[Federal Register: November 19, 2004 (Volume 69, Number 223)]
[Notices]
[Page 67715-67718]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr19no04-43]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER95-1528-009, et al.]
Wisconsin Public Service Corporation, et al.; Electric Rate and
Corporate Filings
November 12, 2004.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. Wisconsin Public Service Corporation, Wisconsin Public Service
Corporation, WPS Power Development, Inc., and WPS Energy Services,
Inc., Mid-American Power, LLC, Sunbury Generation, LLC, WPS Canada
Generation, Inc. and WPS New England Generation, Inc., WPS Westwood
Generation, LLC, Advantage Energy Inc.
[Docket Nos. ER95-1528-0090, ER96-1088-034, ER96-1858-014, ER99-3420-
003, ER99-1936-002, ER01-1114-002, ER97-2758-009]
Take notice that on November 5, 2004, WPS Resources Corporation
(WPSR) on behalf of the following subsidiaries: Wisconsin Public
Service Corporation; WPS Energy Services, Inc.; WPS Power Development,
Inc.; Mid-American Power, LLC; Sunbury Generation, LLC; WPS Canada
Generation, Inc.; WPS New England Generation, Inc.; WPS Westwood
Generation, LLC, and Advantage Energy, Inc., tendered for filing tariff
sheets that modify their market-based rate tariffs to add the Market
Behavior Rules as adopted by the Commission. WPSR states that on
September 27, 2004, it submitted a request for three-year renewal of
the market-based rate authority for each of the subsidiaries. WPSR
requests an effective date of December 17, 2003.
WPSR states that a copy of the filing was served on all parties
listed on the Commission's official service lists in the referenced
proceedings and the Public Service Commission of Wisconsin.
[[Page 67716]]
Comment Date: 5 p.m. eastern time on November 26, 2004.
2. NewCorp Resources Electric Cooperative, Inc.
[Docket No. ER02-2001-000]
Take notice that on September 3, 2004, NewCorp Resources Electric
Cooperative, Inc. filed a Request for Waiver of Order No. 2001 Electric
Quarterly Reports Requirements.
Comment Date: 5 p.m. eastern time on December 3, 2004.
3. Midwest Independent Transmission System Operator, Inc.
[Docket No. ER04-458-004]
Take notice that on November 8, 2004, the Midwest Independent
Transmission System Operator, Inc., (Midwest ISO) submitted a
compliance filing pursuant to the Commission's Order issued July 8,
2004, in Docket Nos. ER04-458-000 and ER04-458-001, 108 FERC ] 61,027
(2004).
The Midwest ISO states that it has electronically served a copy of
this filing upon all Midwest ISO Members, Member representatives of
Transmission owners and Non-Transmission Owners, the Midwest ISO
Advisory Committee participants, as well as all State commissions
within the region. In addition, the Midwest ISO states that the filing
has been posted on the Midwest ISO Web site at http://www.midwestiso.org
under the heading ``Filings to FERC'' for other
interested parties. The Midwest ISO further states that it will provide
hard copies to any interested parties upon request.
Comment Date: 5 p.m. eastern time on November 29, 2004.
4. Alpena Power Generation, L.L.C.
[Docket No. ER04-1004-002]
Take notice that on November 5, 2004, Alpena Power Generation,
L.L.C. (Alpena Generation) tendered for filing a second supplement to
its application for market-based rate authority filed on July 9, 2004,
as amended on August 27, 2004, in response to the Commission's October
22, 2004, deficiency letter in Docket Nos. ER04-1004-000 and ER04-1004-
001.
Alpena Generation states that copies of the filing were served on
the public utility's jurisdictional customers and the Michigan Public
Service Commission.
Comment Date: 5 p.m. eastern time on November 26, 2004.
5. Orion Power MidWest, L.P.
[Docket Nos. ER05-92-000 and ER05-92-001]
Take notice that on October 28, 2004, as amended on November 2,
2004, Orion Power MidWest, L.P. (OPMW) filed a revised tariff sheet
designated as First Revised Sheet No. 1, Orion Power MidWest, L.P. FERC
Electric Tariff, First Revised Volume No. 1. OPMW requests an effective
date of December 1, 2004.
OPMW states that copies of the filing were served on OPMW's
jurisdictional customers.
Comment Date: 5 p.m. eastern time on November 23, 2004.
6. PPL Electric Utilities Corporation
[Docket No. ER05-169-001]
Take notice that on November 5, 2004, PPL Electric Utilities
Corporation (PPL Electric) submitted an amendment to its November 2,
2004, filing of revisions to PPL Electric Rate Schedule FERC No. 180, a
transmission agreement between PPL Electric and Allegheny Electric
Cooperating, Inc. (Allegheny).
PPL Electric states that copies of the filing were served on
Allegheny.
Comment Date: 5 p.m. eastern time on November 26, 2004.
7. Allegheny Energy Supply Company, LLC
[Docket No. ER05-180-000]
Take notice that on November 4, 2004, Allegheny Energy Supply
Company, LLC (AE Supply) filed a Notice of Cancellation of Hatfield's
Ferry LLC, FERC Electric Tariff, Original Volume No. 1. AE Supply
requests an effective date of January 1, 2005.
AE Supply states that a copy of the Notice of Cancellation has been
served on all persons with currently effective service agreements under
the rate schedule referenced above.
Comment Date: 5 p.m. eastern time on November 26, 2004.
8. AYP Energy, Inc.
[Docket No. ER05-181-000]
Take notice that on November 4, 2004, AYP Energy, Inc. (AYP) filed
a Notice of Cancellation of AYP Energy, Inc., First Revised Rate
Schedule No. 1. AYP requests an effective date of January 1, 2005.
AYP states that a copy of the Notice of Cancellation has been
served on all persons with currently effective service agreements under
the rate schedule referenced above.
Comment Date: 5 p.m. eastern time on November 26, 2004.
9. Midwest Independent Transmission System Operator, Inc.
[Docket No. ER05-182-000]
Take notice that on November 4, 2004, the Midwest Independent
Transmission System Operator, Inc., (Midwest ISO) filed an
Interconnection and Operating Agreement among the Electric Generation
Business Function of Northern States Power Company d/b/a Xcel Energy,
the Functionally Unbundled Transmission Function of Northern States
Power Company d/ba Xcel and the Midwest ISO.
Midwest ISO states that the filing was served on the parties to the
Interconnection Agreement.
Comment Date: 5 p.m. eastern time on November 26, 2004.
10. Carolina Power & Light Company
[Docket No. ER05-183-000]
Take notice that on November 4, 2004, Carolina Power & Light
Company, doing business as Progress Energy Carolina, (CP&L) tendered
for filing a Generator Balancing Service Schedule as Schedule 4B under
the Open Access Transmission Tariffs of CP&L and Florida Power
Corporation. CP&L requests an effective date of January 1, 2005.
CP&L states that copies of the filing were served on the North
Carolina Utilities Commission, the South Carolina Public Service
Commission and CP&L's jurisdictional customers.
Comment Date: 5 p.m. eastern time on November 26, 2004.
11. PJM Interconnection, L.L.C.
[Docket No. ER05-184-000]
Take notice that on November 4, 2004, PJM Interconnection, L.L.C.
(PJM) filed amendments to the PJM Open Access Transmission Tariff and
the Amended and Restated Operating Agreement of PJM Interconnection,
L.L.C. to create a special membership for its real-time option Economic
Load Response Program. PJM requests an effective date of November 5,
2004.
PJM states that copies of the filing were served on all PJM members
and each state electric utility regulatory commission in the PJM
region.
Comment Date: 5 p.m. eastern time on November 26, 2004.
12. PJM Interconnection, L.L.C.
[Docket No. ER05-185-000]
Take notice that on November 4, 2004, PJM Interconnection, L.L.C.
(PJM) filed proposed costs of generating units for providing black
start service in the Commonwealth Edison Company zone to be recovered
under Schedule 6A and of the PJM Tariff in lieu of the formula rate
specified in the Tariff.
PJM states that copies of the filing were served on all PJM members
and each state electric utility regulatory commission in the PJM
region.
Comment Date: 5 p.m. eastern time on November 26, 2004.
[[Page 67717]]
13. Midwest Independent Transmission System Operator, Inc.
[Docket No. ER05-186-000]
Take notice that on November 5, 2004, the Midwest Independent
Transmission System Operator, Inc., (Midwest ISO) filed a Large
Generator Interconnection Agreement among Butler Ridge, LLC, American
Transmission Company, LLC and the Midwest ISO.
Midwest ISO states that the filing was served on the parties to the
Interconnection Agreement.
Comment Date: 5 p.m. eastern time on November 26, 2004.
14. Virginia Electric and Power Company
[Docket No. ER05-187-000]
Take notice that on November 5, 2004, Virginia Electric and Power
Company (Dominion) tendered for filing a new Appendix E-2 for the
Service Agreement under its Open Access Transmission Tariff, FERC
Electric Tariff Second Revised Volume No. 5, for Network Integration
Transmission Service between Dominion and North Carolina Electric
Membership Corporation (NCEMC). Dominion states that the revised
service agreement adds charges to reimburse Dominion for costs
associated with the conversion of Mapleton Delivery Point for Roanoke
Electric Cooperation.
Dominion states that copies of the filing were served on the NCEMC,
the North Carolina Utilities Commission and the Virginia State
Corporation Commission.
Comment Date: 5 p.m. eastern time on November 26, 2004.
15. Entergy Services, Inc.
[Docket No. ER05-188-000]
Take notice that on November 5, 2004, Entergy Louisiana, Inc.
(Entergy Louisiana) tendered for filing an Interconnection Agreement
between Entergy Louisiana and Perryville Energy Partners, L.L.C.,
designated as Original Service Agreement No. 381 under Entergy
Services, Inc.'s FERC Electric Tariff, Second Revised Volume No. 3.
Comment Date: 5 p.m. eastern time on November 26, 2004.
16. Entergy Services, Inc.
[Docket No. ER05-189-000]
Take notice that on November 5, 2004, Entergy Services, Inc., on
behalf of Entergy Louisiana, Inc. (Entergy Louisiana), tendered for
filing a Notice of Termination of Original Service Agreement No. 102
under Entergy Services, Inc.'s FERC Electric Tariff, First Revised
Volume No. 3 and Supplement No. 1 thereto, the Interconnection and
Operating Agreement and Generator Imbalance Agreement between Entergy
Louisiana and Cleco Midstream Resources, LLC.
Comment Date: 5 p.m. eastern time on November 26, 2004.
17. Midwest Independent Transmission System Operator, Inc. and Northern
Indiana Public Service Company
[Docket No. ER05-190-000]
Take notice that on November 5, 2004, the Midwest Independent
Transmission System Operator, Inc., (Midwest ISO) and Northern Indiana
Public Service Company (NIPSCO) (collectively, Applicants) filed a
joint application under section 205 of the Federal Power Act for
approval of transition to formulae rate. Applicants submitted proposed
revisions to the Open Access Transmission Tariff of the Midwest ISO to
reflect NIPSCO's transition from stated rates to the formulae rates
under Attachment O, Rate Formulae of the Tariff. Applicants request an
effective date of December 1, 2004.
Applicants state that copies of this filing have been served
electronically on all Midwest ISO members, member representatives of
transmission customers, and the Midwest ISO Advisory Committee
participants, as well as all State commissions within the affected
regions. In addition, Applicants state that the filing has been posted
on the Midwest ISO's Web site at http://www.midwestiso.org under the
heading ``Filings to FERC.''
Comment Date: 5 p.m. eastern time on November 26, 2004.
18. Perryville Energy Partners, L.L.C.
[Docket No. ER05-191-000]
Take notice that on November 5, 2004, Perryville Energy Partners,
L.L.C. (PEP) tendered for filing an Interconnection and Service Charge
Agreement (Agreement) between PEP and Entergy Louisiana, Inc. (Entergy
Louisiana) requesting that the Commission permit the Agreement to
become effective as of the date that PEP's sale to Entergy Louisiana of
the Perryville 718 megawatt natural gas-fired generating facility
located in Ouachita Parish near Perryville, Louisiana, becomes
effective.
PEP states that copies of the filing were served on Entergy
Louisiana and the Louisiana Public Service Commission.
Comment Date: 5 p.m. eastern time on November 26, 2004.
19. PJM Interconnection, L.L.C.
[Docket No. ER05-192-000]
Take notice that on November 1, 2004, PJM Interconnection, L.L.C.
(PJM) submitted for filing (1) seven service agreements that were
previously filed with and accepted by the Commission, and (2) five
service agreements that have been filed with the Commission and for
which Commission action is pending to redesignate them with new service
agreement numbers. PJM requests waiver to permit the prior Commission-
approved effective dates for the agreements previously accepted for
filing by the Commission and to permit the effective dates originally
requested for the agreements for which Commission action is currently
pending.
PJM states that copies of the filing were served on the parties to
the agreements and the state regulatory commissions within the PJM
region.
Comment Date: 5 p.m. eastern time on November 22, 2004.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov.
Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at http://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
[[Page 67718]]
(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E4-3260 Filed 11-18-04; 8:45 am]
BILLING CODE 6717-01-P