[Federal Register: August 26, 2005 (Volume 70, Number 165)]
[Notices]
[Page 50346-50347]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr26au05-90]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6666-7]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements Filed 08/15/2005
Through 08/19/2005. Pursuant to 40 CFR 1506.9.
EIS No. 20050343, Final EIS, BLM, ND, West Mine Area, Freedom Mine,
Federal Coal Lease Application, Mercer County, ND, Wait Period Ends: 9/
26/2005, Contact: Allen Ollila 701-227-7713.
EIS No. 20050344, Final EIS, NRC, WI, Generic--License Renewal for
Point Beach Nuclear Plant, Units 1 and 2, Supplement 23 to NUREG-1437
(TAC Nos. MC2049 and MC2050), Lake Michigan, Manitowoc County, WI, Wait
Period Ends: 09/26/2005, Contact: Stacey Imboden 301-415-2462.
EIS No. 20050345, Final Supplement, BLM, NV, Ruby Hill Mine Expansion--
East Archimedes Project, Extension of Existing Open Pit and Expansion
of Two Existing Waste Rock Disposal Areas, Plan-of-Operations Permit,
Eureka County, NV, Wait Period Ends: 09/26/2005, Contact: Caleb Hiner
775-635-4052.
EIS No. 20050346, Draft EIS, DOA, NV, White Pine & Grant-Quinn Oil and
Gas Leasing Project, Exploration and Development, Humboldt-Toiyabe
National Forest, Ely Ranger District, White Pine, Nye and Lincoln
Counties, NV, Comment Period Ends: 10/11/2005, Contact: Loretta Cartner
775-289-5120.
EIS No. 20050347, Draft EIS, DOE, ME, Bangor Hydro-Electric Northeast
Reliability Interconnect, Construct, Connect, Operate and Maintain an
Electric Transmission Line, Amend Presidential Permit (PP-89), DOE/EIS-
0372, Hancock, Penobscot and Washington Counties, ME, Comment
[[Page 50347]]
Period Ends: 10/11/2005, Contact: Dr. Jerry Pell 202-586-3362.
EIS No. 20050348, Draft EIS, NPS, WA, Ebey's Landing National
Historical Reserve General Management Plan, Implementation, Town of
Coupeville, Island County, WA, Comment Period Ends: 12/01/2005,
Contact: Rob Harbour 360-678-6084.
EIS No. 20050349, Draft Supplement, COE, FL, Central and Southern
Florida Project, Tamiami Trail Modifications, Modified Water Deliveries
to Everglades National Park, Authorized Flow of Water from WCA-3B and
the L-29 Canal North of the Tamiami Trail, Dade County, FL, Comment
Period Ends: 10/11/2005, Contact: Barbara Cintron 904-232-1692.
EIS No. 20050350, Draft EIS, COE, CA, Encinitas/Solana Beach Shoreline
Protection Project, To Protect Public Safety and Reduce Storm-Related
Damages to Coastal Structures, Cities of Encinitas and Solana Beach,
San Diego County, CA, Comment Period Ends: 10/11/2005, Contact: Shannon
Dellaquila 213-452-3846.
Amended Notices
EIS No. 20050202, Draft EIS, CGD, 00, Programmatic--Vessel and Facility
Response Plans for Oil: 2003 Removal Equipment Requirements and
Alternative Technology Revisions, To Increase the Oil Removal
Capability, U.S. Exclusive Economic Zone (EEZ), United States, Alaska,
Guam, Puerto Rico and other U.S. Territories, Comment Period Ends: 9/6/
2005, Contact: Brad McKitrick 202-267-0995.
Revision of FR Notice Published on 05/27/2005: Extending CEQ
Comment Period Ending 8/1/2005 has been Extended to 9/6/2005.
EIS No. 20050329, Final EIS, NPS, ID, Craters of the Moon National
Monument and Preserve, Update and Consolidate Management Plans, into
One Comprehensive Plan, Snake River Plain, Butte, Blaine, Lincoln, and
Minidoka Counties, ID, Wait Period Ends: 09/26/2005, Contact: Adrienne
Anderson 303-987-6730.
Revision of FR Notice Published on 08/12/2005: CEQ Wait Period
Ending 9/12/2005 has been Reestablished to 09/26/2005. Due to
Incomplete Distribution of the FEIS at the time of Filing with USEPA
under Section 1506.9 of the CEQ Regulations.
Dated: August 23, 2005.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. 05-17036 Filed 8-25-05; 8:45 am]
BILLING CODE 6560-50-P