[Federal Register: April 15, 2004 (Volume 69, Number 73)]
[Notices]
[Page 19996-19997]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr15ap04-57]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EC04-89-000, et al.]
Erie Boulevard Hydropower, L.P., et al.; Electric Rate and
Corporate Filings
April 5, 2004.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. Erie Boulevard Hydropower, L.P. and Orion Power New York GP II, Inc.
[Docket No. EC04-89-000]
Take notice that on April 2, 2004, Erie Boulevard Hydropower, L.P.
(Erie) and Orion Power New York GP II, Inc. (GP II), pursuant to
section 203 of the Federal Power Act, filed with the Commission an
application seeking an order authorizing an internal corporate
reorganization.
Comment Date: April 23, 2004.
2. Michigan Electric Transmission Company, LLC
[Docket No. ER03-1341-001]
Take notice that on March 30, 2004, Michigan Electric Transmission
Company, LLC, (METC) in compliance with the Commission's order issued
November 17, 2003, in Docket No. ER03-1341-000, submitted schedules
showing its actual weighted average cost of long-term debt for calendar
year 2003.
Copies of this filing were served on all parties included on the
Commission's official service list established in this proceeding.
Comment Date: April 20, 2004.
3. PJM Interconnection, L.L.C.
[Docket No. ER04-378-002]
Take notice that on March 30, 2004, PJM Interconnection, L.L.C.
(PJM) submitted for filing an errata to its March 25, 2004, compliance
filing in Docket No. ER04-378-001 to revise the designation of the
substitute construction service agreement among PJM, U.S. General
Services Administration, White Oak Federal Research Center, and Potomac
Electric Power Company submitted in the compliance filing.
PJM states that copies of this filing were served upon persons
designated on the official service list compiled by the Secretary in
this proceeding and the parties to the agreements.
Comment Date: April 20, 2004.
4. Hartford Steam Company
[Docket No. ER04-582-001]
Take notice that on March 30, 2004, Hartford Steam Company
(Hartford Steam) filed an amendment to its February 25, 2004,
Application for Acceptance of Initial Rate Schedule and Certain Waivers
and Blanket Authorizations. Hartford Steam requests an effective date
of February 25, 2004.
Comment Date: April 20, 2004.
5. Southwest Power Pool, Inc.
[Docket No. ER04-658-001]
Take notice that on March 30, 2004, Southwest Power Pool, Inc.
(SPP) filed certain corrections to the proposed changes to the SPP Open
Access Transmission Tariff (Tariff) filed with the Commission on March
17, 2004, in Docket No. ER04-658-000. SPP seeks an effective date of
April 1, 2004, for these changes.
SPP has served a copy of its transmittal letter on each of its
Members and Customers, and on all affected state commissions.
Comment Date: April 20, 2004.
6. New Light Energy, LLC
[Docket No. ER04-683-000]
Take notice that on March 30, 2004, New Light Energy, LLC (New
Light) petitioned the Commission for acceptance of New Light Rate
Schedule FERC Electric Tariff Original Volume No. 1; the granting of
certain blanket approvals, including the authority to sell electricity
at market-based rates; and the waiver of certain Commission
regulations. New Light states that it intends to engage in wholesale
electric power and energy purchases and sales as a marketer. New Light
further states that it is not in the business of generating or
transmitting electric power.
Comment Date: April 20, 2004.
7. Capital Center Generating Company, LLC
[Docket No. ER04-684-000]
Take notice that on March 30, 2004, Capital Center Generating
Company, LLC (CCGC), submitted a Notice of Cancellation of its Rate
Schedule FERC No. 1. CCGC states that it proposes to cancel Rate
Schedule FERC No. 1 because CCGC no longer operates or sells power from
the 6.5 MW gas-fired generating facility that it owns. CCGC requests an
effective date of March 26, 2004.
Comment Date: April 20, 2004.
[[Page 19997]]
8. WPS Resources Operating Companies
[Docket No. ER04-685-000]
Take notice that on March 30, 2004, WPS Resources Operating
Companies, on behalf of Wisconsin Public Service Corporation and Upper
Peninsula Power Company (collectively, WPS Resources), tendered for
filing a notice of cancellation and a revised service agreement cover
sheet (Cancellation Documents) to terminate a service agreement between
WPS Resources and Consolidated Water Power Company under WPS Resources'
open access transmission tariff, FERC Electric Tariff, First Revised
Volume No. 1. WPS Resources requests an effective date of March 1,
2004.
WPS Resources states that copies of the filing were served upon
CWP, the Public Service Commission of Wisconsin and the Michigan Public
Service Commission.
Comment Date: April 20, 2004.
9. Aleph One, Inc.
[Docket No. ER04-686-000]
Take notice that on March 30, 2004, Aleph One, Inc. (Aleph One)
petitioned the Commission to accept for filing Aleph One's FERC
Electric Tariff No. 1 (Tariff No. 1) and grant Aleph One the blanket
authority to make market-based sales of energy, capacity and ancillary
services under its Tariff No. 1 and grant Aleph One such waivers and
authorizations as have been granted by the Commission to other entities
authorized to transact at market-based rates. Aleph One requests an
effective date of March 31, 2004.
Comment Date: April 20, 2004.
10. PJM Interconnection, L.L.C.
[Docket No. ER04-687-000]
Take notice that on March 30, 2004, PJM Interconnection, L.L.C.
(PJM) submitted revisions to the Reliability Assurance Agreement Among
Load-Serving Entities in The PJM Control Area and PJM West Reliability
Assurance Agreement Among Long-Serving Entities in the PJM West Region
to make minor modifications to the timing for approval of changes in
the forecast pool requirement under such agreements. PJM requests an
effective date of May 30, 2004, for the proposed revisions.
PJM states that copies of the filing were served on all PJM members
and the utility regulatory commissions in the PJM region.
Comment Date: April 20, 2004.
Standard Paragraph
Any person desiring to intervene or to protest this filing should
file with the Federal Energy Regulatory Commission, 888 First Street,
NE., Washington, DC 20426, in accordance with rules 211 and 214 of the
Commission's rules of practice and procedure (18 CFR 385.211 and
385.214). Protests will be considered by the Commission in determining
the appropriate action to be taken, but will not serve to make
protestants parties to the proceeding. Any person wishing to become a
party must file a motion to intervene. All such motions or protests
should be filed on or before the comment date, and, to the extent
applicable, must be served on the applicant and on any other person
designated on the official service list. This filing is available for
review at the Commission or may be viewed on the Commission's Web site
at http://www.ferc.gov, using the ``FERRIS'' link. Enter the docket
number excluding the last three digits in the docket number filed to
access the document. For assistance, call (202) 502-8222 or TTY, (202)
502-8659. Protests and interventions may be filed electronically via
the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's web site under the ``e-Filing'' link.
The Commission strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E4-835 Filed 4-14-04; 8:45 am]
BILLING CODE 6717-01-P