[Federal Register: April 22, 2005 (Volume 70, Number 77)]
[Notices]               
[Page 20900]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr22ap05-59]                         

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6662-6]

 
Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.

    Weekly receipt of Environmental Impact Statements filed April 14, 
2005, through April 15, 2005, pursuant to 40 CFR 1506.9.

EIS No. 20050152, Final EIS, AFS, MT, Snow Talon Fire Salvage Project, 
Proposes to Salvage Harvest Trees Burned in the Fire, Helena National 
Forest, Lincoln Ranger District, Lewis and Clark County, MT, Wait 
Period Ends: 05/23/2005, Contact: Dan Seifert 406-362-4265.
EIS No. 20050153, Final EIS, FHW, UT, Southern Corridor Construction, 
I-15 at Reference Post 2 in St. George to UT-9 near Hurricane, Funding, 
Right-of-Way Grant and U.S. Army COE Section 404 Permit Issuance, St. 
George, Washington and Hurricane, Washington County, UT, Wait Period 
Ends: 05/23/2005, Contact: Gregory Punske 801-963-0182.
EIS No. 20050154, Draft EIS, COE, DC, Washington Aqueduct's Project, 
Proposed Waster Treatment Residuals Management Process, NPDES Permit, 
Dalecarlia and McMillan Water Treatment Plants, Potomac River, 
Washington, DC, Comment Period Ends: 06/06/2005, Contact: Michael 
Peterson 202-764-0025.
EIS No. 20050155, Final EIS, AFS, OR, Plentybob Ecosystem Restoration 
Project, Restoration Activities Include: Prescribed Fire, Timber 
Harvest, Road Obliteration, Hardwood Planting and Noxious Weed 
Treatment, Implementation, Walla Walla Ranger District, Umatilla 
National Forest, Umatilla County, OR, Wait Period Ends: 05/23/2005, 
Contact: Glen Westlund 509-522-6009.
EIS No. 20050156, Final EIS, IBR, CA, Folsom Dam Road Access 
Restriction Project, Control Access to Folsom Dam, City of Folsom, CA, 
Wait Period Ends: 05/23/2005, Contact: Robert Schroeder 916-989-7274.
EIS No. 20050157, Draft EIS, AFS, MT, Middle East Fork Hazardous Fuel 
Reduction Project, Implementation of Three Alternatives, Bitterroot 
National Forest, Sula Ranger District, Ravalli County, MT, Comment 
Period Ends: 06/06/2005, Contact: Tracy Hollingshead 406-821-3201.
EIS No. 20050158, Draft EIS, AFS, ID, Aspen Range Timber Sale and 
Vegetation Treatment Project, Proposal to Treat Forested and 
Nonforested Vegetation, Caribou-Targhee National Forest, Soda Springs 
Ranger District, Caribou County, ID, Comment Period Ends: 06/06/2005, 
Contact: Doug Heyrend 208-547-4356.
EIS No. 20050159, Final EIS, NIH, MD, National Institutes of Health 
(NIH) Master Plan 2003 Update, National Institutes of Health Main 
Campus--Bethesda, MD, Montgomery County, MD, Wait Period Ends: 05/23/
2005, Contact: Ron Wilson 301-496-5037.
EIS No. 20050160, Draft EIS, AFS, ID, Three Basins Timber Sale Project, 
Proposal to Treat 760 Acres of Mature Forest, Implementation, Caribou-
Targhee National Forest, Montpellier Ranger District, Bearlake and 
Caribou Counties, ID, Comment Period Ends: 06/06/2005, Contact: Ken 
Klingenberg 208-847-0375.
EIS No. 20050161, Final EIS, AFS, OR, Rogue River-Siskiyou National 
Forest, Special Use Permits for Outfitter and Guide Operations on the 
Lower Rogue and Lower Rogue and Lower Illinois Rivers, Gold Beach 
Ranger District, Rogue River-Siskiyou National Forest, Curry County, 
OR, Wait Period Ends: 05/23/2005, John Borton 541-247-3640.
EIS No. 20050162, Draft EIS, CGD, 00, Pearl Crossing Liquefied Natural 
Gas (LNG) Deepwater Port Terminal and Pipeline Project, Proposes to 
Construct a Liquefied Natural Gas (LNG) Receiving, Storage, and 
Regasification Facility, Gulf of Mexico, Cameron and Calcasieu 
Parishes, LA and San Patricio County, TX, Comment Period Ends: 06/07/
2005, Contact: Lt. Ken Kusano 202-267-1184.
EIS No. 20050163, Draft Supplement, STB, SD, Powder River Basin 
Expansion Project, New Information on SEA's Independent Analyses Four 
Issues Remanded by the ``8'' Circuit Court of Appeals, Finance Docket 
No. 33407--Dakota, Minnesota, Eastern Railroad, SD, WY and MN, Due: 06/
06/2005, Contact: Victoria Rutson 202-565-1545.
EIS No. 20050164, Final EIS, FRC, TX, Vista del Sol Liquefied Natural 
Gas (LNG) Terminal Project, Construct, Install and Operate and LNG 
Terminal and Natural Gas Pipeline Facilities, Vista del Sol LNG 
Terminal LP and Vista del Sol Pipeline LP, TX, Wait Period Ends: 05/23/
2005, Contact: Joyce Turner 202-502-8584.

    Dated: April 20, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-8114 Filed 4-21-05; 8:45 am]

BILLING CODE 6560-50-P