[Federal Register: September 7, 2005 (Volume 70, Number 172)]
[Rules and Regulations]
[Page 53070]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr07se05-9]
[[Page 53070]]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD05-05-108]
Drawbridge Operation Regulations; New Jersey Intracoastal
Waterway, Inside Thorofare, Ventnor City, NJ
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Fifth Coast Guard District, has approved a
temporary deviation from the regulations governing the operation of the
Dorset Avenue Bridge, at New Jersey Intracoastal Waterway (ICW) mile
72.1, across the Inside Thorofare at Ventnor City, New Jersey. To
facilitate removal and replacement of deck lift spans, the temporary
deviation would allow partial openings of the drawbridge.
DATES: This deviation is effective from 7 a.m. on October 3, 2005, to
11 p.m. on October 21, 2005.
ADDRESSES: Materials referred to in this document are available for
inspection or copying at Commander (obr), Fifth Coast Guard District,
Federal Building, 1st Floor, 431 Crawford Street, Portsmouth, VA 23704-
5004 between 8 a.m. and 4 p.m., Monday through Friday, except Federal
holidays. The telephone number is (757) 398-6422. Commander (obr),
Fifth Coast Guard District maintains the public docket for this
temporary deviation.
FOR FURTHER INFORMATION CONTACT: Gary Heyer, Bridge Management
Specialist, Fifth Coast Guard District, at (757) 398-6629.
SUPPLEMENTARY INFORMATION: The Dorset Avenue Bridge has a vertical
clearance in the closed position of 9 feet at mean high water and 12
feet at mean low water.
A.P. Construction, Inc. on behalf of Atlantic County, which owns
and operates this double-leaf bascule drawbridge, has requested a
temporary deviation from the current operating regulations set out in
33 CFR 117.733(h) to facilitate deck repairs.
During this temporary deviation, deck repairs will require
immobilizing half of the draw span. From 7 a.m. to 11 p.m. beginning on
October 3, 2005 until and including October 21, 2005, single leaf
openings will be provided on signal. Only double leaf openings will be
provided from 11 p.m. to 7 a.m. Full openings will be provided at any
time when at least two hours advance notice is given to the bridge
tender at (609) 822-1805 or via marine radio on channel 13 VHF. At all
other times, the draw shall open on signal.
In accordance with 33 CFR 117.35(c), this work will be performed
with all due speed in order to return the bridge to normal operation as
soon as possible. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: August 23, 2005.
Waverly W. Gregory, Jr.,
Chief, Bridge Administration Branch Fifth Coast Guard District.
[FR Doc. 05-17715 Filed 9-6-05; 8:45 am]
BILLING CODE 4910-15-P