
FERC Electric Tariff, Original Volume No. 1, and its first revision to 
its Statement of Policy and Code of Conduct.
    Comment Date: 5 p.m. Eastern Time on October 26, 2004.

5. AES Alamitos, L.L.C.

[Docket No. ER98-2185-007]

    Take notice that on October 5, 2004, AES Alamitos (AES Alamitos) 
submitted for filing its triennial market power update in compliance 
with Acadia Power Partners, LLC, et al., 107 FERC ] 61,168 (2004). As 
part of this triennial market power update, AES Alamitos also submitted 
for filing amendments to its market-based rate tariff implementing six 
(6) new market behavior rules adopted by the Commission in 
Investigation of Terms and Conditions of Public Utility Market-Based 
Rate Authorization, 105 FERC 61,218 (2003). AES Alamitos also submitted 
for approval its second revision to FERC Electric Tariff, Original 
Volume No. 1, and its first revision to its Statement of Policy and 
Code of Conduct.
    Comment Date: 5 p.m. Eastern Time on October 26, 2004.

6. AES Redondo Beach, L.L.C.

[Docket No. ER98-2186-007]

    Take notice that on October 5, 2004, AES Redondo Beach, L.L.C. (AES 
Redondo Beach) submitted for filing its triennial market power update 
in compliance with Acadia Power Partners, LLC, et al., 107 FERC ] 
61,168 (2004). As part of this triennial market power update, AES 
Redondo Beach also submitted for filing amendments to its market-based 
rate tariff implementing six (6) new market behavior rules adopted by 
the Commission in an order issued November 17, 2003, in Docket No. 
EL01-118-000, Investigation of Terms and Conditions of Public Utility 
Market-Based Rate Authorization, 105 FERC 61,218 (2003). AES Redondo 
Beach also submitted for approval its second revision to FERC Electric 
Tariff, Original Volume No. 1, and its first revision to its Statement 
of Policy and Code of Conduct.
    Comment Date: 5 p.m. Eastern Time on October 26, 2004.

7. GWF Energy LLC

[Docket No. ER01-2233-003]

    Take notice that, on October 4, 2004, GWF Energy LLC (GWF) amended 
its compliance filing submitted on July 19, 2004, pursuant to the 
Commission's letter order issued July 18, 2004 in GWF Energy LLC, 
Docket No. ER01-2233-000 and pursuant to Investigation of Terms and 
Conditions of Public Utility Market-Based Rate Authorizations, 105 FERC 
] 61,218 (2003). GWF states that the amendment to the compliance filing 
consists of a market share and pivotal supplier analysis in support of 
its updated market power analysis and updated tariff sheets.
    GWF states that copies of the filing were served on parties on the 
official service list in the above-captioned proceeding.
    Comment Date: 5 p.m. Eastern Time on October 25, 2004.

8. PJM Interconnection, L.L.C.

[Docket No. ER03-262-000]

    Take notice that on October 4, 2004, PJM Interconnection, L.L.C. 
(PJM) submitted its compliance with the Commission's August 4, 2004 
order in Docket No. ER02-262-002, et al., 108 FERC ] 61,140, concerning 
the collection of Commission annual charges billed to PJM associated 
with loads in the Commonwealth Edison Company and American Electric 
Power East Operating Companies transmission zones.
    PJM states that copies of the filing were served on all persons on 
the Commission's official service list for this proceeding.
    Comment Date: 5 p.m. Eastern Time on October 25, 2004.

9. New York Independent System Operator, Inc.

[Docket No. ER04-449-004]

    Take notice that on October 5, 2004, the New York Independent 
System Operator, Inc. (NYISO) and the New York Transmission Owners 
filed a joint Compliance Filing in connection with the Commission's 
August 6, 2004 Order in Docket No. ER04-449-000, et al.
    NYISO states that it has served a copy of this filing on all 
parties in Docket No. ER04-449-000. The NYISO requests a waiver of the 
requirements of 18 CFR 385.2010 so as to permit it to electronically 
serve a copy of this filing on the official representatives of each of 
its customers, on each participant in its stakeholder committees, on 
the New York State Public Service Commission and on the electric 
utility regulatory agencies in New Jersey and Pennsylvania.
    Comment Date: 5 p.m. Eastern Time on October 26, 2004.

10. Midwest Independent Transmission System Operator, Inc.

[Docket No. ER04-691-007 and EL04-104-000]

    Take notice that on October 5, 2004, the Midwest Independent 
Transmission

[[Page 61368]]

System Operator, Inc. (Midwest ISO) submitted a compliance filing 
pursuant to the Commission's Order issued August 6, 2004, Midwest 
Independent Transmission System Operator, Inc., 108 FERC ] 61,163 
(2004).
    Midwest ISO has also requested a waiver of the service requirements 
set forth in 18 CFR 385.2010. The Midwest ISO has electronically served 
a copy of this filing, with its attachments, upon all Midwest ISO 
Members, Member representatives of Transmission Owners and Non-
Transmission Owners, the Midwest ISO Advisory Committee participants, 
Policy Subcommittee participants, as well as all state commissions 
within the region. In addition, the filing has been electronically 
posted on the Midwest ISO's Web site at http://www.midwestiso.org under 

the heading ``Filings to FERC'' for other interested parties in this 
matter. The Midwest ISO will provide hard copies to any interested 
party upon request.
    Comment Date: 5 p.m. Eastern Time on October 26, 2004.

11. Vermont Electric Cooperative, Inc.

[Docket No. ER04-694-003]

    Take notice that on October 6, 2004, Vermont Electric Cooperative, 
Inc. (VEC) submitted its refund compliance report pursuant to the 
Commission's September 7, 2004 Order Accepting Market-Based Tariff in 
the Docket No. ER04-694-000, et al., Vermont Electric Cooperative, 
Inc., 108 FERC ] 61,223 (2004).
    Comment Date: 5 p.m. Eastern Time on October 27, 2004.

12. The Detroit Edison Company, DTE East China, LLC, DTE River Rouge 
No. 1 LLC

[Docket No. ER04-948-002]

    Take notice that on October 4, 2004, DTE East China, LLC, DTE River 
Rouge No. 1, LLC and the Detroit Edison Company (Applicants) submitted 
a compliance filing pursuant to a Commission order issued on July 16, 
2004 in Docket No. ER04-948-000.
    Applicants state that copy of the filing was served on parties on 
the official service list in the above-captioned proceeding.
    Comment Date: 5 p.m. Eastern Time on October 26, 2004.

13. PJM Interconnection, L.L.C.

[Docket No. ER04-1123-001]

    Take notice that on October 5, 2004, PJM Interconnection, L.L.C. 
(PJM), amended its August 12, 2004 filing in Docket No. ER04-123-000 by 
submitting an amended executed interim interconnection service 
agreement among PJM, Wind Park Bear Creek, L.L.C., and PPL Electric 
Utilities Corporation (Wind Park ISA) and to identify differences 
between the Wind Park ISA and the form of interim interconnection 
service agreement in Attachment O-1 and form of interconnection service 
agreement in Attachment O of the PJM Open Access Transmission Tariff as 
modified by tariff revisions accepted by the Commission in PJM 
Interconnection, L.L.C., 108 FERC ] 61,025 (2004).
    PJM states that copies of this filing were served upon the parties 
to the agreement and the state regulatory commissions within the PJM 
region, and all parties on the official service list compiled by the 
Secretary in this proceeding.
    Comment Date: 5 p.m. Eastern Time on October 26, 2004.

14. Consolidated Edison Energy, Inc.

[Docket No. ER04-1196-001]

    Take notice that on October 1, 2004, Consolidated Edison Energy, 
Inc. (CEE), filed an amendment to its filing submitted on August 18, 
2004 in Docket No. ER04-1196-000. First Revised Sheet No. 1 of CEE's 
Market-Based Rate Tariff, First Revised Volume No. 1, superceding 
Original Volume No. 1, as well as the red-lined version of that Tariff 
Sheet.
    Comment Date: 5 p.m. Eastern Time on October 22, 2004.

15. Boston Edison Company

[Docket No. ER05-15-000]

    Take notice that on October 4, 2004, Boston Edison Company (Boston 
Edison) tendered for filing First Revised Rate Schedule FERC No. 179 
(First Revised Rate Schedule) between Boston Edison and the Town of 
Braintree Electric Light Department (Braintree). Boston Edison requests 
an effective date of March 1, 2003.
    Boston Edison states that copies of the filing were served upon 
Braintree and the Department of Telecommunications and Energy for the 
Commonwealth of Massachusetts.
    Comment Date: 5 p.m. Eastern Time on October 25, 2004.

16. American Transmission Systems, Incorporated

[Docket No. ER05-16-000]

    Take notice that on October 4, 2004, American Transmission Systems, 
Incorporated (ATSI) tendered for filing a proposed Schedule 2.1--
Revenue Requirement for Reactive Power. ATSI stated that Schedule 2.1, 
which allows collection of revenues associated with the supply of 
Reactive Supply Service within the FirstEnergy Control Area by multiple 
generation suppliers and the distribution of all revenues collected in 
a fair and equitable manner, is being modified to accommodate a new 
revenue requirement for the supply of Reactive Supply Service by 
FirstEnergy Solutions Corp. ATSI requests an effective date of October 
15, 2004.
    Comment Date: 5 p.m. Eastern Time on October 25, 2004.

17. Trans-Elect NTD Path 15, LLC

[Docket No. ER05-17-000]

    Take notice that on October 4, 2004, Trans-Elect NTD Path 15 LLC 
(NTD Path 15) submits for filing the materials necessary under FPA 
section 205 to establish its transmission revenue requirement. In 
addition, NTD Path 15 submits its FERC TO Tariff as a participating 
transmission owner in California Independent System Operator 
Corporation. NTD Path 15 requests an effective date of December 4, 
2004.
    NTD Path 15 states that copies of this filing were served on all 
interested parties.
    Comment Date: 5 p.m. Eastern Time on October 25, 2004.

18. Appalachian Power Company

[Docket No. ER05-19-000]

    Take notice that on October 5, 2004, Appalachian Power Company 
(APCo) tendered for filing with the Commission thirteen Notices of 
Cancellation, designated as indicated below, that cancel the Electric 
Service Agreements/Rate Schedules under which APCo currently provides 
service to the following wholesale customers:

                         Notice of Cancellation
------------------------------------------------------------------------
                 Customer                    Rate schedule  designation
------------------------------------------------------------------------
Black Diamond Power Company (Elkhurst)....  First Revised Rate Schedule--
                                             FERC No. 103
Black Diamond Power Company (East           First Revised Rate Schedule--
 Hartland).                                  FERC No. 104
Black Diamond Power Company (Sophia)......  First Revised Rate Schedule--
                                             FERC No. 105
Elk Power Company (Clay)..................  First Revised Rate Schedule--
                                             FERC No. 106
Elkhorn Public Service Company (Elkhorn)..  First Revised Rate Schedule--
                                             FERC No. 107
Elkhorn Public Service Company (Crozier     First Revised Rate Schedule--
 4).                                FERC No. 108
Kimball Light & Water Company.............  First Revised Rate Schedule--
                                             FERC No. 109

[[Page 61369]]


United Light & Power Company..............  First Revised Rate Schedule--
                                             FERC No. 110
Union Power Company (Rhodell).............  First Revised Rate Schedule--
                                             FERC No. 111
Union Power Company (Mullens and Pierpont)  First Revised Rate Schedule--
                                             FERC No. 112
War Light & Power Company.................  First Revised Rate Schedule--
                                             FERC No. 113
Elk Power Company (Reed's Fork)...........  First Revised Rate Schedule--
                                             FERC No. 114
------------------------------------------------------------------------

    APCo requests that the Notices of Cancellation be made effective 
December 1, 2004.
    APCo states that a copy of its filing was served upon the Public 
Service Commission of West Virginia and the customers set out above.
    Comment Date: 5 p.m. Eastern Time on October 26, 2004.

19. Florida Power & Light Company

[Docket No. ER05-21-000]

    Take notice that on October 5, 2004, Florida Power & Light Company 
(FPL) submitted Amendment No. 3 to the St. Lucie Nuclear Reliability 
Exchange Agreement between Florida Power & Light Company and Florida 
Municipal Power Agency. FPL states that the revisions set forth in 
Amendment No. 3 to the St. Lucie Nuclear Reliability Exchange Agreement 
between Florida Power & Light Company and Florida Municipal Power 
Agency reflect the clarification of the treatment of costs associated 
with pension benefits and post-retirement benefits other than pensions 
for the period 2003 and beyond.
    FPL states that copies of the filing were served upon Florida 
Municipal Power Agency.
    Comment Date: 5 p.m. Eastern Time on October 26, 2004.

20. Florida Power & Light Company

[Docket No. ER05-22-000]

    Take notice that on October 5, 2004, Florida Power & Light Company 
(FPL) submitted Amendment No. 2 to the St. Lucie Nuclear Reliability 
Exchange Agreement between Florida Power & Light Company and Orlando 
Utilities Commission. FPL states that the revisions set forth in 
Amendment No. 2 to the St. Lucie Nuclear Reliability Exchange Agreement 
between Florida Power & Light Company and Orlando Utilities Commission 
reflect the clarification of the treatment of costs associated with 
pension benefits and post-retirement benefits other than pensions for 
the period 2003 and beyond.
    FPL states that the copies of the filing were served upon Orlando 
Utilities Commission.
    Comment Date: 5 p.m. Eastern Time on October 26, 2004.

21. AES Placerita, Inc.

[Docket No. ER05-23-000 and ER00-33-005]

    Take notice that on October 5, 2004, AES Placerita, Inc. 
(Placerita) submitted its triennial market power update pursuant to the 
Commission's Order in Docket No. ER0033-000 and Acadia Power Partners, 
LLC, et al., 107 FERC ] 61,168 (2004). In addition, pursuant to section 
205 of the Federal Power Act, Placerita submitted its third revision to 
FERC Electric Rate Schedule, Original Volume No. 1, and its second 
revision to its code of conduct reflecting new corporate affiliations.
    Comment Date: 5 p.m. Eastern Time on October 26, 2004.

22. Virginia Electric and Power Company

[Docket No. ER05-24-000]

    Take notice that on October 6, 2004, Virginia Electric and Power 
Company (Dominion) tendered for filing a new Appendix E-1 for the 
Service Agreement under its open access transmission tariff, FERC 
Electric Tariff Second Revised Volume No. 5. Dominion states that the 
service agreement is Dominion's Service Agreement for Network 
Integration Transmission Service and Network Operating Agreement with 
the North Carolina Electric Membership Corporation (NCEMC). Dominion 
also states that the revised service agreement adds charges to 
reimburse Dominion for costs associated with providing a new Aulander 
Delivery Point for Roanoke Electric Cooperative. Dominion requests an 
effective date of October 7, 2004.
    Dominion states that copies of the filing were served upon the 
NCEMC, the North Carolina Utilities Commission and the Virginia State 
Corporation Commission.
    Comment Date: 5 p.m. Eastern Time on October 26, 2004.

23. Roger Agnelli

[Docket No. ID-4167-000]

    Take notice that on October 1, 2004, Roger Agnelli filed, tendered 
for filing an Application for Authority to Hold Interlocking Positions 
under section 305 (b) of the Federal Power Act, 16 U.S.C. 825d (b) 
(2000), and Part 45 of the Commission's Regulations.
    Comment Date: 5 p.m. Eastern Time on November 1, 2004.

Standard Paragraph

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant and all parties to this proceeding.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov.
 Persons unable to file electronically should submit an 

original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, N.E., Washington, DC 
20426.
    This filing is accessible on-line at http://www.ferc.gov, using the 

``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 

TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
 [FR Doc. E4-2663 Filed 10-15-04; 8:45 am]

BILLING CODE 6717-01-P