[Federal Register: June 10, 2005 (Volume 70, Number 111)]
[Notices]
[Page 33901-33902]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr10jn05-59]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6664-2]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements.
Filed 05/30/2005 Through 06/03/2005.
Pursuant to 40 CFR 1506.9.
EIS No. 20050218, Final EIS, NPS, OR, Crater Lake National Park General
Management Plan, Implementation, Klamath, Jackson and Douglas Counties,
OR, Wait Period Ends: 07/05/2005, Contact: Terry Urbanowski 303-969-
2277
EIS No. 20050219, Final EIS, BLM, 00, California Coastal National
Monument Resource Management Plan, To Protect Important Biological and
Geological Values: Islands, Rocks, Exposed Reefs, and Pinnacles above
Mean High Tide, CA, OR and Mexico, Wait Period Ends: 07/11/2005,
Contact: Brenda Williams 202-452-5112.
EIS No. 20050220, Draft EIS, FHW, WA, Interstate 90 Snoqualmie Pass
East Project, Proposes to Improve a 15-mile Portion of I-90 from
Milepost 55.10 in Hyak to Milepost 70.3 New Easton, Funding, U.S. Army
COE Section 404 Permit and NPDES Permit, Kittitas County, WA, Comment
Period Ends: 08/05/2005, Contact: Steve Saxton 360-753-9556 This
document is available on the Internet at: http://www.wsdot.wa.gov/projects/I90/SomqualmiePassEast/
.
EIS No. 20050221, Draft EIS, FHW, VA, Southeastern Parkway and
Greenbelt Location Study, Construction from Chesapeake and Virginia
Beach, Funding and U.S. Army COE Section 404 Permit, Cities of
Chesapeake and Virginia Beach, VA, Comment Period Ends: 07/25/2005,
Contact: Ken Myers 804-775-3353.
EIS No. 20050222, Draft EIS, FAA, AZ, Phoenix Sky Harbor International
Airport (PHX), Construction and Operation of a Terminal, Airfield and
Surface Transportation, City of Phoenix, Maricopa County, AZ, Comment
Period Ends: 07/26/2005, Contact: Jennifer Mendelsohn 310-725-3637
EIS No. 20050223, Final EIS, FHW, UT, 11400 South Project, Proposed
Improvement to the Transportation Network in the Southern Salt Lake
Valley from 12300/12600 South to 10400/10600 South, and from Bangerter
Highway to 700 East, Salt Lake City, Salt Lake County, UT, wait period
ends: 07/11/2005 Contact: Jeff Berna 801-963-0078 ext 235.
EIS No. 20050224, Final Supplement, FHW, NY, NY-9A Reconstruction
Project, West Thames Street to Chambers Street in Lower Manhattan the
Result of September 11, 2001 Attack, Lower Manhattan Redevelopment, New
York County, NY, Wait Period Ends: 07/11/2005, Contact: Richard Schmalz
212-267-4113.
EIS No. 20050225, Final EIS, HUD, NY, Ridge Hill Village Project,
Construction, Comprehensive Development Plan, (CDP), Planned Mixed-Use
Developmental District (PMD), U.S. Army COE Section 404 Permit, City of
Yonkers, Westchester County, NY, Wait Period Ends: 07/11/2005, Contact:
Joan Deierlein 914-377-6015.
EIS No. 20050226, Draft EIS, FHW, RI, U.S. Route 6/Route 10 Interchange
Improvement Project, To Identify Transportation Alternative, Funding,
City of Providence, Providence County, RI, Comment Period Ends: 08/01/
2005, Contact: Ralph Rizzo 401-528-4548.
EIS No. 20050227, Final EIS, COE, 00, Lower Snake River Navigation
Maintenance, To Perform Routine Maintenance of the Federal Navigation
Channel and Berthing Areas, Lower Snake and Clearwater Rivers, WA and
ID, Wait Period Ends: 07/11/2005, Contact: Jack Sands 509-527-7287.
This document is available on the Internet at: http://www.nww.usace.army.mil/channel/_maint/one-yeardefault.htm
.
EIS No. 20050228, Draft EIS, FHW, VA, U.S. 460 Location Study Project,
Transportation Improvements from I-295 in Prince George County to the
Interchange of Route 460 and 58 along the Suffolk Bypass, Funding, U.S.
Army COE Section 10 and 404 Permits, Prince George, Sussex, Surry,
Southampton and Isle of Wight Counties, VA, Comment Period Ends: 07/25/
2005, Contact: Ken Myers 804-775-3358
EIS No. 20050229, Draft EIS, AFS, OR,
Blue Mountain Land Exchange--Oregon Project, Proposed Exchange of
Federal and Non-Federal Lands, Malheur, Umatilla, and Wallowa-Whitman
National Forests, Baker, Grant, Morrow, Umatilla, Union and Wallowa
Counties, OR, Comment Period Ends: 07/25/2005, Contact: Jean Lavell
541-523-1230.
EIS No. 20050230, Final EIS, FRC, 00, Golden Pass Liquefied Natural Gas
(LNG) Import Terminal and Natural Gas Pipeline Facilities, Construction
and Operation, Jefferson, Orange, Newton Counties, TX and Calcasieu
Parish, LA, Wait Period Ends: 07/11/2005, Contact: Thomas Russo 1-866-
208-3372.
Amended Notices
EIS No. 20050133, Draft EIS, AFS, OH, Wayne National Forest, Proposed
Revised Land and Resource Management Plan, Implementation, Several
Counties, OH, Due: 07/01/2005, Contact: Bob Gianniny 770-753-0101
Revision of FR Notice Published on 04/01/2005: CEQ Comment Period
Ending on 6/30/2005 has been Extended to 07/01/2005.
EIS No. 20050176, Draft EIS, FAA, AK, Juneau International Airport,
Proposed Development Activities to Enhance Operations Safety,
Facilitate Aircraft Alignment, US Army COE Section 404 Permit, City and
Borough of Juneau, AK, Comment Period Ends: 06/30/2005, Contact: Patti
Sullivan 907-271-5454 Revision of FR Notice Published on 05/06/2005:
Correction to Review Period Ending 06/20/2005 to 06/30/2005.
EIS No. 20050202, Draft EIS, CGD, 00, Programmatic--Vessel and Facility
Response Plans for Oil: 2003 Removal Equipment Requirements and
Alternative Technology Revisions, To Increase the Oil Removal
Capability, U.S. Exclusive Economic Zone (EEZ), United States, Alaska,
Guam, Puerto
[[Page 33902]]
Pico and other U.S. Territories, Comment Period Ends: 08/01/2005,
Contact: Brad McKitrick 202-267-0995 Revision of FR Notice Published on
05/27/2005: Correction to CEQ Comment Period Ending 07/26 /2005 has
been Extended to 08/01/2005.
EIS No. 20050209, Draft EIS, NPS, WY, Grand Teton National Park
Transportation Plan, Implementation, Grand Teton National Park, Teton
County, WY, Comment Period Ends: 08/01/2005, Contact: Adrienne Anderson
303-987-6730 Revision of FR Notice Published on 06/03/2005: Correction
to Comment Period Ending 07/18/2005 to 08/01/2005.
Dated: June 7, 2005.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. 05-11557 Filed 6-9-05; 8:45 am]
BILLING CODE 6560-50-P