[Federal Register: November 10, 2005 (Volume 70, Number 217)]
[Notices]
[Page 68443]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr10no05-118]
[[Page 68443]]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6669-02]
Environmental Impacts Statements; Notice Of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 10/31/2005 Through 11/04/2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050457, Final EIS, IBR, CA, Lake Berryessa Visitor Services
Plans, Future Use and Operation, Solano Project Lake Berryessa, Napa
County, CA, Wait Period Ends: 12/09/2005, Contact: Peter Lucero 707-
966-2111 Ext 106.
EIS No. 20050458, Final EIS, AFS, SD, Deerfield Project Area, Proposes
to Implement Multiple Resource Management Actions, Mystic Ranger
District, Black Hills National Forest, Pennington County, SD, Wait
Period Ends: 12/09/2005, Contact: Robert Thompson 605-343-1567.
EIS No. 20050459, Draft EIS, BLM, 00, Programmatic--Vegetation
Treatments Using Herbicides on Bureau of Land Management Public Lands
in 17 Westerns, including Alaska, Comment Period Ends: 01/09/2006,
Contact: Brian Amme 775-861-6645.
EIS No. 20050460, Draft Supplement, USN, 00, Surveillance Towed Array
Sensor System Low Frequency Active (SURTASS LFA) Sonar Systems, Updated
and Additional Information, Implementation, Comment Period Ends: 12/27/
2005, Contact: J.S. Johnson 703-465-8404.
EIS No. 20050461, Final EIS, AFS, WY, Bighorn National Forest Revised
Land and Resource Management Plan, Implementation, Big Horn Mountain
Range, Bighorn National Forest, Johnson, Sheridan, Bighorn, and
Washakie Counties, WY, Wait Period Ends: 12/09/2005, Contact: Bernie
Bornong 307-674-2685.
EIS No. 20050462, Draft EIS, IBR, CA, South Delta Improvements Program,
To Improve Water Quality, Water Conveyance, and Fish Habitat
Conditions, Central Valley Project, U.S. Army COE Section 404 Permit,
South Sacramento-San Joaquin River Delta, Several Counties, CA, Comment
Period Ends: 02/07/2006, Contact: Sharon McHale 916-978-5086.
EIS No. 20050463, Final EIS, BLM, NV, North Valleys Rights-of-Way
Projects, Proposed Construction and Operation of Water Transmission
Pipelines, Washoe County, NV, Wait Period Ends: 12/09/2005, Contact:
Terri Knutson 775-885-6156.
EIS No. 20050464, Final EIS, AFS, 00, Quachita National Forest,
Proposed Revised Land Resource Management Plan, Implementation, Several
Counties, AR; and LeFlore and McCurtain Counties, OK, Wait Period Ends:
12/09/2005, Contact: Bill Pell 501-321-5320.
EIS No. 20050465, Final Supplement, FHW, UT, Legacy Parkway Project,
Construction from 1-215 at 2100 North in Salt Lake City to 1-15 and US-
89 near Farmington, Updated Information, Funding and U.S. Army COE
Section 404 Permit, Salt Lake and Davis Counties, UT, Wait Period Ends:
12/09/2005, Contact: Gregory Punske, P.E. 801-963-0182.
EIS No. 20050466, Final EIS, COE, NJ, Liberty State Park Ecosystem
Restoration Project, Hudson Raritan Estuary Study, To Address the
Adverse Impacts Associated with Past Filling Activities, Port Authority
of New and New Jersey City, Hudson County, NJ, Wait Period Ends: 12/09/
2005, Contact: Mark Matusiak 202-761-5909.
EIS No. 20050467, Final EIS, COE, NY, Montuak Point Storm Damage
Reduction Project, Proposed Reinforcement of an Existing Stone
Revetment Wall, Suffolk County, NY, Wait Period Ends: 12/09/2005,
Contact: Lee Ware 202-761-4242.
EIS No. 20050468, Draft EIS, EPA, CA, Regional Non-Potable Water
Distribution System Project, Funding, US Army COE Section 404 Permit,
Riverside and San Bernardino Counties, CA, Comment Period Ends: 12/28/
2005, Contact: Elizabeth Borowiec 415-972-3419.
EIS No. 20050469, Draft EIS, NOA, 00, PROGRAMMATIC--Towards an
Ecosystem Approach for the Western Pacific Region: From Species Based
Fishery Management Plans to Place-Based Fishery Ecosystem Plans,
Realignment, Implementation, Western Pacific Region (America Samoa,
Guam, Hawaii, Commonwealth of the Northern Mariana Islands), and US
Pacific Remote Island Areas, Comment Period Ends: 12/26/2005, Contact:
William L. Robinson 808-944-2200. This document is available on the
Internet at: http://swr.nmfs.noaa.gov/pir.
EIS No. 20050470, Final EIS, NPS, AZ, Colorado River Management Plan,
Analyzing Alternatives for Management of Recreational Use of the
Colorado River, Grand Canyon National Park, Coconino County, AZ, Wait
Period Ends: 12/09/2005, Contact: Rick Ernenwein 928-779-6279.
Amended Notices
EIS No. 20050397, Draft EIS, BIA, ID, Programmatic--Coeur d' Alene
Tribe Integrated Resource Management Plan, Implementation, Coeur d'
Alene Reservation and Aboriginal Territory, ID, Comment Period Ends:
12/14/2005, Contact: Tiffany Allgood 208-686-8802.
Revision of Federal Register Notice Published on 09/30/2005:
Comment Period Extended from 11/14/2005 to 12/14/2005.
EIS No. 20050454, Draft EIS, FRC, 00, Cove Point Expansion Project,
Construction and Operation of a Liquefied Natural Gas (LNG) Import
Terminal Expansion and Natural Gas Pipeline Facilities, US. Army COE
Section 404 Permit, Docket Nos. CPO5-130-000, CP05-131-000 and CP05-
132-00, PA, VA, WV, NY and MD, Comment Period Ends: 12/21/2005,
Contact: Thomas Russo 1-866-208-3372.
Revision of Federal Register Notice Published 11/04/2005:
Correction to Document Status from Final to Draft EIS.
Dated: November 7, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-22467 Filed 11-9-05; 8:45 am]
BILLING CODE 6560-50-P