Drawbridge Operation Regulations; Spa Creek, MD
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Fifth Coast Guard District, has approved a
temporary deviation from the regulations governing the operation of the
S181 Bridge across the Spa Creek, at mile 0.4, at Annapolis, in MD.
This deviation allows the drawbridge to remain in the closed-to-
navigation position each day from 10 p.m. to 5 a.m., beginning July 6,
2005, through August 31, 2005, to facilitate sandblasting and painting
operations of the bridge.
DATES: This deviation is effective from 10 p.m. beginning July 6, 2005,
to 5 a.m. through August 31, 2005.
FOR FURTHER INFORMATION CONTACT: Gary Heyer, Bridge Management
Specialist, Fifth Coast Guard District, at (757) 398-6629.
SUPPLEMENTARY INFORMATION: The Maryland State Highway Authority, who
owns and operates the S181 Bridge, has requested a temporary deviation
from the operating regulation to facilitate needed sandblasting and
painting of the bridge.
To facilitate this operation, the lift-span will be locked in the
closed-to-navigation position each day from 10 p.m. to 5 a.m. beginning
July 6, 2005, until and including August 31, 2005. During these closure
periods, the process requires completely immobilizing the operation of
the lift span in the closed-to-navigation position. At all other times,
the bridge will operate in accordance with the current operating
regulations outlined in 33 CFR 117.571.
The Coast Guard has informed the known users of the waterway of the
closure periods for the bridge so that these vessels can arrange their
transits to minimize any impact caused by the temporary deviation.
The District Commander has granted temporary deviation from the
operating requirements listed in 33 CFR 117.35 for the purpose of
repair completion of the drawbridge. The temporary deviation allows the
S181 Bridge across the Spa
[[Page 30901]]
Creek, at mile 0.4, at Annapolis, MD, to remain in the closed-to-
navigation position each day from 10 p.m. to 5 a.m. beginning July 6,
2005, through August 31, 2005.
Dated: May 20, 2005.
Waverly W. Gregory, Jr.,
Chief, Bridge Administration Branch, Fifth Coast Guard District.