[Federal Register: November 18, 2005 (Volume 70, Number 222)]
[Notices]
[Page 69967-69968]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr18no05-49]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6669-04]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed November 7, 2005 Through November 10, 2005.
Pursuant to 40 CFR 1506.9.
EIS No. 20050471, Draft EIS, AFS, WY, Moose-Gypsum Project, Proposes to
Authorize Vegetation Treatments, Watershed Improvements, and Travel
Plan and Recreation Updates, Pinedale Ranger District, Bridger-Teton
National Forest, Sublette County, WY, Comment Period Ends:
January 3, 2006, Contact: Craig Trulock 307-367-4326.
EIS No. 20050472, Second Draft Supplement, AFS, CO, Sheep Flats
Diversity Unit, Timber Sales and Related Road Construction, Additional
Information Regarding Wildlife Resources, Grand Mesa Uncompahgre and
Gunnison National Forests, Grand Valley Ranger District, Mesa County,
CO, Comment Period Ends: January 3, 2006, Contact: Carol McKenzie 208-
634-0761.
EIS No. 20050473, Draft EIS, COE, MT, Upper Columbia Alternative Flood
Control and Fish Operations, Implementation, Libby and Hungry Horse
Dams, Columbia River Basin, MT, Comment Period Ends: January 3, 2006,
Contact: Evan Lewis 206-764-6922.
EIS No. 20050474, Final EIS, COE, CA, Mare Island Reuse of Dredged
Material Disposal Ponds as a Confirmed Updated Dredged Material
Disposal Facility, Issuing Section 404 Permit Clean Water Act and
Section 10 Permit Rivers and Harbor Act, San Francisco Bay Area, City
of Vallejo, Solando County, CA , Wait Period Ends: December 19, 2005,
Contact: Robert J. Lawrence 415-977-8020.
EIS No. 20050475, Final EIS, AFS, NM, Invasive Plant Control Project,
Protection of the Abundance and Biological Diversity of Desired Native
Plant, Carson National Forest and Santa Fe National Forest, Rio Arriba,
Colfax, Los Alamos, Mora, San Miguel and Santa Fe Counties, NM, Wait
Period Ends: December 19, 2005, Contact: Sanford Hurlocker 505-753-
7331.
EIS No. 20050476, Final Supplement, AFS, AK, Emerald Bay Timber Sale,
Implementation, Additional Information on the Potential Effects of the
Project Alternatives, Ketchikan-Misty Fiords Ranger District, Tongass
National Forest, AK, Wait Period Ends: December 19, 2005, Contact: Rob
Reeck 907-228-4114.
EIS No. 20050477, Final EIS, COE, AZ, Santa Cruz River, Paseo de las
Iglesias Feasibility Study, To Identify, Define and Solve Environmental
Degradation, Flooding and Water Resource Problems, City of Tucson, Pima
County, AZ, Wait Period Ends: December 19, 2005, Contact: Michael J.
Fink 602-640-2001 Ext. 252.
EIS No. 20050478, Second Final EIS (Tiering), FHW, MO, Interstate 70
Corridor Improvements, Section of Independent Utility 4, from
Missouri Route BB Interchange to Eastern Columbia, Funding, Boone
County, MO, Wait Period Ends: December 19, 2005, Contact: Peggy Casey
573-636-7104.
EIS No. 20050479, Final EIS, SFW, 00, Resident Canada Goose Management
Plan, Evaluate Alternatives Strategies to Reduce, Manage, and Resident
Canada Goose Population, Implementation, within the Conterminous U.S.,
Wait Period Ends: December 19, 2005, Contact: Ron Kokel 703-358-1714.
EIS No. 20050480, Final EIS, NOA, CA, PROGRAMMATIC--Montrose
Settlements Restoration Plan, Restoration of Inquired Natural
Resources, Channel Islands, Southern California Bight, Baja California
Pacific Islands, Orange County, CA, Wait Period Ends: December 19,
2005, Contact: Greg Baker 301-713-1622.
This document is available on the Internet at: http://www.montrose.restoration.gov
.
EIS No. 20050481, Draft EIS, FTA, MO, St. Louis Metro South Metrolink
Extension, Transportation Improvement, City of St. Louis, St. Louis
County, MO, Comment Period Ends: January 6, 2006, Contact: Joan
Roeseler 816-329-3936.
EIS No. 20050482, Final EIS, AFS, WY, Cottonwood II Vegetation
Management Project, Vegetation Management in the North and South
Cottonwood Creek Drainages, Implementation, Bridger-Teton National
Forest, Big Piney Ranger District, Sublette County, WY, Wait Period
Ends: December 19, 2005, Contact: Jeff Laub 307-276-3375.
EIS No. 20050483, Draft Supplement, UAF, 00, Realistic Bomber Training
Initiative, Addressees Impacts of Wake Vortices on Surface Structures,
Dyess Air Force Base, TX and Barksdale Air Force Base, LA, Comment
Period Ends: January 3, 2006, Contact: Sheryl Parker 757-764-9334.
EIS No. 20050484, Draft EIS, COE, CA, American River Watershed, Lower
American River Common Features Mayhew Levee Project, Reconstruction,
Sacramento County, CA, Comment Period Ends: January 3, 2006, Contact:
Robert Koenigs 916-557-6712.
EIS No. 20050485, Final EIS, FRC, CA, Upper North Fork Feather River
[[Page 69968]]
Project (FERC No. 2105), Issuance of a New License for existing 3517.3
megawatt (MW) Hydroelectric Facility located in North Fork Feather
River and Butt Creek, Plumas County, CA, Wait Period Ends: December 19,
2005, Contact: Thomas Russo 1-866-208-3372.
This document is available on the Internet at: http://www.ferc.gov.
Dated: November 15, 2005.
Elaine Suriano,
Environmental Scientist, Office of Federal Activities.
[FR Doc. 05-22888 Filed 11-17-05; 8:45 am]
BILLING CODE 6560-50-P