[Federal Register: April 15, 2004 (Volume 69, Number 73)]
[Notices]               
[Page 19999-20001]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr15ap04-59]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EC04-91-000, et al.]

 
Pacificorp, et al.; Electric Rate and Corporate Filings

April 8, 2004.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

1. Pacificorp, Avista Corporation, Puget Sound Energy, Inc., and 
2677588 Washington LLC

[Docket No. EC04-91-000]

    Take notice that on April 6, 2004, Pacificorp, Avista Corporation, 
Puget Sound Energy, Inc., and 2677588 Washington LLC, (collectively, 
Applicants), filed with the Federal Energy Regulatory Commission an 
application pursuant to section 203 of the Federal Power Act for 
authorization of a disposition of jurisdictional facilities whereby 
2677588 Washington LLC, a limited liability company formed by TransAlta 
USA Inc. would purchase the Skookumchuck dam, hydroelectric facility 
and related assets (the Project). The Applicants states that the 
Project consists generally of an earth-fill dam, a one-megawatt 
hydroelectric generating facility and related equipment located in the 
vicinity of Centralia, Washington. Applicants do not believe that the 
proposed transaction requires section 203 approval, but nevertheless 
submit this Application to eliminate any doubt about jurisdictional 
assets prior to the closing of the sale. Applicants further states that 
the proposed sale does not require 2677588 Washington LLC to 
participate as an Applicant, but the purchaser nevertheless joins in 
this Application in order to ensure timely closing of the transaction.
    Comment Date: April 27, 2004.

2. Oklaunion Electric Generating Cooperative, Inc.

[Docket No. EG04-52-000]

    On April 6, 2004, Oklaunion Electric Generating Cooperative, Inc. 
(OEGC) filed with the Federal Energy Regulatory Commission an 
application for determination of exempt wholesale generator status 
pursuant to part 365 of the Commission's regulations.
    OEGC states that pursuant to a Purchase and Sale Agreement dated as 
of January 31, 2004, OEGC will obtain an undivided 7.81% ownership 
interest in the Oklaunion Power Station, a 690 MW coal-fired facility 
located in Wilbarger County, Texas. OEGC further states that this 
purchase could occur as early as May 13, 2004. Golden Spread Electric 
Cooperative, Inc., OEGC's sole member, will purchase the output of the 
facility.
    Comment Date: April 27, 2004.

3. MEP Pleasant Hill, LLC

[Docket No. ER99-2858-001]

    Take notice that on April 5, 2004, MEP Pleasant Hill, LLC (MEPPH) 
pursuant to the Commission's order issued on June 17, 1999, in Docket 
No. ER99-2858-000, submitted for filing a notification of change in 
status regarding the facts the Commission relied upon in granting 
approval of market-based rates for MEPPH.
    Comment Date: April 26, 2004.

4. Exelon Generation Company, LLC

[Docket Nos. ER01-948-000 and ER01-1008-000]

    Take notice that on February 13, 2004, Exelon Generating Company, 
LLC

[[Page 20000]]

(Exelon Generation) submitted a filing withdrawing the power sales 
agreements between Commonwealth Edison Company, an affiliate of Exelon 
Generation, and Entergy-Koch Trading, LP \1\ filed on January 12, 2001, 
in Docket No. ER01-1008-000 and January 19, 2001, in Docket No. ER01-
1008-000.
---------------------------------------------------------------------------

    \1\ ComEd's original counterparty to the agreement was CNG Power 
Services Corporation (CNG), but CNG subsequently assigned the 
agreement to Entergy Power and Marketing Corporation, which now is 
known as Entergy-Koch Trading, LP.
---------------------------------------------------------------------------

    Exelon Generation states that a copy of the filing has been served 
on the parties on the Commission's service list in these proceedings.
    Comment Date: April 19, 2004.

5. Magnolia Energy LP

[Docket No. ER01-1335-003]

    Take notice that on April 5, 2004, Magnolia Energy LP (Magnolia), 
submitted for filing with the Commission its triennial updated market 
analysis and revisions to its FERC Electric Tariff, Original Volume No. 
1 to incorporate the Market Behavior Rules set forth in Investigation 
of Terms and Conditions of Public Utility Market-Based Rate 
Authorizations, 105 FERC ] 61,218 (2003).
    Comment Date: April 26, 2004.

6. PJM Interconnection, L.L.C.

[Docket No. ER04-367-002]

    Take notice that on April 2, 2004, PJM Interconnection, L.L.C. 
(PJM) and Commonwealth Edison Company and Commonwealth Edison Company 
of Indiana, Inc. (ComEd) submitted a compliance filing pursuant to the 
Commission's March 18, 2004, Order in this proceeding, 106 FERC ] 
61,252 (2004). PJM and ComEd requested an effective date of May 1, 
2004.
    PJM and ComEd state that copies of the filing were served on all 
PJM members, the utility regulatory commissions in the PJM region, and 
all persons on the service list for this proceeding.
    Comment Date: April 13, 2004.

7. Midwest Independent Transmission System Operator, Inc., and PJM 
Interconnection, L.L.C.

[Docket No. ER04-375-001]

    Take notice that on April 2, 2004, the Midwest Independent 
Transmission System Operator, Inc. (Midwest ISO) and PJM 
Interconnection, L.L.C. (PJM) submitted a compliance filing pursuant to 
an order issued on March 18, 2004, in Docket No. ER04-375-000, 106 FERC 
] 61,251.
    Midwest ISO and PJM state that copies of the filing were served 
upon all persons on the service list in this docket, as well as all PJM 
members, and each state electric utility regulatory commission in the 
PJM regions. Service upon Midwest ISO members and other stakeholders 
was requested to be waived; however, the filing is available on the 
Midwest ISO Internet site.
    Comment Date: April 23, 2004.

8. Commonwealth Edison Company

[Docket No. ER04-589-001]

    Take notice that on April 6, 2004, Commonwealth Edison Company 
(ComEd) submitted a filing withdrawing Original Service Agreement Nos. 
767 through 779 under ComEd's FERC Electric Rate Tariff, Second Revised 
Volume No. 5. The service agreements were filed with the Commission on 
February 26, 2004.
    ComEd states that a copy of the filing has been served on the 
parties on the Commission's service list and the Illinois Commerce 
Commission.
    Comment Date: April 27, 2004.

9. Commonwealth Edison Company

[Docket No. ER04-594-000]

    Take notice that on April 6, 2004, Commonwealth Edison Company 
(ComEd) submitted a filing withdrawing Original Service Agreement Nos. 
780 through 784 under ComEd's FERC Electric Rate Tariff, Second Revised 
Volume No. 5. The service agreements were filed with the Commission on 
February 27, 2004.
    ComEd states that a copy of the filing has been served on the 
parties on the Commission's service list and the Illinois Commerce 
Commission.
    Comment Date: April 27, 2004.

10. Entergy Services, Inc.

[Docket No. ER04-699-000]

    Take notice that on April 1, 2004, Entergy Services, Inc., on 
behalf of Entergy Arkansas, Inc., Entergy Gulf States, Inc., Entergy 
Louisiana, Inc., Entergy Mississippi, Inc., and Entergy New Orleans, 
Inc. (collectively, Entergy), filed proposed revisions to the Entergy 
Open Access Transmission Tariff (OATT), FERC Electric Tariff Second 
Revised Volume No. 3. Entergy states that the proposed revisions are 
designed to achieve greater independence and efficiency in the 
provision of transmission service, and the pricing of that service, on 
the Entergy system.
    Comment Date: May 17, 2004.

11. Virginia Electric and Power Company

[Docket No. ER04-702-000]

    Take notice that on April 2, 2004, Virginia Electric and Power 
Company (Dominion Virginia Power) tendered for filing an Amended 
Contract designated as Second Revised Rate Schedule FERC No. 132, 
Service Agreement for Network Integration Transmission Service and 
Network Operating Agreement, designated as Service Agreement No. 381, 
and Service Agreement for Firm Point-To-Point Transmission Service, 
designated as Service Agreement No 382. Dominion Virginia Power 
requests an effective date of January 1, 2004.
    Comment Date: April 23, 2004.

12. MidAmerican Energy Company

[Docket No. ER04-703-000]

    Take notice that on April 2, 2004, MidAmerican Energy Company 
(MidAmerican), tendered for filing with the Commission an Electric 
Interconnection Agreement between MidAmerican Energy Company and 
Northwest Iowa Power Cooperative, which incorporates the Third 
Amendment to the Agreement dated March 9, 2004. MidAmerican requests an 
effective date of the later of the effective date of the acceptance of 
this Agreement by the Commission or the approval of this Agreement, 
incorporating the Fifth Amendment by the Administrator of the Rural 
Utilities Service or the successor in interest to the Administrator, if 
the approval of the Administrator or such successor is required by law.
    MidAmerican states that it has served a copy of the filing on the 
Iowa Utilities Board, the Illinois Commerce Commission and the South 
Dakota Public Utilities Commission.
    Comment Date: April 23, 2004.

13. Premcor Generating LLC

[Docket No. ER04-704-000]

    Take notice that on April 2, 2004, Premcor Generating LLC submitted 
for filing notification that Williams Generating Memphis, LLC was sold 
to Premcor Refining Group Inc. and the name has been changed to Premcor 
Generating LLC.
    Comment Date: April 23, 2004.

14. Fitchburg Gas and Electric Light Company

[Docket No. ER04-707-000]

    Take notice that on April 2, 2004, Fitchburg Gas and Electric Light 
Company (FG&E) tendered for filing pursuant to Commission Order No. 618 
and section 205 of the Federal Power Act proposed changes in its 
transmission depreciation rates for its Pool Transmission Facilities 
that are indirectly subject to the formula rate in the New England 
Power Pool's open access transmission tariff. FG&E requests a June 1, 
2004, effective date.

[[Page 20001]]

    FG&E states that copies of the filing were served upon New England 
Power Company, ISO New England, Inc. and the Massachusetts Department 
of Telecommunications and Energy.
    Comment Date: April 23, 2004.

15. Horsehead Corp.

[Docket No. ER04-708-000]

    Take notice that on April 2, 2004, Horsehead Corp. (Horsehead) 
filed with the Commission a Notice of Succession adopting the FERC 
Electric Tariff, Original Volume No. 1 of Horsehead Industries, Inc. 
(Tariff) and a revised Tariff reflecting the name change from Horsehead 
Industries, Inc. to Horsehead Corp.
    Comment Date: April 23, 2004.

16. Deseret Generation & Transmission Co-operative, Inc.

[Docket No. ER04-709-000]

    Take notice that on April 2, 2004, Deseret Generation & 
Transmission Co-operative, Inc. (Deseret) tendered for filing an 
amendment to First Revised Service Agreement No. 5 under Deseret's FERC 
Electric Tariff, Original Volume 1, an Agreement for Large Industrial 
Rate between Deseret and one of its members, Moon Lake Electric 
Association, Inc. Deseret requests an effective date of May 1, 2004.
    Deseret states that copies of this filing have been served upon 
Deseret's member cooperatives.
    Comment Date: April 23, 2004.

17. PJM Interconnection, L.L.C.

[Docket No. ER04-710-000]

    Take notice that on April 2, 2004, PJM Interconnection, L.L.C. 
(PJM), submitted for filing an executed interconnection service 
agreement (ISA) among PJM, PPL Susquehanna, L.L.C. and PPL Electric 
Utilities Corporation and notices of cancellation of an ISA that has 
been superseded. PJM requests a waiver of the Commission's 60-day 
notice requirement to permit a March 4, 2004, effective date for the 
ISA and the notices of cancellation.
    PJM states that copies of this filing were served upon the parties 
to the agreements and the State regulatory commissions within the PJM 
region.
    Comment Date: April 23, 2004.

18. Florida Keys Electric Cooperative Association, Inc.

[Docket No. ER04-713-000]

    Take notice that on April 5, 2004, Florida Keys Electric 
Cooperative Association, Inc. (FKEC) tendered for filing a revised rate 
for non-firm transmission service provided to Keys Energy Services, Key 
West, Florida (KES) in accordance with the terms and conditions of the 
Long-Term Joint Investment Transmission Agreement between the Parties.
    FKEC states that a copy of this filing has been served on KES and 
the Florida Public Service Commissioner.
    Comment Date: April 26, 2004.

19. American Electric Power Service Corporation

[Docket No. ER04-715-000]

    Take notice that on April 5, 2004, the American Electric Power 
Service Corporation (AEPSC), as agent for Indiana Michigan Power 
Company (I&M), tendered for filing a Modification to the Letter 
Agreement (Agreement) between I&M and Northern Indiana Public Service 
Company. AEP requests an effective date of April 5, 2004.
    AEPSC states that a copy of the filing was served upon Northern 
Indiana Public Service Company and the Indiana Utility Regulatory 
Commission and Michigan Public Service Commission.
    Comment Date: April 26, 2004.

20. Atlantic City Electric Company

[Docket No. ER04-716-000]

    Take notice that on April 5, 2004, Atlantic City Electric Company 
(Atlantic) tendered for filing an executed Interconnection Agreement 
between Atlantic and the City of Vineland, New Jersey (Vineland). 
Atlantic also tendered for filing a Notice of Cancellation of its Rate 
Schedule No. 74. Atlantic requests an effective date of March 20, 2004.
    Atlantic states that copies of the filing were served upon Vineland 
and the State of New Jersey Board of Public Utilities.
    Comment Date: April 26, 2004.

21. EcoElectrica, L.P.

[Docket No. QF95-328-006]

    Take notice that on April 2, 2004, EcoElectrica, L.P. 
(EcoElectrica) filed with the Federal Energy Regulatory Commission an 
application for recertification as a qualifying cogeneration facility 
(QF) pursuant to 292.207(b) of the Commission's regulations. No 
determination has been made that the submittal constitutes a complete 
filing.
    EcoElectrica states that the cogeneration facility (Facility) is 
located in Penuelas, Puerto Rico and uses natural gas as its primary 
energy source. The Facility consists of two nominally rated 171,690 kW 
combustion turbine generators in combined-cycle, two multi-pressure 
heat recovery steam generators, and a single cylinder, single flow, 
nominally rated 214,000 kW reheat steam turbine generator set and has a 
maximum gross electric power production capacity of 578 MW. The 
facility is interconnected with the Puerto Rico Electric Power 
Authority (PREPA). EcoElectrica sells electric energy to PREPA. PREPA 
provides backup power, maintenance power and interruptible power to the 
Facility.
    Comment Date: April 26, 2004.

Standard Paragraph

    Any person desiring to intervene or to protest this filing should 
file with the Federal Energy Regulatory Commission, 888 First Street, 
NE., Washington, DC 20426, in accordance with rules 211 and 214 of the 
Commission's rules of practice and procedure (18 CFR 385.211 and 
385.214). Protests will be considered by the Commission in determining 
the appropriate action to be taken, but will not serve to make 
protestants parties to the proceeding. Any person wishing to become a 
party must file a motion to intervene. All such motions or protests 
should be filed on or before the comment date, and, to the extent 
applicable, must be served on the applicant and on any other person 
designated on the official service list. This filing is available for 
review at the Commission or may be viewed on the Commission's Web site 
at http://www.ferc.gov, using the ``FERRIS'' link. Enter the docket 

number excluding the last three digits in the docket number filed to 
access the document. For assistance, call (202) 502-8222 or TTY, (202) 
502-8659. Protests and interventions may be filed electronically via 
the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the 
instructions on the Commission's Web site under the ``e-Filing'' link. 
The Commission strongly encourages electronic filings.

Magalie R. Salas,
Secretary.
 [FR Doc. E4-855 Filed 4-14-04; 8:45 am]

BILLING CODE 6717-01-P