[Federal Register: April 28, 2005 (Volume 70, Number 81)]
[Notices]
[Page 22023-22026]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr28ap05-60]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER01-1527-006, et al.]
Sierra Pacific Power Company, et al.; Electric Rate and Corporate
Filings
April 20, 2005.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. Sierra Pacific Power Company; Nevada Power Company
[Docket Nos. ER01-1527-006 and ER01-1529-006]
Take notice that on March 3, 2005, Sierra Pacific Power Company and
Nevada Power Company (collectively, Sierra) submitted a response to
recent Commission staff inquiries regarding Sierra's triennial market
power study filed October 28, 2004, as supplemented on November 12,
2004.
Comment Date: 5 p.m. eastern time on May 2, 2005.
2. Somerset Windpower, LLC
[Docket Nos. ER01-2139-006 and ER05-661-001]
Take notice that, on April 15, 2005, Somerset Windpower, LLC
(Somerset) filed a supplement to its February 28, 2005 filing in Docket
Nos. ER01-2139-005 and ER05-661-000.
Somerset states that copies of the filing were served on parties on
the official service list for Docket Nos. ER01-2139 and ER05-661 and on
the Florida Public Service Commission.
Comment Date: 5 p.m. eastern time on April 22, 2005.
3. Midwest Independent Transmission System Operator, Inc.
[Docket Nos. ER04-691-035 and EL04-104-033]
Take notice that on April 14, 2005 the Midwest Independent
Transmission System Operator, Inc. (Midwest ISO) submitted its errata
filing to its April 6, 2005 filing in Docket Nos. ER04-691-034 and
EL04-104-032. The Midwest ISO requests an effective date of April 1,
2005 for the tariff sheets submitted as part of this filing.
The Midwest ISO states that it has electronically served a copy of
this filing, with attachments, upon all Midwest ISO Members, Member
representatives of Transmission Owners and Non-Transmission Owners, the
Midwest ISO Advisory Committee participants, as well as all State
commissions within the region. In addition, the Midwest ISO states that
the filing has been electronically posted on the Midwest ISO's Web site
at http://www.midwestiso.org under the heading ``Filings to FERC'' for
other interested parties in this matter. The Midwest ISO indicates that
it will provide hard copies to any interested parties upon request.
Comment Date: 5 p.m. eastern time on May 5, 2005.
4. Georgia Power Company
[Docket Nos. ER05-282-001 and ER04-939-002]
Take notice that on April 14, 2005, Georgia Power Company (Georgia
Power) resubmitted the Control Area Compact by and among Georgia Power
Company, Oglethorpe Power Corporation, and Georgia System Operations
Corporation (Control Area Compact), accepted by the Commission's letter
order issued January 27, 2005 in the above captioned dockets, to
reflect a rate schedule designation and other information in accordance
with section 35.9 of the Commission's regulations, 18 CFR 35.9 (2004).
Georgia Power Company also submitted a Notice of Termination of the
Revised and Restated Coordination Services Agreement Between and Among
Georgia Power Company, Oglethorpe Power Corporation, and Georgia System
Operations Corporation, which has been supplanted by the Control Area
Compact.
Comment Date: 5 p.m. eastern time on May 5, 2005.
5. Saracen Energy LP
[Docket No. ER05-493-001]
Take notice that on April 14, 2005, Saracen Energy LP (Saracen
Energy) submitted a compliance filing pursuant to the Commission's
March 24, 2005 order in this proceeding, 110 FERC ] 61,332 (2005).
Saracen Energy states that the compliance filing consists of an
amendment to Saracen Energy's Rate Schedule FERC No. 1 to reflect the
change-in-status reporting requirement adopted in Order No. 652,
Reporting Requirement for Change in Status for Public Utilities with
Market-Based Rate Authority, 110 FERC ] 61,097 (2005).
Saracen Energy states that copies of the filing were served on
parties on the official service list in the above-captioned proceeding.
Comment Date: 5 p.m. eastern time on May 5, 2005.
6. Saracen Energy Power Advisors LP
[Docket No. ER05-494-001]
Take notice that on April 14, 2005, Saracen Energy Power Advisors
LP (Saracen Power Advisors) submitted a compliance filing pursuant to
the Commission's March 24, 2005 order in this proceeding, 110 FERC ]
61,332 (2005). Saracen states that the compliance filing consists of an
amendment to Saracen Power Advisors's Rate Schedule FERC No. 1 to
reflect the change-in-status reporting requirement adopted in Order No.
652, Reporting Requirement for Change in Status for Public Utilities
with Market-Based Rate Authority, 110 FERC ] 61,097 (2005).
Saracen Power Advisors states that copies of the filing were served
on parties on the official service list in the above-captioned
proceeding.
Comment Date: 5 p.m. eastern time on May 5, 2005.
7. Saracen Merchant Energy LP
[Docket No. ER05-495-001]
Take notice that, on April 14, 2005, Saracen Merchant Energy LP
(Saracen Merchant) submitted a compliance filing pursuant to the
Commission's March 24, 2005 order in this proceeding, 110 FERC ] 61,332
(2005). Saracen Merchant states that the
[[Page 22024]]
compliance filing consists of an amendment to Saracen Merchant's Rate
Schedule FERC No. 1 to reflect the change-in-status reporting
requirement adopted in Order No. 652, Reporting Requirement for Change
in Status for Public Utilities with Market-Based Rate Authority, 110
FERC ] 61,097 (2005).
Saracen Merchant states that copies of the filing were served on
parties on the official service list in the proceeding.
Comment Date: 5 p.m. eastern time on May 5, 2005.
8. Wabash Valley Power Association, Inc.
[Docket No. ER05-814-000]
Take notice that on April 13, 2005, Wabash Valley Power
Association, Inc. (Wabash Valley) submitted Wabash Valley Rate Schedule
Nos. 33 through 47 and a request for certain waivers of the
Commission's regulations.
Wabash Valley states that copies of the filing were served upon
Wabash Valley's Members, AES Power, Inc., American Municipal Power-
Ohio, Inc., Big Rivers Electric Corporation, Cincinnati Gas and
Electric Company, Central Illinois Public Service Company, Indiana
Municipal Power Agency, Hoosier Energy Rural Electric Cooperative,
Southern Indiana Gas and Electric Company, PSI Energy, Inc., Cinergy
Services, Inc., Ontario Power Generation, Inc., Soyland Power
Cooperative, Inc., Illinois Municipal Electric Agency, Louisville Gas
and Electric Company, Indianapolis Power & Light Company, Northern
Indiana Public Service Company, and the State public service
commissions in Illinois, Indiana, Michigan and Ohio.
Comment Date: 5 p.m. eastern time on May 4, 2005.
9. PJM Interconnection, L.L.C.
[Docket No. ER05-815-000]
Take notice that on April 13, 2005, PJM Interconnection, L.L.C.
(PJM) submitted for filing an executed interconnection service
agreement (ISA) among PJM, PSEG Nuclear LLC, Public Service Electric
and Gas Company and Atlantic City Electric Company, and a notice of
cancellation for an ISA that has been superseded. PJM requests an
effective date of March 14, 1005.
PJM states that copies of this filing were served upon the parties
to the agreement and the State regulatory commissions within the PJM
region.
Comment Date: 5 p.m. eastern time on May 4, 2005.
10. CES Marketing VI, LLC , CES Marketing VII, LLC, CES Marketing VIII,
LLC, CES Marketing IX, LLC, CES Marketing X, LLC
[Docket Nos. ER05-816-000, ER05-817-000, ER05-818-000, ER05-819-000,
and ER05-820-000]
Take notice that on April 13, 2005, CES Marketing VI, LLC, CES
Marketing VII, LLC, CES Marketing VIII, LLC, CES Marketing IX, LLC and
CES Marketing X, LLC (Applicants) submitted: (1) proposed rate
schedules under which Applicants will make wholesale sales of electric
energy, capacity, replacement reserves, and ancillary services at
market-based rates, to reassign transmission capacity, and to resell
firm transmission rights; (2) requests for the grant of certain blanket
approvals; (3) and requests for the grant of certain waivers.
Comment Date: 5 p.m. eastern time on May 4, 2005.
11. Pastoria Energy Facility, L.L.C.
[Docket No. ER05-822-000]
Take notice that on April 14, 2005, Pastoria Energy Facility,
L.L.C. (Pastoria) submitted: (1) Notification of a change in the name
of the company from Pastoria Energy Center, LLC to Pastoria Energy
Facility, L.L.C.; and (2) a revised market-based rate tariff to provide
the correct name of the company and to incorporate the reporting
requirements adopted by the Commission in Order No. 652, Reporting
Requirements for Changes in Status for Public Utilities with Market-
Based Rate Authority, 110 FERC ] 61,097 (2005).
Pastoria states that a copy of this filing has been mailed to each
person designated on the official service list compiled by the
Secretary of this proceeding.
Comment Date: 5 p.m. eastern time on May 5, 2005.
12. Florida Power & Light Company
[Docket No. ER05-823-000]
Take notice that on April 14, 2005, Florida Power & Light Company
(FPL) tendered for filing a Notice of Cancellation of Service Agreement
No. 196, an Interconnection & Operation Agreement between FPL and Blue
Heron Energy Center, LLC (Blue Heron). FPL states that the Cancellation
of Service Agreement No. 196 has been mutually agreed to by FPL and
Blue Heron. FPL requests that the cancellation be made effective March
21, 2005.
FPL states that a copy of the filing was served upon Blue Heron.
Comment Date: 5 p.m. eastern time on May 5, 2005.
13. American Electric Power Service Corporation
[Docket No. ER05-824-000]
Take notice that on April 14, 2004, American Electric Power Service
Corporation (AEPSC), tendered for filing a Interconnection and Local
Delivery Service Agreement (ILDSA) for Wabash Valley Power Association,
Inc. (Wabash Valley) of the Indianapolis, Indiana, and a Facilities
Agreement, as an attachment to the ILDSA, for the establishment of a
new Delivery Point (the Huntertown Delivery Point) between Wabash
Valley and AEP. The ILDSA is being designated and filed as Service
Agreement No. 1262 under the PJM Interconnection, LLC (PJM's) FERC Open
Access Transmission Tariff Sixth Revised Volume No. 1, pursuant to FERC
Order dated February 25, 2005 under Docket Nos. ER04-1003-002 et al.
and EL05-62-000. Service Agreement No. 1262 is needed to eliminate from
the Network Integration Transmission Service Agreement between AEP and
Wabash Valley those transmission related services that are now provided
by PJM. AEPSC requests an effective date of April 1, 2005.
AEPSC states that a copy of the filing was served upon Wabash
Valley and the Public Service Commissions affected by the filing.
Comment Date: 5 p.m. eastern time on May 5, 2005.
14. Midwest Independent Transmission System Operator, Inc.
[Docket No. ER05-825-000]
Take notice that on April 15, 2005, Midwest Independent
Transmission System Operator, Inc., (Midwest ISO) pursuant to section
205 of the Federal Power Act and section 35.13 of the Commission's
regulations, 18 CFR 35.13 (2002), submitted for filing revisions to
Exhibit A and Exhibit B of the Network Integration Transmission Service
Agreement under the Midwest ISO's Open Access Transmission Tariff, FERC
Electric Tariff, Second Revised Volume No. 1, between the City of St.
Louis, Michigan and the Midwest ISO.
Midwest ISO states that a copy of this filing has been served on
all parties on the official service list compiled by the Secretary in
this proceeding.
Comment Date: 5 p.m. eastern time on May 6, 2005.
15. Consolidated Edison Company of New York, Inc.
[Docket No. ER05-826-000]
Take notice that on April 15, 2005, Consolidated Edison Company of
New
[[Page 22025]]
York, Inc. (Con Edison) tendered for filing amendments to Con Edison's
Open Access Transmission Tariff, FERC Electric Tariff, First Revised
Volume No. 1. Con Edison states that the filing proposes to revise the
rate design for unbundled retail transmission service to customers that
own on-site electric generators. Con Edison requests an effective date
of June 14, 2005.
Comment Date: 5 p.m. eastern time on May 6, 2005.
16. Northeast Utilities Service Company
[Docket No. ER05-827-000]
Take notice that on April 15, 2005, Northeast Utilities Service
Company (NUSCO), on behalf of its operating company affiliates, The
Connecticut Light and Power Company (CL&P), Western Massachusetts
Electric Company (WMECO), Holyoke Water Power Company (HWP), Holyoke
Power and Electric Company (HP&E), and Public Service Company of New
Hampshire (PSNH), submitted a Notice of Cancellation of the Memorandum
of Understanding--Pooling of Generation and Transmission (NUG&T)
between CL&P, WMECO, HWP, and HP&E; Notice of Cancellation of the
Sharing Agreement between PSNH and CL&P; and Notice of Cancellation of
the Capacity Transfer Agreements between CL&P and PSNH.
NUSCO states that copies of the filing were served upon the NUSCO's
jurisdictional customers, Connecticut Department of Public Utility
Control, New Hampshire Public Utilities Commission, and Massachusetts
Department of Telecommunications and Energy.
Comment Date: 5 p.m. eastern time on May 6, 2005.
17. Northwestern Wisconsin Electric Company
[Docket No. ER05-828-000]
Take notice that April 15, 2005, Northwestern Wisconsin Electric
Company, (NWEC) tendered for filing proposed changes in its
Transmission Use Charge, Rate Schedule FERC No. 2. NWEC states that the
proposed changes would increase revenues from jurisdictional sales by
$4,409.20 based on the 12-month period ending April 30, 2005. NWEC also
states that it is proposing this rate schedule change to more
accurately reflect the actual cost of transmitting energy from one
utility to another based on current cost data. NWEC further states that
the service agreement for which this rate is calculated calls for the
Transmission Use Charge to be reviewed annually and revised on May 1.
NWEC requests an effective date of May 1, 2005.
NWEC states that copies of this filing have been provided to the
respective parties and to the Public Service Commission of Wisconsin.
Comment Date: 5 p.m. eastern time on May 6, 2005.
18. American Transmission Company LLC
[Docket No. ER05-829-000]
Take notice that on April 15, 2005, American Transmission Company
LLC (ATCLLC) tendered for filing a Distribution-Transmission
Interconnection Agreement between ATCLLC and Lodi Utilities. ATCLLC
requests an effective date of March 31, 2005.
ATCLLC states that it has served a copy of this filing on Lodi
Utilities, the Midwest ISO, and the Public Service Commission of
Wisconsin.
Comment Date: 5 p.m. eastern time on May 6, 2005.
19. Xcel Energy Services Inc.
[Docket No. ER05-830-000]
Take notice that on April 15, 2005, Xcel Energy Services Inc., on
behalf of Public Service Company of Colorado (PSCo), submitted an
Amended and Restated Generation Interconnection Agreement between Ridge
Crest Wind Partners, LLC and PSCo.
Comment Date: 5 p.m. eastern time on May 6, 2005.
20. East Texas Electric Cooperative, Inc.
[Docket No. ER05-831-000]
Take notice that on April 13, 2005, East Texas Electric
Cooperative, Inc. (ETEC) submitted for filing a withdrawal of its filed
rates, effective upon ETEC's April 13, 2005 receipt of Rural Utilities
Service guaranteed loan funds, ETEC will no longer meet the definition
of a ``public utility'' pursuant to section 201 of the Federal Power
Act, 16 U.S.C. 824 and thus will not be subject to regulation by the
Commission for so long as ETEC has RUS loan funds outstanding.
ETEC states that it has provided its three constituent members with
a copy of this filing.
Comment Date: 5 p.m. eastern time on May 4, 2005.
21. American Transmission Company LLC
[Docket No. ER05-833-000]
Take notice that on April 13, 2005, American Transmission Company
LLC (ATCLLC) tendered for filing an Amended and Restated Generation-
Transmission Interconnection Agreement among American Transmission
Company LLC, Wisconsin Electric Power Company, and the Midwest
Independent Transmission System Operator, Inc., (for the Elm Road
Generating Facility) Docket No. ER02-548-001. ATCLLC requests an
effective date of April 16, 2005.
Comment Date: 5 p.m. eastern time on May 4, 2005.
22. American Transmission Company LLC
[Docket No. ER05-834-000]
Take notice that on April 14, 2005, American Transmission Company
LLC (ATCLLC) tendered for filing an Amended and Restated Generation-
Transmission Interconnection Agreement among American Transmission
Company LLC, Wisconsin Electric Power Company, and the Midwest
Independent Transmission System Operator, Inc., (for Port Washington
Generating Facility) Docket No. ER02-548-001. ATCLLC requests an
effective date of April 17, 2005.
Comment Date: 5 p.m. eastern time on May 5, 2005.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov.
Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at http://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
[[Page 22026]]
(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-2039 Filed 4-27-05; 8:45 am]