[Federal Register: May 27, 2005 (Volume 70, Number 102)]
[Notices]
[Page 30718-30719]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr27my05-62]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6663-7]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202)
[[Page 30719]]
564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 05/16/2005 Through 05/20/2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050200, Draft EIS, AFS, CA, Creeks Forest Health Recovery
Project, To Develop a Network of Defensible Fuel Profile Zones (DFPZs),
Group-Selection Timber Harvest, Individual Tree Selection, Lassen
National Forest, Almanor Ranger District, Plumas County, CA, Comment
Period Ends: 07/11/2005, Contact: Robin Bryant (530) 258-2141.
EIS No. 20050201, Final EIS, AFS, NM, San Diego Range Allotment
Project, Proposes To Revise Grazing Program, Santa Fe National Forest,
Jemez Ranger District, Township 17-19 North, Range 1-3 East, Sandoval
County, NM, Wait Period Ends: 06/27/2005, Contact: Derek Padilla (505)
829-3535.
EIS No. 20050202, Draft EIS, CGD, 00, Programmatic--Vessel and Facility
Response Plans for Oil: 2003 Removal Equipment Requirements and
Alternative Technology Revisions, To Increase the Oil Removal
Capability, U.S. Exclusive Economic Zone (EEZ), United States, Alaska,
Guam, Puerto Rico and other U.S. Territories, Comment Period Ends: 07/
11/2005, Contact: Brad McKitrick (202) 267-0995.
EIS No. 20050203, Draft EIS, NPS, WA, Mountain Lake Fisheries
Management Plan for the North Cascades National Service Complex,
Implementation, North Cascades National Park, Whatcom, Skagit and
Chelan Counties, WA, Comment Period Ends: 08/26/2005, Contact: Roy Zipp
(360) 873-4590. Ext. 31.
EIS No. 20050204, Final EIS, FRC, MA, Weaver's Cove Liquefied Natural
Gas (LNG) Project, Construct and Operate Onshore Liquefied Natural Gas
Import and Interstate Natural Gas Transmission Facilities, Falls River,
Bristol County, MA, Wait Period Ends: 06/27/2005, Contact: Roberta
Coulter (202) 502-8584.
EIS No. 20050205, Final EIS, FRC, RI, KeySpan Liquefied Natural Gas
(LNG) Facility Upgrade Project, Construction and Operation, and
Algonquin Gas Transmission Project, Proposal for Site, Construct and
Operate a New Natural Gas Pipeline, Coast Guard Permit, U.S. Army COE
Section 10 and 404 Permits, Providence County, RI and New England, Wait
Period Ends: 06/27/2005, Contact: Thomas Russo 1-866-20-3372.
Amended Notices
EIS No. 20050077, Draft EIS, AFS, AR, Ozark-St. Francis National
Forests Proposed Revised Land and Resource Management Plan,
Implementation, Several Counties, AR, Comment Period Ends: 06/27/2005,
Contact: Cary Frost (479) 964-7507. Revision of FR Notice Published on
02/25/2005: CEQ Comment Period Ending 05/26/2005 has been extended to
06/27/2005.
EIS No. 20050114, Draft EIS, AFS, IN, Hoosier National Forest Land and
Resource Management Plan, Implementation, Brown, Crawford, Dubois,
Jackson, Lawrence, Martin, Monroe, Orange, Perry Counties, IN, Comment
Period Ends: 06/27/2005, Contact: JEDI Perez (812) 275-5987. Revision
of FR Notice Published on 03/25/2005: CEQ Comment Period Ending 06/23/
2005 has been extended to 06/27/2005.
EIS No. 20050127, Draft EIS, AFS, MI, Hathaway National Forest,
Proposed Land and Resource Management Plan, Forest Plan Revision,
Implementation, Alder, Sheboygan, Chippewa, Delta, Luce and Mackinac
Counties, MI, Comment Period Ends: 06/27/2005, Contact: Dave Maercklein
(906) 786-4062. Revision of FR Notice Published on 03/25/2005: CEQ
Comment Period Ending 06/23/2005 has been extended to 06/27/2005.
EIS No. 20050139, Draft EIS, COE, AR, Arkansas River Navigation Study,
To Maintain and Improve the Navigation Channel in Order To Enhance
Commercial Navigation on the McCellan Kerr Arkansas River Navigation
System (MKARNS), Several Counties, AR and Several Counties, OK, Comment
Period Ends: 06/23/2005, Contact: Renee Wright (501) 324-6139. Revision
of FR Notice Published on 04/08/2005: CEQ Comment Period Ending on 05/
24/2005 has been extended to 06/23/2005.
EIS No. 20050145, Final EIS, FHW, MO, I-64/US 40 Corridor,
Reconstruction of the Existing 1-64/US 40 Facility with New Interchange
Configurations and Roadway, Funding, City of St. Louis, St. Louis
County, MO, Wait Period Ends: 06/20/2005, Contact: Don Neumann (573)
636-7104. Revision of FR Notice Published on 4/15/05: Wait Period
Ending 05/20/2005 has been extended to 06/20/2005.
Dated: May 24, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-10676 Filed 5-26-05; 8:45 am]
BILLING CODE 6560-50-P