[Federal Register: November 18, 2004 (Volume 69, Number 222)]
[Notices]
[Page 67566-67567]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr18no04-67]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER96-719-003, et al.]
MidAmerican Energy Company, et al.; Electric Rate and Corporate
Filings
November 9, 2004.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. MidAmerican Energy Company
[Docket No. ER96-719-003]
On October 29, 2004, MidAmerican Energy Company (MidAmerican)
submitted a compliance filing pursuant to the Commission's Order issued
July 12, 2005, in Docket Nos. ER96-719-000 and EL04-106-000, 108 FERC ]
61,043 (2004).
Comment Date: 5 p.m. eastern time on November 19, 2004.
2. Amerada Hess Corporation Hess Energy, Inc.
[Docket Nos. ER97-2153-014 and ER00-2181-002]
Take notice that on November 1, 2004, Amerada Hess Corporation and
Hess Energy, Inc. submitted for filing a Joint Triennial Updated Market
Analysis.
Comment Date: 5 p.m. eastern time on November 22, 2004.
3. NorthWestern Energy
[Docket No. ER04-1106-001]
Take notice that on November 3, 2004, NorthWestern Energy (NEW)
submitted, in response to the Commission's October 4, 2004, deficiency
letter, additional information regarding its August 9, 2004, filing in
Docket No. ER04-1106-000 of proposed modifications to its Open Access
Transmission Tariff which included changes to Schedule 4--Energy
Imbalance Service; a new Schedule 9--Generator Imbalance Service; and a
new Attachment J containing the pro forma
[[Page 67567]]
Large Generator Interconnection Procedures and Large Generator
Interconnection Agreement.
Comment Date: 5 p.m. eastern time on November 24, 2004.
4. Pacific Gas and Electric Company
[Docket No. ER05-130-000]
Take notice that on November 1, 2004, Pacific Gas and Electric
Company (PG&E) tendered for filing an unexecuted Interconnection
Agreement between PG&E and Trinity Public Utilities District. PG&E
requests an effective date of January 1, 2005.
Comment Date: 5 p.m. eastern time on November 22, 2004.
5. Pacific Gas and Electric Company
[Docket No. ER05-132-000]
Take notice that on November 1, 2004, Pacific Gas and Electric
Company (PG&E) tendered for filing Generator Interconnection Agreements
(GIA) between PG&E and each of the Western Area Power Administration's
generating plants (New Melones Power Plant, O(Neill (San Luis Forebay)
Pumping-Generating Plant, and Share of San Luis (William R. Gianelli)
Pumping-Generating Plant).
PG&E states that copies of this filing have been served upon the
Western Area Power Administration, the California Independent System
Operator Corporation and the California Public Utilities Commission.
Comment Date: 5 p.m. eastern time on November 22, 2004.
6. Metcalf Energy Center, LLC
[Docket No. ES05-10-000]
Take notice that on October 26, 2004, Metcalf Energy Center, LLC
(Metcalf) submitted an application pursuant to section 204 of the
Federal Power Act seeking authorization to issue debt securities in an
amount not to exceed $100 million.
Metcalf requests a waiver from the Commission's competitive bidding
and negotiated placement requirements at 18 CFR 34.2.
Comment Date: 5 p.m. eastern time on November 30, 2004.
7. Trans-Elect NTD Path 15, LLC
[Docket No. ES05-11-000]
Take notice that on October 29, 2004, Trans-Elect NTD Path 15, LLC
(NTD Path 15) requested authority to issue up to $40 million in
additional equity to NTD Holdings Path 15.
NTD Path 15 also requests a waiver from the Commission's
competitive bidding and negotiated placement requirements at 18 CFR
34.2.
Comment Date: 5 p.m. eastern time on November 30, 2004.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov.
Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at http://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E4-3205 Filed 11-17-04; 8:45 am]
BILLING CODE 6717-01-P