[Federal Register: September 9, 2005 (Volume 70, Number 174)]
[Notices]
[Page 53657-53658]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr09se05-82]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6667-2]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements filed 08/29/2005
through 09/02/2005, pursuant to 40 CFR 1506.9.
EIS No. 20050357, Draft EIS, AFS, UT, Lake Project, Proposal to
Maintain Vegetative Diversity and Recover Economic Value of Dead, Dying
and High Risk to Mortality Trees, Manti-La Sal National Forest, Ferron/
Price Ranger District, Emery and Sanpete Counties, UT, Comment Period
Ends: 10/24/2005, Contact: Alan Lucas 435-636-3320.
EIS No. 20050358, Draft EIS, NPS, VA, Great Falls Park General
Management Plan, Implementation, George Washington Parkway, Fairfax
County, VA, Comment Period Ends: 11/08/2005, Contact: Audrey F. Calhoun
703-289-2500.
EIS No. 20050359, Draft EIS, NPS, AK, Denali National Park and
Preserve, Draft South Denali Implementation Plan, Matanuska-Susitna
Borough, AK, Comment Period Ends: 11/15/2005, Contact: Glen Yankus 907-
644-3535.
EIS No. 20050360, Draft EIS, AFS, SD, Bugtown Gulch Mountain Pine
Beetle and Fuels Projects, To Implement Multiple Resource Management
Actions, Black Hills National Forest, Hell Canyon Ranger District,
Custer County, SD, Comment Period Ends: 10/24/2005, Contact: Patricia
Hudson 605-673-4853.
EIS No. 20050361, Draft EIS, FRC, WA, Rocky Reach Hydroelectric
Project, (FERC/DEIS-0184D), Application for a New License for the
Existing 865.76 Megawatt Facility, Public Utility District No. 1 (PUD),
Columbia River, Chelan County, WA, Comment Period Ends: 11/08/2005,
Contact: Kim Nguyen 202-502-6105.
EIS No. 20050362, Draft EIS, NRC, NC, Generic--Brunswick Stream
Electric Plant, Units 1 and 2 (TAC Nos. MC4641 and MC4642) License
Renewal of Nuclear Plants, Supplement 25 to NUREG-1437, Brunswick
County, NC, Comment Period Ends: 12/02/2005, Contact: Richard L. Emch
301-415-1590.
EIS No. 20050363, Final EIS, NPS, SC, NC, GA, FL, Low Country Gullah
Culture Special Resource Study, Gullah Culture Preservation and
Protection Analysis to Consider the Suitability and Feasibility for
Inclusion in the National Park Service System, SC, NC, GA and FL, Wait
Period Ends: 10/11/2005, Contact: John Barrett 404-562-3124 Ext 637.
EIS No. 20050364, Final EIS, FHW, IA, NE, Council Bluffs Interstate
System Improvements Project, Transportation Improvements, Missouri
River on I-80 to east of I-480 Interchange, Tier 1, Pottawattamie
County, IA and Douglas County, NE, Wait Period Ends: 10/11/2005,
Contact: Philip Barnes 515-233-7300.
EIS No. 20050365, Draft EIS, NRC, OH, American Centrifuge Plant, Gas
Centrifuge Uranium Enrichment Facility, Construction, Operation, and
Decommission, License Issuance, Piketon, OH, Comment Period Ends: 10/
24/2005, Contact: Matthew Blevins 301-415-7684.
EIS No. 20050366, Final EIS, FHW, AR, I-69 Section of Independent
Utility 13 El Dorado to McGehee, Construction of 4 Lane divided Access
Facility, U.S. Coast Guard Permit, U.S. Army COE Section 404 Permit,
Quachita River, Quachita, Union, Calhoun, Bradley, Drew, and Desha
Counties, AR, Wait Period Ends: 10/24/2005, Contact: Randal Looney 501-
324-6430.
EIS No. 20050367, Draft Supplement, NOA, ME, Atlantic Herring Fishery
Management Plan (FWP), Amendment 1, Management Measure Adjustment,
Implementation, Gulf of Maine, George Bank, ME, Comment Period Ends:
10/24/2005, Contact: Paul Howard 978-465-0492.
EIS No. 20050368, Draft EIS, IBR, NM, Carlsbad Project Water Operations
and Water Supply Conservation, Changes in Carlsbad Project Operations
and Implementation of Water Acquisition Program, U.S. COE Section 404
Permit, NPDES, Eddy, De Baca, Chaves, and Guadelupe Counties, NM,
Comment Period Ends:
[[Page 53658]]
10/31/2005, Contact: Marsha Carra 505-462-3602.
EIS No. 20050369, Final EIS, FHW, MD, MD-32 Planning Study,
Transportation Improvements from MD-108 to Interstate 70, Funding,
NPDES Permit and COE Section 404 Permit, Howard County, MD, Wait Period
Ends: 10/24/2005, Contact: Caryn Brookman 410-962-4440.
EIS No. 20050370, Draft EIS, AFS, OR, Middle Fork John Day Range
Planning Project, Livestock Grazing Authorization, Implementation, Blue
Mountain Ranger and Prairie City Ranger Districts, Malheur National
Forest, Grant County, OR Comment Period Ends: 10/24/2005, Contact:
Linda Batten 541-575-3000.
EIS No. 20050371, Draft EIS, FAA, UT, St. George Municipal Airport
Replacement, Funding, City of St. George, Washington County, UT Comment
Period Ends: 11/08/2005, Contact: David Field 425-227-2608.
Dated: September 6, 2005.
Ken Mittelholtz,
Environmental Protection Specialist, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05-17924 Filed 9-8-05; 8:45 am]
BILLING CODE 6560-50-P