[Federal Register: November 21, 2005 (Volume 70, Number 223)]
[Notices]
[Page 70070]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr21no05-36]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[OE Docket No. EA-280-A]
Application to Export Electric Energy; Direct Energy Marketing
Inc.
AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.
ACTION: Notice of application.
-----------------------------------------------------------------------
SUMMARY: Direct Energy Marketing Inc. (DEMI) has applied to renew its
authority to transmit electric energy from the United States to Canada
pursuant to section 202(e) of the Federal Power Act.
DATES: Comments, protests or requests to intervene must be submitted on
or before December 6, 2005.
ADDRESSES: Comments, protests or requests to intervene should be
addressed as follows: Office of Electricity Delivery and Energy
Reliability, Mail Code: OE-20, U.S. Department of Energy, 1000
Independence Avenue, SW., Washington, DC 20585-0350 (FAX 202-586-5860).
FOR FURTHER INFORMATION CONTACT: Ellen Russell (Program Office) 202-
586-9624 or Michael Skinker (Program Attorney) 202-586-2793.
SUPPLEMENTARY INFORMATION: Exports of electricity from the United
States to a foreign country are regulated and require authorization
under section 202(e) of the Federal Power Act (FPA) (16 U.S.C.
824a(e)).
On November 5, 2003, the Department of Energy (DOE) issued Order
No. EA-280 authorizing DEMI to export electric energy from the United
States to Canada for a period of two years. On November 4, 2005, DEMI
applied to DOE to renew its export authority for a five-year period.
DEMI proposes to export electric energy to Canada and to arrange for
the delivery of those exports over the international transmission
facilities presently owned by Basin Electric Power Cooperative,
Bonneville Power Administration, Eastern Maine Electric Cooperative,
International Transmission Co., Joint Owners of the Highgate Project,
Long Sault, Inc., Maine Electric Power Company, Maine Public Service
Company, Minnesota Power, Inc., Minnkota Power Cooperative, Inc., New
York Power Authority, Niagara Mohawk Power Corp., Northern States Power
Company and Vermont Electric Transmission Co.
The construction, operation, maintenance, and connection of each of
the international transmission facilities to be utilized by DEMI have
previously been authorized by a Presidential permit issued pursuant to
Executive Order 10485, as amended.
DEMI has requested expedited consideration of this application in
order to minimize the disruption of its electricity trade with Canadian
entities. In response to this request, DOE has shortened the public
comment period to 15 days.
Procedural Matters
Any person desiring to become a party to this proceeding or to be
heard by filing comments or protests to this application should file a
petition to intervene, comment or protest at the address provided above
in accordance with Sec. Sec. 385.211 or 385.214 of the FERC's Rules of
Practice and Procedures (18 CFR 385.211, 385.214). Fifteen copies of
each petition and protest should be filed with the DOE on or before the
dates listed above.
Comments on the DEMI application to export electric energy to
Canada should be clearly marked with Docket EA-280-A. Additional copies
are to be filed directly with James D. Steffes, Vice President,
Government Affairs and Regulatory Affairs, Direct Energy, L.P., 12
Greenway Plaza, Suite 600, Suite 600, Houston, TX 77046 and Douglas W.
Smith and Vincenzo Franco, Van Ness Feldman, P.C., 1050 Thomas
Jefferson St., NW., Seventh Floor, Washington, DC 20007-3877.
A final decision will be made on this application after the
environmental impacts have been evaluated pursuant to the National
Environmental Policy Act of 1969, and a determination is made by the
DOE that the proposed action will not adversely impact on the
reliability of the U.S. electric power supply system.
Copies of this application will be made available, upon request,
for public inspection and copying at the address provided above or by
accessing the program's Home Page at http://www.fe.doe.gov. Upon
reaching the Home page, select ``Electricity Regulation,'' and then
``Pending Proceedings'' from the options menus.
Issued in Washington, DC, on November 15, 2005.
Anthony J. Como,
Director, Permitting and Siting , Office of Electricity Delivery and
Energy Reliability.
[FR Doc. 05-23003 Filed 11-18-05; 8:45 am]
BILLING CODE 6450-01-P