[Federal Register: March 9, 2004 (Volume 69, Number 46)]
[Notices]
[Page 11007]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr09mr04-64]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application for Non-Project Use of Project Lands and
Soliciting Comments, Motions to Intervene, and Protests
March 3, 2004.
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Non-project use of project lands.
b. Project No.: 2210-101.
c. Date Filed: February 3, 2004.
d. Applicant: Appalachian Power Company (APC).
e. Name of Project: Smith Mountain Pumped Storage Project.
f. Location: The project is located on the Roanoke River, in
Bedford, Pittsylvania, Franklin, and Roanoke Counties, Virginia.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a) 825(r)
and 799 and 801.
h. Applicant Contact: Teresa P. Rogers, Hydro Generation
Department, American Electric Power, P.O. Box 2021, Roanoke, VA 24022-
2121, (540) 985-2441.
i. FERC Contact: Any questions on this notice should be addressed
to Mrs. Heather Campbell at (202) 502-6182, or e-mail address:
heather.campbell@ferc.gov.
j. Deadline for filing comments and or motions: April 5, 2004.
All documents (original and eight copies) should be filed with: Ms.
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Please include the project
number (P-2210-101) on any comments or motions filed. Comments,
protests, and interventions may be filed electronically via the
Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's Web site at http://www.ferc.gov under
the ``e-Filing'' link. The Commission strongly encourages e-filings.
k. Description of Request: APC is requesting approval to permit
Highland Lake Inc.(permittee) to install and operate two docks, each
with four double slips for a total of 16 floating boat slips.
Development will take place along the Bull Run portion of the
Blackwater River on Smith Mountain Lake. The proposed facilities will
serve 16 off-water lots in the Highland Lake subdivision. Highland Lake
subdivision is located off of Route 663 in the Union Hall area of
Franklin County. No dredging is proposed.
l. Location of the Application: This filing is available for review
at the Commission in the Public Reference Room, 888 First Street, NE,
Room 2A, Washington, D.C. 20426 or may be viewed on the Commission's
Web site at http://www.ferc.gov using the ``e-library'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. For assistance, call toll-free 1-866-208-
3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-
8659. A copy is also available for inspection and reproduction at the
address in item h. above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of rules of practice and procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as
applicable, and the Project Number of the particular application to
which the filing refers. A copy of any motion to intervene must also be
served upon each representative of the Applicant specified in the
particular application.
p. Agency Comments--Federal, State, and local agencies are invited
to file comments on the described application. Copies of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E4-482 Filed 3-8-04; 8:45 am]
BILLING CODE 6717-01-P