[Federal Register: October 4, 2005 (Volume 70, Number 191)]
[Proposed Rules]
[Page 57850-57851]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr04oc05-36]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Federal Emergency Management Agency
44 CFR Part 67
[Docket No. FEMA-P-7903]
Proposed Flood Elevation Determinations
AGENCY: Federal Emergency Management Agency, Emergency Preparedness and
Response Directorate, Department of Homeland Security.
ACTION: Proposed rule.
-----------------------------------------------------------------------
SUMMARY: Technical information or comments are requested on the
proposed Base (1% annual-chance) Flood Elevations (BFEs) and proposed
BFE modifications for the communities listed below. The BFEs and
modified BFEs are the basis for the floodplain management measures that
the community is required either to adopt or to show evidence of being
already in effect in order to qualify or remain qualified for
participation in the National Flood Insurance Program (NFIP).
DATES: The comment period is ninety (90) days following the second
publication of this proposed rule in a newspaper of local circulation
in each community.
ADDRESSES: The proposed BFEs for each community are available for
inspection at the office of the Chief Executive Officer of each
community. The respective addresses are listed in the table below.
FOR FURTHER INFORMATION CONTACT: Doug Bellomo, P.E., Hazard
Identification Section, Emergency Preparedness and Response
Directorate, Federal Emergency Management Agency, 500 C Street, SW.,
Washington, DC 20472, (202) 646-2903.
SUPPLEMENTARY INFORMATION: The Federal Emergency Management Agency
makes the final determinations listed below for the modified BFEs for
each community listed. These modified elevations have been published in
newspapers of local circulation and ninety (90) days have elapsed since
that publication. The Mitigation Division Director of the Emergency
Preparedness and Response Directorate has resolved any appeals
resulting from this notification.
These proposed BFEs and modified BFEs, together with the floodplain
management criteria required by 44 CFR 60.3, are the minimum that are
required. They should not be construed to mean that the community must
change any existing ordinances that are more stringent in their
floodplain management requirements. The community may at any time enact
stricter requirements of its own, or pursuant to policies established
by other Federal, State, or regional entities. These proposed
elevations are used to meet the floodplain management requirements of
the NFIP and are also used to calculate the appropriate flood insurance
premium rates for new buildings built after these elevations are made
final, and for the contents in these buildings.
National Environmental Policy Act. This proposed rule is
categorically excluded from the requirements of 44 CFR Part 10,
Environmental Consideration. No environmental impact assessment has
been prepared.
Regulatory Flexibility Act. The Mitigation Division Director of the
Emergency Preparedness and Response Directorate certifies that this
rule is exempt from the requirements of the Regulatory Flexibility Act
because modified base flood elevations are required by the Flood
Disaster Protection Act of 1973, 42 U.S.C. 4105, and are required to
maintain community eligibility in the NFIP. No regulatory flexibility
analysis has been prepared.
Regulatory Classification. This proposed rule is not a significant
regulatory action under the criteria of Section 3(f) of Executive Order
12866 of September 30, 1993, Regulatory Planning and Review, 58 FR
51735.
Executive Order 12612, Federalism. This proposed rule involves no
policies that have federalism implications under Executive Order 12612,
Federalism, dated October 26, 1987.
Executive Order 12778, Civil Justice Reform. This proposed rule
meets the applicable standards of Section 2(b)(2) of Executive Order
12778.
List of Subjects in 44 CFR Part 67
Administrative practice and procedure, flood insurance, reporting
and record keeping requirements.
Accordingly, 44 CFR Part 67 is proposed to be amended as follows:
PART 67--[AMENDED]
1. The authority citation for Part 67 continues to read as follows:
Authority: 42 U.S.C. 4001 et seq.; Reorganization Plan No. 3 of
1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR,
1979 Comp., p. 376.
Sec. 67.4 [Amended]
2. The tables published under the authority of Sec. 67.4 are
proposed to be amended as follows:
------------------------------------------------------------------------
[sdiam]Elevation in
Source of flooding and feet (NAVD)
location of referenced ---------------------- Communities affected
elevation Existing Modified
------------------------------------------------------------------------
Little Cotton Indian Creek:
At the confluence with [sdiam] [sdiam] Henry County
Big Cotton Indian Creek. 654 655 (Unincorporated
Areas).
[[Page 57851]]
Approximately 1,000 feet [sdiam] [sdiam]
upstream of the confluence 654 655
with Big Cotton Indian
Creek.
-----------------------------
Unincorporated Areas of Henry County, Georgia:
Maps are available for inspection at the Community Map Repository, 140
Henry Parkway, McDonough, Georgia.
Send comments to Mr. Rob Magnaghi, Henry County Manager, 140 Henry
Parkway, McDonough, Georgia 30253.
------------------------------------------------------------------------
[sdiam] North American Vertical Datum.
(Catalog of Federal Domestic Assistance No. 83.100, ``Flood
Insurance.'')
Dated: September 26, 2005.
David I. Maurstad,
Acting Director, Mitigation Division, Emergency Preparedness and
Response Directorate.
[FR Doc. 05-19818 Filed 10-3-05; 8:45 am]
BILLING CODE 9110-12-P