[Federal Register: April 8, 2005 (Volume 70, Number 67)]
[Notices]               
[Page 17991-17992]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr08ap05-49]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12462-000]

 
Indian River Power Supply, LLC; Notice of Application Ready for 
Environmental Analysis, and Soliciting Comments, Terms and Conditions, 
Recommendations, and Prescriptions

March 31, 2005.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: 5-MW Exemption.
    b. Project No.: 12462-000.
    c. Date Filed: July 28, 2003.
    d. Applicant: Indian River Power Supply, LLC.
    e. Name of Project: Indian River.
    f. Location: On the Westfield River, in the Town of Russell, 
Hampden County, Massachusetts.
    g. Filed Pursuant to: Public Utility Regulatory Policies Act of 
1978, 16 U.S.C. 2705, 2708.
    h. Applicant Contact: Peter B. Clark, P.O. Box 149, Hamilton, 
Massachusetts 01936.
    i. FERC Contact: Michael Spencer, (202) 502-6093, 
michael.spencer@ferc.gov.
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions is 60 days from the issuance of this 
notice; reply comments are due 105 days from the issuance date of this 
notice.
    All Documents (Original and Eight Copies) Should be Filed With: 
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426.

[[Page 17992]]

    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    Comments, recommendations, terms and conditions, and prescriptions 
may be filed electronically via the Internet in lieu of paper. The 
Commission strongly encourages electronic filings. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
(http://www.ferc.gov) under the ``eFiling'' link.

    k. This application has been accepted and is now ready for 
environmental analysis.
    l. Description of Project: The Indian River Project would consist 
of: (1) The existing 30-foot-high, 425-foot-long Russell dam with 
flashboards; (2) a 14.11 acre reservoir; (3) a rackhouse for intake of 
the reservoir flow; (4) two 7-foot-diameter, 60-foot-long penstocks; 
(5) a powerhouse containing two generating units with a combined 
capacity of 700 kW and an estimated average annual generation of 3.2 
GWh; (6) a 60-foot-long tailrace; (7) a 400-foot-long transmission 
line; and (8) appurtenant facilities.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 

link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for 
inspection and reproduction at the address in item h above.
    All filings must (1) bear in all capital letters the title 
``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND 
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person submitting the filing; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. Each filing must be 
accompanied by proof of service on all persons listed on the service 
list prepared by the Commission in this proceeding, in accordance with 
18 CFR 4.34(b), and 385.2010.
    You may also register online at  http://www.ferc.gov/docs-filing/esubscription.asp
 to be notified via email of new filings and issuances 

related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Procedural Schedule: The Commission staff proposes to issue one 
Environmental Assessment (EA) rather than issuing a draft and final EA. 
Staff intends to allow 30 days for entities to comment on the EA, and 
will take into consideration all comments received on the EA before 
final action is taken on the exemption application. The application 
will be processed according to the schedule, but revisions to the 
schedule may be made as appropriate:

------------------------------------------------------------------------
                  Action                                Date
------------------------------------------------------------------------
Notice availability of EA.................   Aug. 2005.
Ready for Commission Decision on             Nov. 2005.
 Application.
------------------------------------------------------------------------


Magalie R. Salas,
Secretary.