[Federal Register: October 28, 2005 (Volume 70, Number 208)]
[Notices]
[Page 62107-62108]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr28oc05-35]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6668-7]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed October 17, 2005 Through October 21, 2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050439, Final EIS, COE, MS, Enhanced Evaluation of Cumulative
Effects Associated with U.S. Army Corps of Engineers Permitting
Activity for Large-Scale Development in Coastal Mississippi, Hancock,
Harrison, Jackson, and Mississippi Counties, MS, Wait Period Ends: 12/
27/2005, Contact: Dr. Susan I. Rees 251-694-4141.
EIS No. 20050440, Final EIS, SFW, AK, Alaska Peninsula and Becharof
National Wildlife Refuges, Revised Comprehensive Conservation Plan,
Implementation, AK, Wait Period Ends: 11/28/2005, Contact: Peter Wikoff
907-786-3837.
EIS No. 20050441, Draft EIS, COE, AK, Delong Mountain Terminal Project,
Proposed Construction and Operation of Navigation Improvements,
Northwest Arctic Borough, AK, Comment Period Ends: 12/27/2005, Contact:
Guy McConnell 907-753-2614.
EIS No. 20050442, Draft EIS, NOA, WV, Canaan Valley Institute Office
Complex, Proposes to Construct: Offices, Classrooms, Laboratories, 250-
Seat Auditorium, Parking Facilities, Outdoor Classrooms and
Interpretive Areas, U.S. Army COE Section 404 Permit, Southeast of the
Towns of Davis and Thomas, Tucker County, WV, Comment Period Ends: 12/
12/2005, Contact: Dr. Bruce B. Hicks 301-713-3318.
EIS No. 20050443, Final EIS, FHW, 00, US-159 Missouri River Crossing
Project, Rehabilitation or Replacement of the Missouri River Bridge at
Rulo, Funding and U.S. Army COE Section 404 Permit, Richardson County,
NE and Holt County, MO, Wait Period Ends: 11/28/2005, Contact: Ed
Kosola 402-437-5973.
EIS No. 20050444, Final Supplement, FTA, VA, Norfolk Light Rail Transit
System, from the western terminus near Eastern Virginia Medical Center
through Downtown Norfolk to an eastern terminus at Newtown Road and
Kempsville Road, Funding, U.S. COE Section 404 Permit, USCGD Bridge
Permit, City of Norfolk, VA, Wait Period Ends: 11/28/2005 Contact:
Patricia Kampf 215-656-7100.
EIS No. 20050445, Draft EIS, NPS, SD, Badlands National Park/North Unit
General Management Plan, Implementation, Jackson, Pennington and
Shananon Counties, SD, Comment Period Ends: 12/27/2005, Contact:
William Supernaugh 605-433-5281.
EIS No. 20050446, Draft EIS, USN, 00, Undersea Warfare Training Range
(USWTR), Installation and Operation, Preferred Site (in the Cherry
Point Operating Area) and the Alternate Sites ( within the Virginia
Capes and Jacksonville Operating Areas), NC, VA and FL, Comment Period
Ends: 12/12/2005, Contact: Keith Jenkins 757-322-4046.
EIS No. 20050447, Final EIS, FHW, OH, Eastern Corridor Multi-Modal
(Tier 1) Project, to Implement a Multi-Modal Transportation Program
between the City of Cincinnati and Eastern Suburbs in Hamilton and
Clermont Counties, OH, Wait Period Ends: 11/28/2005, Contact: Dennis A.
Decker 614-280-6896.
EIS No. 20050448, Draft EIS, BLM, MT, Upper Missouri River Breaks
National Monument Resource Management Plan, Implementation, Blaine,
Chouteau, Fergus and Phillips Counties, MT, Comment Period Ends: 01/26/
2005, Contact: Jerry Majerus 406-538-1924.
EIS No. 20050449, Final EIS, USN, FL, Navy Air-To-Ground Training at
Avon Park Air Force Range, To Conduct Air-To-Ground Ordnance Delivery
and Training, Fleet Forces Command's Fleet Readiness Training Program
(FRTP), Polk and Highland Counties, FL, Wait Period Ends: 11/28/2005,
Contact: Will Sloger 843-820-5797.
Amended Notices
EIS No. 20050334, Final EIS, DOE, MT, South Fork Flathead Watershed
Westslope Cutthroat Trout Conservation Program, Preserve the Genetic
Purity of the Westslope Cutthroat Trout Population, Flathead National
Forest, Flathead River, Flathead, Powell and Missoula Counties, MT,
Wait Period Ends: 12/12/2005, Contact: Colleen Spiering 503-230-5756.
Revision of FR Notice Published on 08/19/2005: Reopened the Wait Period
from 09/19/2005 to 12/12/2005.
[[Page 62108]]
Dated: October 25, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-21544 Filed 10-27-05; 8:45 am]
BILLING CODE 6560-50-P