[Federal Register: October 7, 2005 (Volume 70, Number 194)]
[Notices]
[Page 58699-58700]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr07oc05-52]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6668-1]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 09/26/2005 Through 09/30/2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050401, Draft Supplement, SFW, CA, Southern Sea Otters
(Enhydra lutris nereis) Translocation Program, New and Updated
Information, San Nicolas Island, Southern California Bight, CA, Comment
Period Ends: 01/05/2006, Contact: Greg Sander 805-644-1766 Ext. 315.
EIS No. 20050402, Final EIS, FHW, UT, Iron County Transportation
Corridors, Construction from Station Road 56 to Exit 51 on Interstate
15, Funding and Right-of-Way Grant, Southwest of the Cedar City Limits,
Iron County, UT, Wait Period Ends: 11/07/2005, Contact: Gregory S.
Punske 801-963-0182.
EIS No. 20050403, Final EIS, AFS, CA, Watdog Project, Proposes to
Reduce Fire Hazards, Harvest Trees, Using Group Selection Methods,
Feather River Ranger District, Plumas National Forest, Butte and Plumas
Counties, CA, Wait Period Ends: 11/07/2005, Contact: Susan Joyce 530-
532-6500.
EIS No. 20050404, Draft EIS, DOI, OH, First Ladies National Historic
Site General Management Plan, Implementation, Canton, OH, Comment
Period Ends: 11/30/2005, Contact: Nick Chevance 402-661-1844.
EIS No. 20050405, Draft EIS, NPS, NV, Clean Water Coalition Systems
Conveyance and Operations Program, Construction, Operation and
Maintenance, City of Las Vegas, City County, NV, Comment Period Ends:
12/06/2005, Contact: Michael Boyles 702-293-8978.
EIS No. 20050406, Draft EIS, FHW, WA, South Park Bridge Project,
Proposes to Rehabilitate or Replace the Historic South Park Ridge over
the Duwamish Waterway at 14th/16 Avenue S, U.S. Coast Guard Permit and
U.S. Army COE Section 10 and 404 Permits, King County, WA, Comment
Period Ends: , 11/21/2005, Contact: Jim Leonard 360-753-9408.
EIS No. 20050407, Final EIS, NPS, AZ, Saguaro National Park Fire
Management Plan, Implementation, Tucson, AZ, Wait Period Ends: 11/07/
2005, Contact: Sarah Craighead 520-733-5101.
EIS No. 20050408, Final EIS, FHW, WI, US 41 Highway Corridor Project,
Transportation Improvement between the Cities of Oconto and Perhtigo,
Funding, Marinette and Oconto Counties, WI, Wait Period Ends: 11/07/
2005, Contact: Johhny Gerbitz 608-829-7500.
EIS No. 20050409, Final EIS, AFS, OR, Joseph Creek Rangeland Analysis
Project, Proposal to Allocate Forage for Commercial Livestock Grazing
on Eleven Allotment, Wallowa-Whitman National Forests, Wallowa Valley
Ranger District, Wallowa County, OR, Wait Period Ends: 11/07/2005,
Contact: Alicia Glassford 541-426-5689.
EIS No. 20050411, Draft EIS, IBR, CA, Central Valley Project, West San
[[Page 58700]]
Joaquin Division, Long-Term Water Service Contract Renewal, Cities of
Avenal, Coalinga and Huron, Fresno, King and Merced Counties, CA,
Comment Period Ends: 11/25/2005, Contact: Joe Thompson 559-487-5179.
EIS No. 20050412, Final EIS, FHW, UT, US 6 Highway Project,
Improvements from Interstate 15 (I-15) in Spanish Fork to Interstate
(I-70) near Green River, Funding, Right-of-Way Permit and U.S. Army COE
Section 404 Permit, Utah, Wasatch, Carbon, Emery Counties, UT, Wait
Period Ends: 11/07/2005, Contact: Jeff Berna 801-963-0182.
EIS No. 20050413, Draft Supplement, FHW, NC, NC 12 Replacement of
Herbert C. Bonner Bridge (Bridge No. 11 ) New and Updated Information,
over Oregon Inlet Construction, Funding, U.S. Coast Guard Permit,
Special-Use-Permit, Right-of-Way Permit, U.S. Army COE Section 10 and
404 Permit, Dare County, NC , Comment Period Ends: 11/23/2005, Contact:
John F. Sullivan 919-856-4346.
EIS No. 20050414, Draft EIS, NRC, NY, Generic--License Renewal of
Nuclear Plants for Nine Mile Point Nuclear Station, Units 1 and 2,
Supplement 24 to NUREG 1437, Implementation, Lake Ontario, Oswego
County, NY, Comment Period Ends: 12/22/2005, Contact: Leslie C. Fields
301-415-1186.
EIS No. 20050415, Draft EIS, FRA, PA, Pennsylvania High-Speed Maglev
Project, Construction between Pittsburgh International Airport (PIA)
and Greensburg Area, The Pennsylvania Project of Magnetic Levitation
Transportation Technology Deployment Program, Allegheny and
Westmoreland Counties, PA, Comment Period Ends: 12/06/2005, Contact:
David Valenstein 202-493-6368.
EIS No. 20050416, Draft EIS, NOA, TX, PROGRAMMATIC--Texas National
Estuarine Research Reserve and Management Plan, Mission-Aransas
Estuary, Site Designation, Federal Approval, TX, Comment Period
Ends:11/23/2005, Contact: Laurie McGilvray 301-563-1158.
EIS No. 20050417, Final Supplement, COE, MD, Poplar Island
Environmental Restoration Project, Habitat Restoration and Dredged
Material Capacity, Chesapeake Bay, Talbot County, MD, Wait Period Ends:
11/07/2005, Contact: Mark Mendelsohn 410-962-9466.
Dated: October 4, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-20208 Filed 10-6-05; 8:45 am]
BILLING CODE 6560-50-P