[Federal Register: March 19, 2004 (Volume 69, Number 54)]
[Notices]
[Page 13027-13028]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr19mr04-41]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER97-1397-010, et al.]
South Jersey Energy Company, et al.; Electric Rate and Corporate
Filings
March 11, 2004.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. South Jersey Energy Company
[Docket No. ER97-1397-010]
Take notice that on March 8, 2004, South Jersey Energy Company
(SJE) tendered for filing an updated market analysis in compliance with
the Commission's order, issued February 28, 1997, in Docket No. ER97-
1397-000.
Comment Date: March 29, 2004.
2. Calpine Oneta Power, L.P.
[Docket No. ER04-279-001]
Take notice that on March 8, 2004, Calpine Oneta Power, L.P.
(Oneta) tendered for filing, under section 205 of the Federal Power Act
and in compliance with the Order issued February 6, 2004, in Docket No.
ER04-0279-000, 106 FERC ]61,107 (2004), a revised rate schedule for
Emergency Redispatch Service.
Comment Date: March 29, 2004.
3. Exelon New Boston, LLC
[Docket No. ER04-344-001]
Take notice that on March 8, 2004, Exelon New Boston, LLC (Exelon
New Boston) tendered for filing the Second Amended Reliability Must Run
Agreement by and among Exelon New Boston LLC, Exelon New England
Holdings, LLC and ISO New England, Inc., Exelon New Boston Second
Revised Rate Schedule FERC No. 3, to comply with the Commission's
February 27, 2004, Order in Docket No. ER04-344-000.
Comment Date: March 29, 2004.
4. Duke Energy Corporation
[Docket No. ER04-365-001]
Take notice that on March 9, 2004, Duke Energy Corporation (Duke),
submitted for filing its Interconnection Agreement with North Carolina
Electric Membership Corporation designated as Second Revised FERC
Electric Rate Schedule No. 273 in conformance with Order No. 614,
Designation of Electric Rate Schedule Sheets, FERC Stats. & Regs.
Preambles ]31,096 (2000) filed in compliance with the Commission Order
issued February 26, 2004, in Docket No. ER04-365-000.
Comment Date: March 30, 2004.
5. California Independent System Operator Corporation
[Docket No ER04-370-002]
Take notice that, on March 9, 2004, the California Independent
System Operator Corporation (ISO) submitted a revised informational
filing regarding the ISO's transmission Access Charge and Wheeling
rates for the East Central Area (TAC Area), effective January 1, 2004.
ISO states that these changes are necessary to reflect modifications to
the Transmission Revenue Balancing Account Adjustments of the Cities of
Anaheim, Azusa, Banning and Riverside, California.
ISO states that it has served copies of the filing on the Public
Utilities Commission of the State of California, the California Energy
Commission, the California Electricity Oversight Board, the
Participating Transmission Owners, and upon all parties with effective
Scheduling Coordinator Service Agreements under the ISO Tariff. In
addition, the ISO is posting the filing on its Web site.
Comment Date: March 29, 2004.
6. Indeck-Oswego Limited Partnership
[Docket No. ER04-493-001]
Take notice that on March 8, 2004, Indeck-Oswego Limited
Partnership (Indeck-Oswego) tendered for filing an amendment to its
January 29, 2004, filing in Docket No. ER04-493-000.
Comment Date: March 29, 2004.
7. Portland General Electric Company
[Docket No. ER04-604-001]
Take notice that on March 5, 2004, Portland General Electric
Company (PGE) tendered for filing an amendment to their March 1, 2004,
filing under PGE's FERC Electric Tariff, Original Volume No. 12. PGE
states that the revisions are intended to bring their Form of Umbrella
Service Agreement into conformance with current business practices.
PGE states that a copy of the filing was served upon the Oregon
Public Utility Commission.
Comment Date: March 26, 2004.
8. American Electric Power Service Corporation
[Docket No. ER04-624-000]
Take notice that on March 8, 2004, American Electric Power Service
Corporation (AEPSC) submitted for filing four transmission
interconnection agreements on behalf of its AEP Texas Central Company
and AEP Texas North Company affiliates. AEPSC states that these
agreements with Rio Grande Electric Cooperative, Inc., (RGEC) Texas-New
Mexico Power Company (TNMP) and the City of Brady, Texas provide for
the continued interconnection of the parties systems at all of their
existing points of interconnection and that no new points of
interconnection are included in these agreements. AEPSC seeks an
effective date of February 23, 2004, for the agreements with RGEC,
January 9, 2004, for the agreement with TNMP and January 1, 2003, for
the agreement with the City.
AEPSC states that it served copies of the filing on RGEC, TNMP, the
City and the Public Utility Commission of Texas.
Comment Date: March 29, 2004.
9. Southern California Edison Company
[Docket No. ER04-626-000]
Take notice that on March 9, 2004, Southern California Edison
Company (SCE) tendered for filing a Letter Agreement between SCE and
the Blythe Energy, LLC (Blythe Energy). SCE states that the purpose of
the Letter Agreement is to provide an interim arrangement pursuant to
which SCE will commence the required biological and cultural studies
and certain other tasks required
[[Page 13028]]
to prepare an application for a Certificate of Public Convenience and
Necessity from the California Public Utilities Commission in
anticipation of constructing, at Blythe Energy's request a 230 kV
transmission line from Western Area Power Administration's Buck Blvd.
Substation to a new 500-230-161 kV Substation (Midpoint Substation) to
be located adjacent to or under SCE's existing Palo Verde-Devers
transmission line.
SCE states that copies of this filing were served upon the Public
Utilities Commission of the State of California and Blythe Energy.
Comment Date: March 30, 2004.
10. MidAmerican Energy Company
[Docket No. ER04-627-000]
Take notice that on March 9, 2004, MidAmerican Energy Company
(MidAmerican), tendered for filing with the Commission a Transmission
Operating Agreement between MidAmerican Energy Company and Nebraska
Public Power District, which incorporates Amendment No. 2 to the
Agreement dated December 31, 2003. MidAmerican requests an effective
date of December 31, 2003, for this Agreement, however MidAmerican
states that the revisions will not be implemented until January 1,
2005.
MidAmerican states that it has served a copy of the filing on the
Iowa Utilities Board, the Illinois Commerce Commission and the South
Dakota Public Utilities Commission.
Comment Date: March 30, 2004.
Standard Paragraph
Any person desiring to intervene or to protest this filing should
file with the Federal Energy Regulatory Commission, 888 First Street,
NE., Washington, DC 20426, in accordance with rules 211 and 214 of the
Commission's rules of practice and procedure (18 CFR 385.211 and
385.214). Protests will be considered by the Commission in determining
the appropriate action to be taken, but will not serve to make
protestants parties to the proceeding. Any person wishing to become a
party must file a motion to intervene. All such motions or protests
should be filed on or before the comment date, and, to the extent
applicable, must be served on the applicant and on any other person
designated on the official service list. This filing is available for
review at the Commission or may be viewed on the Commission's Web site
at http://www.ferc.gov, using the ``FERRIS'' link. Enter the docket
number excluding the last three digits in the docket number filed to
access the document. For assistance, call (202) 502-8222 or TTY, (202)
502-8659. Protests and interventions may be filed electronically via
the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's Web site under the ``e-Filing'' link.
The Commission strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E4-634 Filed 3-18-04; 8:45 am]
BILLING CODE 6717-01-P