[Federal Register: February 15, 2005 (Volume 70, Number 30)]
[Rules and Regulations]
[Page 7653]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr15fe05-5]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD01-05-007]
Drawbridge Operation Regulations: Fore River, ME
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the drawbridge operation regulations for the
Casco Bay Bridge, mile 1.5, across the Fore River between Portland and
South Portland, Maine. Under this temporary deviation, from February
28, 2005 through March 4, 2005, bridge openings between the hours of 6
a.m. and 6 p.m. will require a 24-hour advance notice. The bridge will
open on signal at all other times. This temporary deviation is
necessary to facilitate mechanical repairs at the bridge.
DATES: This deviation is effective from February 28, 2005 through March
4, 2005.
FOR FURTHER INFORMATION CONTACT: John McDonald, Project Officer, First
Coast Guard District, at (617) 223-8364.
SUPPLEMENTARY INFORMATION: The Casco Bay Bridge has a vertical
clearance in the closed position of 55 feet at mean high water and 64
feet at mean low water. The existing drawbridge operation regulations
are listed at 33 CFR 117.5.
The bridge owner, Maine Department of Transportation, requested a
temporary deviation from the drawbridge operation regulations to
facilitate scheduled mechanical maintenance, span lock repairs, at the
bridge.
Under this temporary deviation from February 28, 2005 through March
4, 2005, bridge openings between the hours of 6 a.m. and 6 p.m. will
require a 24-hour advance notice. The bridge will open on signal at all
other times.
This deviation from the operating regulations is authorized under
33 CFR 117.35, and will be performed with all due speed in order to
return the bridge to normal operation as soon as possible.
Dated: January 31, 2005.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 05-2870 Filed 2-14-05; 8:45 am]
BILLING CODE 4910-15-P