[Federal Register: April 15, 2004 (Volume 69, Number 73)]
[Notices]
[Page 19999-20001]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr15ap04-59]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EC04-91-000, et al.]
Pacificorp, et al.; Electric Rate and Corporate Filings
April 8, 2004.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. Pacificorp, Avista Corporation, Puget Sound Energy, Inc., and
2677588 Washington LLC
[Docket No. EC04-91-000]
Take notice that on April 6, 2004, Pacificorp, Avista Corporation,
Puget Sound Energy, Inc., and 2677588 Washington LLC, (collectively,
Applicants), filed with the Federal Energy Regulatory Commission an
application pursuant to section 203 of the Federal Power Act for
authorization of a disposition of jurisdictional facilities whereby
2677588 Washington LLC, a limited liability company formed by TransAlta
USA Inc. would purchase the Skookumchuck dam, hydroelectric facility
and related assets (the Project). The Applicants states that the
Project consists generally of an earth-fill dam, a one-megawatt
hydroelectric generating facility and related equipment located in the
vicinity of Centralia, Washington. Applicants do not believe that the
proposed transaction requires section 203 approval, but nevertheless
submit this Application to eliminate any doubt about jurisdictional
assets prior to the closing of the sale. Applicants further states that
the proposed sale does not require 2677588 Washington LLC to
participate as an Applicant, but the purchaser nevertheless joins in
this Application in order to ensure timely closing of the transaction.
Comment Date: April 27, 2004.
2. Oklaunion Electric Generating Cooperative, Inc.
[Docket No. EG04-52-000]
On April 6, 2004, Oklaunion Electric Generating Cooperative, Inc.
(OEGC) filed with the Federal Energy Regulatory Commission an
application for determination of exempt wholesale generator status
pursuant to part 365 of the Commission's regulations.
OEGC states that pursuant to a Purchase and Sale Agreement dated as
of January 31, 2004, OEGC will obtain an undivided 7.81% ownership
interest in the Oklaunion Power Station, a 690 MW coal-fired facility
located in Wilbarger County, Texas. OEGC further states that this
purchase could occur as early as May 13, 2004. Golden Spread Electric
Cooperative, Inc., OEGC's sole member, will purchase the output of the
facility.
Comment Date: April 27, 2004.
3. MEP Pleasant Hill, LLC
[Docket No. ER99-2858-001]
Take notice that on April 5, 2004, MEP Pleasant Hill, LLC (MEPPH)
pursuant to the Commission's order issued on June 17, 1999, in Docket
No. ER99-2858-000, submitted for filing a notification of change in
status regarding the facts the Commission relied upon in granting
approval of market-based rates for MEPPH.
Comment Date: April 26, 2004.
4. Exelon Generation Company, LLC
[Docket Nos. ER01-948-000 and ER01-1008-000]
Take notice that on February 13, 2004, Exelon Generating Company,
LLC
[[Page 20000]]
(Exelon Generation) submitted a filing withdrawing the power sales
agreements between Commonwealth Edison Company, an affiliate of Exelon
Generation, and Entergy-Koch Trading, LP \1\ filed on January 12, 2001,
in Docket No. ER01-1008-000 and January 19, 2001, in Docket No. ER01-
1008-000.
---------------------------------------------------------------------------
\1\ ComEd's original counterparty to the agreement was CNG Power
Services Corporation (CNG), but CNG subsequently assigned the
agreement to Entergy Power and Marketing Corporation, which now is
known as Entergy-Koch Trading, LP.
---------------------------------------------------------------------------
Exelon Generation states that a copy of the filing has been served
on the parties on the Commission's service list in these proceedings.
Comment Date: April 19, 2004.
5. Magnolia Energy LP
[Docket No. ER01-1335-003]
Take notice that on April 5, 2004, Magnolia Energy LP (Magnolia),
submitted for filing with the Commission its triennial updated market
analysis and revisions to its FERC Electric Tariff, Original Volume No.
1 to incorporate the Market Behavior Rules set forth in Investigation
of Terms and Conditions of Public Utility Market-Based Rate
Authorizations, 105 FERC ] 61,218 (2003).
Comment Date: April 26, 2004.
6. PJM Interconnection, L.L.C.
[Docket No. ER04-367-002]
Take notice that on April 2, 2004, PJM Interconnection, L.L.C.
(PJM) and Commonwealth Edison Company and Commonwealth Edison Company
of Indiana, Inc. (ComEd) submitted a compliance filing pursuant to the
Commission's March 18, 2004, Order in this proceeding, 106 FERC ]
61,252 (2004). PJM and ComEd requested an effective date of May 1,
2004.
PJM and ComEd state that copies of the filing were served on all
PJM members, the utility regulatory commissions in the PJM region, and
all persons on the service list for this proceeding.
Comment Date: April 13, 2004.
7. Midwest Independent Transmission System Operator, Inc., and PJM
Interconnection, L.L.C.
[Docket No. ER04-375-001]
Take notice that on April 2, 2004, the Midwest Independent
Transmission System Operator, Inc. (Midwest ISO) and PJM
Interconnection, L.L.C. (PJM) submitted a compliance filing pursuant to
an order issued on March 18, 2004, in Docket No. ER04-375-000, 106 FERC
] 61,251.
Midwest ISO and PJM state that copies of the filing were served
upon all persons on the service list in this docket, as well as all PJM
members, and each state electric utility regulatory commission in the
PJM regions. Service upon Midwest ISO members and other stakeholders
was requested to be waived; however, the filing is available on the
Midwest ISO Internet site.
Comment Date: April 23, 2004.
8. Commonwealth Edison Company
[Docket No. ER04-589-001]
Take notice that on April 6, 2004, Commonwealth Edison Company
(ComEd) submitted a filing withdrawing Original Service Agreement Nos.
767 through 779 under ComEd's FERC Electric Rate Tariff, Second Revised
Volume No. 5. The service agreements were filed with the Commission on
February 26, 2004.
ComEd states that a copy of the filing has been served on the
parties on the Commission's service list and the Illinois Commerce
Commission.
Comment Date: April 27, 2004.
9. Commonwealth Edison Company
[Docket No. ER04-594-000]
Take notice that on April 6, 2004, Commonwealth Edison Company
(ComEd) submitted a filing withdrawing Original Service Agreement Nos.
780 through 784 under ComEd's FERC Electric Rate Tariff, Second Revised
Volume No. 5. The service agreements were filed with the Commission on
February 27, 2004.
ComEd states that a copy of the filing has been served on the
parties on the Commission's service list and the Illinois Commerce
Commission.
Comment Date: April 27, 2004.
10. Entergy Services, Inc.
[Docket No. ER04-699-000]
Take notice that on April 1, 2004, Entergy Services, Inc., on
behalf of Entergy Arkansas, Inc., Entergy Gulf States, Inc., Entergy
Louisiana, Inc., Entergy Mississippi, Inc., and Entergy New Orleans,
Inc. (collectively, Entergy), filed proposed revisions to the Entergy
Open Access Transmission Tariff (OATT), FERC Electric Tariff Second
Revised Volume No. 3. Entergy states that the proposed revisions are
designed to achieve greater independence and efficiency in the
provision of transmission service, and the pricing of that service, on
the Entergy system.
Comment Date: May 17, 2004.
11. Virginia Electric and Power Company
[Docket No. ER04-702-000]
Take notice that on April 2, 2004, Virginia Electric and Power
Company (Dominion Virginia Power) tendered for filing an Amended
Contract designated as Second Revised Rate Schedule FERC No. 132,
Service Agreement for Network Integration Transmission Service and
Network Operating Agreement, designated as Service Agreement No. 381,
and Service Agreement for Firm Point-To-Point Transmission Service,
designated as Service Agreement No 382. Dominion Virginia Power
requests an effective date of January 1, 2004.
Comment Date: April 23, 2004.
12. MidAmerican Energy Company
[Docket No. ER04-703-000]
Take notice that on April 2, 2004, MidAmerican Energy Company
(MidAmerican), tendered for filing with the Commission an Electric
Interconnection Agreement between MidAmerican Energy Company and
Northwest Iowa Power Cooperative, which incorporates the Third
Amendment to the Agreement dated March 9, 2004. MidAmerican requests an
effective date of the later of the effective date of the acceptance of
this Agreement by the Commission or the approval of this Agreement,
incorporating the Fifth Amendment by the Administrator of the Rural
Utilities Service or the successor in interest to the Administrator, if
the approval of the Administrator or such successor is required by law.
MidAmerican states that it has served a copy of the filing on the
Iowa Utilities Board, the Illinois Commerce Commission and the South
Dakota Public Utilities Commission.
Comment Date: April 23, 2004.
13. Premcor Generating LLC
[Docket No. ER04-704-000]
Take notice that on April 2, 2004, Premcor Generating LLC submitted
for filing notification that Williams Generating Memphis, LLC was sold
to Premcor Refining Group Inc. and the name has been changed to Premcor
Generating LLC.
Comment Date: April 23, 2004.
14. Fitchburg Gas and Electric Light Company
[Docket No. ER04-707-000]
Take notice that on April 2, 2004, Fitchburg Gas and Electric Light
Company (FG&E) tendered for filing pursuant to Commission Order No. 618
and section 205 of the Federal Power Act proposed changes in its
transmission depreciation rates for its Pool Transmission Facilities
that are indirectly subject to the formula rate in the New England
Power Pool's open access transmission tariff. FG&E requests a June 1,
2004, effective date.
[[Page 20001]]
FG&E states that copies of the filing were served upon New England
Power Company, ISO New England, Inc. and the Massachusetts Department
of Telecommunications and Energy.
Comment Date: April 23, 2004.
15. Horsehead Corp.
[Docket No. ER04-708-000]
Take notice that on April 2, 2004, Horsehead Corp. (Horsehead)
filed with the Commission a Notice of Succession adopting the FERC
Electric Tariff, Original Volume No. 1 of Horsehead Industries, Inc.
(Tariff) and a revised Tariff reflecting the name change from Horsehead
Industries, Inc. to Horsehead Corp.
Comment Date: April 23, 2004.
16. Deseret Generation & Transmission Co-operative, Inc.
[Docket No. ER04-709-000]
Take notice that on April 2, 2004, Deseret Generation &
Transmission Co-operative, Inc. (Deseret) tendered for filing an
amendment to First Revised Service Agreement No. 5 under Deseret's FERC
Electric Tariff, Original Volume 1, an Agreement for Large Industrial
Rate between Deseret and one of its members, Moon Lake Electric
Association, Inc. Deseret requests an effective date of May 1, 2004.
Deseret states that copies of this filing have been served upon
Deseret's member cooperatives.
Comment Date: April 23, 2004.
17. PJM Interconnection, L.L.C.
[Docket No. ER04-710-000]
Take notice that on April 2, 2004, PJM Interconnection, L.L.C.
(PJM), submitted for filing an executed interconnection service
agreement (ISA) among PJM, PPL Susquehanna, L.L.C. and PPL Electric
Utilities Corporation and notices of cancellation of an ISA that has
been superseded. PJM requests a waiver of the Commission's 60-day
notice requirement to permit a March 4, 2004, effective date for the
ISA and the notices of cancellation.
PJM states that copies of this filing were served upon the parties
to the agreements and the State regulatory commissions within the PJM
region.
Comment Date: April 23, 2004.
18. Florida Keys Electric Cooperative Association, Inc.
[Docket No. ER04-713-000]
Take notice that on April 5, 2004, Florida Keys Electric
Cooperative Association, Inc. (FKEC) tendered for filing a revised rate
for non-firm transmission service provided to Keys Energy Services, Key
West, Florida (KES) in accordance with the terms and conditions of the
Long-Term Joint Investment Transmission Agreement between the Parties.
FKEC states that a copy of this filing has been served on KES and
the Florida Public Service Commissioner.
Comment Date: April 26, 2004.
19. American Electric Power Service Corporation
[Docket No. ER04-715-000]
Take notice that on April 5, 2004, the American Electric Power
Service Corporation (AEPSC), as agent for Indiana Michigan Power
Company (I&M), tendered for filing a Modification to the Letter
Agreement (Agreement) between I&M and Northern Indiana Public Service
Company. AEP requests an effective date of April 5, 2004.
AEPSC states that a copy of the filing was served upon Northern
Indiana Public Service Company and the Indiana Utility Regulatory
Commission and Michigan Public Service Commission.
Comment Date: April 26, 2004.
20. Atlantic City Electric Company
[Docket No. ER04-716-000]
Take notice that on April 5, 2004, Atlantic City Electric Company
(Atlantic) tendered for filing an executed Interconnection Agreement
between Atlantic and the City of Vineland, New Jersey (Vineland).
Atlantic also tendered for filing a Notice of Cancellation of its Rate
Schedule No. 74. Atlantic requests an effective date of March 20, 2004.
Atlantic states that copies of the filing were served upon Vineland
and the State of New Jersey Board of Public Utilities.
Comment Date: April 26, 2004.
21. EcoElectrica, L.P.
[Docket No. QF95-328-006]
Take notice that on April 2, 2004, EcoElectrica, L.P.
(EcoElectrica) filed with the Federal Energy Regulatory Commission an
application for recertification as a qualifying cogeneration facility
(QF) pursuant to 292.207(b) of the Commission's regulations. No
determination has been made that the submittal constitutes a complete
filing.
EcoElectrica states that the cogeneration facility (Facility) is
located in Penuelas, Puerto Rico and uses natural gas as its primary
energy source. The Facility consists of two nominally rated 171,690 kW
combustion turbine generators in combined-cycle, two multi-pressure
heat recovery steam generators, and a single cylinder, single flow,
nominally rated 214,000 kW reheat steam turbine generator set and has a
maximum gross electric power production capacity of 578 MW. The
facility is interconnected with the Puerto Rico Electric Power
Authority (PREPA). EcoElectrica sells electric energy to PREPA. PREPA
provides backup power, maintenance power and interruptible power to the
Facility.
Comment Date: April 26, 2004.
Standard Paragraph
Any person desiring to intervene or to protest this filing should
file with the Federal Energy Regulatory Commission, 888 First Street,
NE., Washington, DC 20426, in accordance with rules 211 and 214 of the
Commission's rules of practice and procedure (18 CFR 385.211 and
385.214). Protests will be considered by the Commission in determining
the appropriate action to be taken, but will not serve to make
protestants parties to the proceeding. Any person wishing to become a
party must file a motion to intervene. All such motions or protests
should be filed on or before the comment date, and, to the extent
applicable, must be served on the applicant and on any other person
designated on the official service list. This filing is available for
review at the Commission or may be viewed on the Commission's Web site
at http://www.ferc.gov, using the ``FERRIS'' link. Enter the docket
number excluding the last three digits in the docket number filed to
access the document. For assistance, call (202) 502-8222 or TTY, (202)
502-8659. Protests and interventions may be filed electronically via
the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's Web site under the ``e-Filing'' link.
The Commission strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E4-855 Filed 4-14-04; 8:45 am]
BILLING CODE 6717-01-P