The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. TransAlta Centralia Generation LLC
[Docket No. EG05-31-000]
On January 14, 2005, TransAlta Centralia Generation LLC (TACG)
filed with the Commission an application for redetermination of exempt
wholesale generator (EWG) status pursuant to part 365 of the
Commission's regulations.
TACG states that copies of the application were sent to the
Securities and Exchange Commission and the Oregon Public Utility
Commission, the Washington Utilities and Transportation Commission, the
California Public Utilities Commission, the Wyoming Public Service
Commission, the Idaho Public Utility Commission, and the Utah Public
Service Commission.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
2. Florida Power Corporation
[Docket No. ER97-2846-004]
Take notice that on December 23, 2004, Florida Power Corporation
submitted a compliance filing pursuant to the Commission's Orders
issued May 13, 2004 in Docket No. ER02-1406-001, et al., Arcadia Power
Partners, LLC, 107 FERC ] 61,168 and July 8, 2004 in Docket No. ER96-
2495-018, et al., AEP Power Marketing, Inc., 108 FERC ] 61,026.
Comment Date: 5 p.m. Eastern Time on February 3, 2005.
3. Central Vermont Public Service Corporation
[Docket No. ER98-2329-005]
Take notice that on January 13, 2005, Central Vermont Public
Service Corporation (Central Vermont) tendered for filing information
and data in support of its request for renewal of market-based rate
authority filed on October 25, 2004 in Docket No. ER98-2329-003, as
supplemented on November 9, 2005 in Docket No. ER98-2329-004.
Central Vermont states that a copy of the filing was served upon
all parties to the Commission's official service list in Docket Nos.
ER98-2329, the Vermont Public Service Board, and the New Hampshire
Public Utilities Commission.
Comment Date: 5 p.m. Eastern Time on February 3, 2005.
4. Hermiston Generating Company, L.P.
[Docket No. ER01-2159-005]
Take notice that on January 13, 2005, Hermiston Generating Company,
L.P. (Hermiston), submitted for filing a notice of a change in facts
with respect to its ownership that represents a departure from the
characteristics the Commission relied upon in granting market-based
rate authority to Hermiston.
Comment Date: 5 p.m. Eastern Time on February 3, 2005.
5. CalPeak Power--Midway LLC, CalPeak Power--Panoche LLC, CalPeak
Power--Vaca Dixon LLC, CalPeak Power--El Cajon LLC, CalPeak Power--
Enterprise LLC, CalPeak Power--Border LLC
[Docket Nos. ER01-2537-001, ER01-2543-001, ER01-2544-001, ER01-2545-
001, ER01-2546-001, ER01-2547-001]
Take notice that on January 13, 2005, CalPeak Power--Midway LLC,
CalPeak Power--Panoche LLC, CalPeak Power--Vaca Dixon LLC, CalPeak
Power--El Cajon LLC, CalPeak Power--Enterprise LLC, and CalPeak Power--
Border LLC (collectively, the CalPeak Entities) submitted a triennial
updated power analysis and revised tariff sheets to incorporate the
Commission's market behavior rules adopted in Investigation of Terms
and Conditions of Public Utility Market-Based Rate Authorizations, 105
FERC ] 61,218 (2003), order on reh'g, 107 FERC ] 61,175 (2004).
The CalPeak Entities state that copies of the filing were served
upon parties on the official service lists in above-captioned
proceedings.
Comment Date: 5 p.m. Eastern Time on February 3, 2005.
6. HC Power Marketing L.L.C.
[Docket No. ER02-388-003]
Take notice that on January 13, 2005, HC Power Marketing (HCPM)
submitted for filing a triennial updated market analysis.
HCPM states that copies of the filing were served upon the parties
listed on the official service list compiled by the Secretary in Docket
No. ER02-388.
[[Page 4835]]
Comment Date: 5 p.m. Eastern Time on February 3, 2005.
7. Southern California Edison Company
[Docket No. ER05-170-001]
Take notice that on January 13, 2005, Southern California Edison
Company (SCE) submitted the Devil Canyon Service Agreement for
Wholesale Distribution Service, Service Agreement No. 126, under FERC
Electric Tariff, First Revised Volume No. 5 as a supplement to its
November 2, 2004 filing under Docket No. ER05-170-000.
SCE states that copies of the filing were served upon those persons
whose names appear on the official service list compiled by the
Commission in this Docket No. ER05-170-000.
Comment Date: 5 p.m. Eastern Time on January 31, 2005.
8. Kansas City Power & Light Company
[Docket No. ER05-177-001]
Take notice that on January 14, 2005, Kansas City Power & Light
Company (KCPL) submitted a compliance filing pursuant to the
Commission's Order issued December 28, 2004 in Docket No. ER05-177-000.
KCPL states that this filing pertains to service schedules for the City
of Baldwin City, Kansas.
KCPL states that copies of the filing were served on the City of
Baldwin City, Kansas as well as the Missouri Public Service Commission
and the Kansas State Corporation Commission.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
9. Carolina Power & Light Company
[Docket No. ER05-183-000]
Take notice that on January 14, 2005, Carolina Power & Light
Company filed a notice of withdrawal of its November 4, 2004 filing in
Docket No. ER05-183-000 regarding a Generator Balancing Service
Schedule under the Open Access Transmission Tariffs of CP&L and Florida
Power Corporation.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
10. Virginia Electric and Power Company
[Docket No. ER05-197-001]
Take notice that on January 13, 2005, Virginia Electric and Power
Company (VEPCO) submitted for filing a response to the deficiency
letter issued on December 15, 2004 regarding VEPCO's November 8, 2004
filing in Docket No. ER005-197-000 of an executed Standard Large
Generator Interconnection Agreement with CPV Warren, LLC. VEPCO
requests an effective date of November 9, 2004.
VEPCO states that copies of the filing were served upon the
Commission's official service list in Docket No. ER05-197 and the
Virginia State Corporation Commission.
Comment Date: 5 p.m. Eastern Time on February 3, 2005.
11. JPMorgan Chase Bank, N.A.
[Docket No. ER05-283-001]
Take notice that on January 13, 2005, JPMorgan Chase Bank, N.A.
(JPMCB) filed an amendment to its December 2, 2004 filing in Docket No.
ER05-283-000 for acceptance of JPMCB's Rate Schedule FERC No. 1; the
granting of certain blanket approvals, including the authority to sell
electricity at market-based rates; and the waiver of certain Commission
regulations.
Comment Date: 5 p.m. Eastern Time on February 3, 2005.
12. Avista Energy, Inc.
[Docket No. ER05-313-001]
Take notice that on January 13, 2005, Avista Energy, Inc. (Avista
Energy) filed proposed revisions to its First Revised Rate Schedule
FERC No. 1 originally filed on December 7, 2004 in Docket No. ER05-313-
000.
Comment Date: 5 p.m. Eastern Time on February 3, 2005.
13. American Electric Power Service Corporation
[Docket No. ER05-450-000]
Take notice that on January 14, 2005, the American Electric Power
Service Corporation (AEPSC), tendered for filing an Interconnection and
Local Delivery Service Agreement between AEPSC and the City of
Dowagiac, Michigan, designated as Substitute Service Agreement No. 532
under the Operating Companies of the American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6. AEPSC requests an
effective date of January 1, 2005.
AEPSC states that a copy of the filing was served upon the Party
and the Michigan Public Service Commission.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
14. Wisconsin Electric Power Company
[Docket No. ER05-451-000]
Take notice that on January 14, 2005, Wisconsin Electric Power
Company (Wisconsin Electric) submitted for filing revised Exhibit No.
4.4 of two Generation-Transmission Must Run Agreements between
Wisconsin Electric and American Transmission Company, LLC (ATCLLC) to
reflect updated inputs to the formula rate applicable to the sale of
must run energy from several Wisconsin Electric generation units.
Wisconsin Electric requests an effective date of January 1, 2005.
Wisconsin Electric states that copies of this filing were served
upon ATCLLC, the Michigan Public Service Commission and the Public
Service Commission of Wisconsin.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
15. Public Service Company of New Mexico
[Docket No. ER05-452-000]
Take notice that on January 14, 2005, Public Service Company of New
Mexico (PNM) submitted for filing an executed service agreement for
firm point-to-point transmission service and ancillary services between
PNM Transmission Development and Contracts and PNM Wholesale Marketing,
under the terms of PNM's open access transmission tariff. PNM requests
an effective date of January 1, 2005.
PNM states that copies of the filing have been sent to PNM
Wholesale Marketing, PNM Transmission Development and Contracts, the
New Mexico Public Regulation Commission and the New Mexico Attorney
General.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
16. Wisconsin River Power Company
[Docket No. ER05-453-000]
Take notice that on January 14, 2005, Wisconsin River Power Company
(Wisconsin River) filed a market-based rate tariff for sales of energy
and capacity into the Midwest Independent Transmission System Operator,
Inc. (MISO) and the PJM Interconnection, L.L.C. (PJM) centralized
markets and minor revisions to two power sales agreements to facilitate
such sales. Wisconsin River requests an effective date of February 28,
2005.
Wisconsin River states that copies of the filing were served upon
PJM, MISO, and the Michigan Public Service Commission.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
17. Bear Swamp Power Company LLC
[Docket No. ER05-454-000]
Take notice that on January 14, 2005, Bear Swamp Power Company LLC
(Bear Swamp) submitted for filing, pursuant to section 205 of the
Federal Power Act and Part 35 of the Commission's regulations an
application for market-based rate authorization to sell energy,
capacity, and ancillary services, and reassign transmission capacity
and resell firm transmission rights. Bear Swamp also requests the
waivers and exemptions from regulations typically granted to the
holders of market-based rate authorization. Bear Swamp requests an
effective date of March 15, 2005.
[[Page 4836]]
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
18. Bellows Falls Power Company, LLC
[Docket No. ER05-455-000]
Take notice that on January 14, 2005, Bellows Falls Power Company,
LLC (Bellows Falls) submitted for filing, pursuant to section 205 of
the Federal Power Act and part 35 of the Commission's regulations an
application for market-based rate authorization to sell energy,
capacity, and ancillary services, and reassign transmission capacity
and resell firm transmission rights. Bellow Falls also requests the
waivers and exemptions from regulations typically granted to the
holders of market-based rate authorization. Bellows Falls requests an
effective date as of the date of closing on the lease of the Bellows
Falls Hydroelectric Project which is expected to occur by the end of
the first quarter of 2005.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
19. PJM Interconnection, L.L.C.
[Docket No. ER05-456-000]
Take notice that on January 14, 2005, PJM Interconnection, L.L.C.
(PJM), submitted for filing an executed interconnection service
agreement (ISA) among PJM, American Municipal Power-Ohio, Inc. as agent
for Ohio Municipal Electric Generation Joint Venture 5, and American
Electric Power Service Corporation as agent for Ohio Power Company
doing business as AEP, and a notice of cancellation of an interim
service agreement that has been superseded. PJM requests an effective
date of December 16, 2004 for the ISA.
PJM states that copies of this filing were served upon the parties
to the agreement and the state regulatory commissions within the PJM
region.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
20. Duquesne Light Company
[Docket No. ER05-457-000]
Take notice that on January 14, 2005, Duquesne Light Company
(Duquesne) submitted an amendment to an Interchange Agreement between
affiliates of FirstEnergy Corp. (FirstEnergy) and Duquesne to reflect
the disconnection and retirement from operation of one of the 69kV
transmission lines that interconnects the transmission systems of
FirstEnergy and Duquesne.
Duquesne states that copies of the filing were served on the state
regulatory commissions with jurisdiction over Duquesne and FirstEnergy.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
21. Wisconsin Electric Power Company
[Docket No. ER05-458-000]
Take notice that on January 14, 2005, Wisconsin Electric Power
Company (Wisconsin Electric) submitted proposed amendments to Wisconsin
Electric's Electric Tariff, Second Revised Volume No. 2. Wisconsin
Electric states that the amendments would revise Service Schedule F--
Dynamic Regulation and Frequency Response Service to broaden its
applicability to new generators locating within the control area
historically (prior to January 1, 2001) operated by Wisconsin Electric
Power Company and the historical service territory of Edison Sault
Electric Company (Wisconsin Electric Control Area). Wisconsin Electric
requests an effective date of March 15, 2005.
Wisconsin Electric states that copies of the filing were served on
its CST customers and on the state regulatory bodies in Wisconsin and
Michigan.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at http://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
[email protected], or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-354 Filed 1-28-05; 8:45 am]
BILLING CODE 6717-01-P